X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445030906022

Well Details

Well ID: 0445030906022
Loading map...
Location: 02/06-09-044-03W5/2
Location Alias: 02/06-09-44-03 W5M
Location Alias 2: 02/06-09-044-03 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 03
Section: 09
County/Municipality: Ponoka County
Well Name: NAL HZ SOUTH WROSES 6-9-44-3
Operator Name: NAL Resources Limited
License Number: 0458783
License Date: 2013-08-22
License Status: Amended
Spud Date: 2013-08-31
Final Drill Date: 2013-09-26
Well Total Depth: 3070.00 m
Surface Hole Latitude: 52.776327
Surface Hole Longitude: -114.356765

For data sources see[1][2]

Well History

Date Event
2013-08-22 Obtained License
2013-09-01 Surface Casing Operation Performed
2013-09-11 Direction Drilling Operation Performed - Deviate
2013-09-14 Direction Drilling Operation Performed - Horizontal
2013-09-15 Intermediate Casing Operation Performed
2013-09-22 Well Log Performed
2013-09-25 Well Log Performed
2013-09-26 Finished Drilling
2013-09-26 Well Log Performed
2013-09-26 Well Mode changed to Drilled and Cased
2013-09-28 Liner Casing Operation Performed
2013-09-29 Rig Released
2013-11-08 Well Log Performed
2013-11-11 Well Log Performed
2013-11-12 Perforation Treatment Performed - Jet Perforation
2013-11-13 Perforation Treatment Performed - Cement Squeeze
2013-11-17 Perforation Treatment Performed - Jet Perforation
2013-11-18 Perforation Treatment Performed - Cement Squeeze
2013-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2014-01-02 Well Began Production
2014-01-02 Well Fluid changed to Crude Oil
2014-01-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-09-11 1245.57 Deviate (5 - 79 degrees)
2013-09-14 2055.04 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-12 Perforation 400.00 401.00 20
2013-11-28 Multi-Stage Fracture 2631.30 2631.40 0
2013-11-28 Multi-Stage Fracture 2545.90 2546.00 0
2013-11-28 Multi-Stage Fracture 2450.70 2450.80 0
2013-11-28 Multi-Stage Fracture 2298.90 2299.00 0
2013-11-28 Multi-Stage Fracture 2222.30 2222.40 0
2013-11-28 Multi-Stage Fracture 2145.80 2145.90 0
2013-11-13 Cement Squeeze 400.00 401.00 0
2013-11-17 Perforation 157.00 158.00 20
2013-11-18 Cement Squeeze 157.00 158.00 0
2013-11-28 Multi-Stage Fracture 3061.70 3061.80 0
2013-11-28 Multi-Stage Fracture 3010.60 3010.70 0
2013-11-28 Multi-Stage Fracture 2937.20 2937.30 0
2013-11-28 Multi-Stage Fracture 2848.10 2848.20 0
2013-11-28 Multi-Stage Fracture 2740.80 2740.90 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-11-28 2013-11-28 1,749 358 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 37.5935 N/A
water 7732-18-5 100 39.4566 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 20.9865 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 1.1441 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0049 N/A
dibromoacetonitrile 3252-43-5 100 0.0049 N/A
non-hazardous ingredients Not Available 100 0.0049 N/A
polyethylene glycol 25322-68-3 100 0.0049 N/A
sodium bromide 7647-15-6 100 0.0049 N/A
EnCap-HP Trican Breaker ammonium persulfate 7727-54-0 100 0.0068 N/A
cured acrylic resin Not Available 100 0.0068 N/A
silica crystalline 14808-60-7 100 0.0068 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0858 N/A
water 7732-18-5 100 0.0858 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.4046 N/A
non-hazardous ingredients Not Available 100 0.4046 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.4046 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.4046 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.4046 N/A
WG-7L Trican Gelling Agent carboxymethyl cellulose sodium salt 9004-32-4 100 0.3169 N/A
naphtha (petroleum). hydrotreated heavy 64742-48-9 100 0.3169 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 8108 0.0 0.0 0.0
2015 7009 0.0 0.0 0.0
2016 8771 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8652 0.0 0.0 0.0
2019 8297 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-29 No Incident Encountered 0.00 0.00
2013-12-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References