X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445040813000

Well Details

Well ID: 0445040813000
Loading map...
Location: 00/13-08-044-04W5/0
Location Alias: 00/13-08-44-04 W5M
Location Alias 2: 00/13-08-044-04 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 04
Section: 08
County/Municipality: Ponoka County
Well Name: CLEARVIEW PEMBINA 13-8-44-4
Operator Name: Clearview Resources Ltd.
License Number: 0464812
License Date: 2014-02-07
License Status: Issued
Spud Date: 2014-03-08
Final Drill Date: 2014-03-16
Well Total Depth: 3314.00 m
Surface Hole Latitude: 52.781641
Surface Hole Longitude: -114.530772

For data sources see[1][2]

Well History

Date Event
2014-02-07 Obtained License
2014-03-08 Surface Casing Operation Performed
2014-03-11 Direction Drilling Operation Performed - Deviate
2014-03-12 Direction Drilling Operation Performed - Horizontal
2014-03-16 Finished Drilling
2014-03-16 Well Log Performed
2014-03-16 Well Mode changed to Drilled and Cased
2014-03-19 Production Casing Operation Performed
2014-03-19 Rig Released
2014-03-22 Well Log Performed
2014-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-29 Perforation Treatment Performed - Open-Hole Completion
2014-03-30 Well Began Production
2014-03-30 Well Fluid changed to Crude Oil
2014-03-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-08 Ensign Drilling Inc. 115 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-11 1252.70 Deviate (5 - 79 degrees)
2014-03-12 1951.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-29 Open Hole/Barefoot Completion 3299.00 3314.00 0
2014-03-29 Multi-Stage Fracture 2672.30 2672.40 0
2014-03-29 Multi-Stage Fracture 2600.90 2601.00 0
2014-03-29 Multi-Stage Fracture 2529.50 2529.60 0
2014-03-29 Multi-Stage Fracture 2444.70 2444.80 0
2014-03-29 Multi-Stage Fracture 2373.20 2373.30 0
2014-03-29 Multi-Stage Fracture 2301.70 2301.80 0
2014-03-29 Multi-Stage Fracture 2230.10 2230.20 0
2014-03-29 Multi-Stage Fracture 2145.10 2145.20 0
2014-03-29 Multi-Stage Fracture 2073.30 2073.40 0
2014-03-29 Multi-Stage Fracture 1999.80 1999.90 0
2014-03-29 Multi-Stage Fracture 3274.40 3274.50 0
2014-03-29 Multi-Stage Fracture 3199.70 3199.80 0
2014-03-29 Multi-Stage Fracture 3128.10 3128.20 0
2014-03-29 Multi-Stage Fracture 3042.90 3043.00 0
2014-03-29 Multi-Stage Fracture 2971.50 2971.60 0
2014-03-29 Multi-Stage Fracture 2900.00 2900.10 0
2014-03-29 Multi-Stage Fracture 2828.50 2828.60 0
2014-03-29 Multi-Stage Fracture 2743.80 2743.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-29 2014-03-29 1,659 1,905 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 5.3018 N/A
water Not Available 100 78.9782 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 14.5733 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.8068 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0134 N/A
dibromoacetonitrile 3252-43-5 100 0.0134 N/A
non-hazardous ingredients Not Available 100 0.0134 N/A
polyethylene glycol 25322-68-3 100 0.0134 N/A
sodium bromide 7647-15-6 100 0.0134 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0155 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1783 N/A
water Not Available 100 0.1783 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0456 N/A
propylene glycol 57-55-6 100 0.0456 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0867 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0867 N/A
non-hazardous ingredients Not Available 100 0.0867 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-25 2014-03-27 Groundwater - Non-saline less than or equal to 150m deep 1716
2014-03-25 2014-03-26 Recycled Fracturing Water (treated at well site) 321

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6068 0.0 0.0 0.0
2015 8668 0.0 0.0 0.0
2016 8761 0.0 0.0 0.0
2017 8576 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References