If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445051309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.787035,"lon":-114.609444,"icon":""}]} |
Location: 00/09-13-044-05W5/0 | |
Location Alias: 00/09-13-44-05 W5M | |
Location Alias 2: 00/09-13-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 13 | |
County/Municipality: Clearwater County | |
Well Name: TAC HZ PEMBINA 9-13-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0443574 | |
License Date: 2012-02-01 | |
License Status: Suspension | |
Spud Date: 2012-03-09 | |
Final Drill Date: 2012-03-16 | |
Well Total Depth: 3544.00 m | |
Surface Hole Latitude: 52.787035 | |
Surface Hole Longitude: -114.609444 |
Date | Event |
---|---|
2011-04-02 | Well Log Performed |
2012-02-01 | Obtained License |
2012-03-11 | Direction Drilling Operation Performed - Deviate |
2012-03-11 | Well Log Performed |
2012-03-12 | Surface Casing Operation Performed |
2012-03-14 | Direction Drilling Operation Performed - Horizontal |
2012-03-16 | Finished Drilling |
2012-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-16 | Well Log Performed |
2012-03-16 | Well Mode changed to Drilled and Cased |
2012-03-17 | Production Casing Operation Performed |
2012-03-18 | Rig Released |
2012-07-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-09 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-11 | 743.60 | Deviate (5 - 79 degrees) |
2012-03-14 | 2094.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-16 | Open Hole/Barefoot Completion | 3541.90 | 3544.00 | 0 |
2012-07-04 | Multi-Stage Fracture | 2971.30 | 2971.40 | 0 |
2012-07-04 | Multi-Stage Fracture | 2906.00 | 2907.90 | 0 |
2012-07-04 | Multi-Stage Fracture | 2804.80 | 2804.90 | 0 |
2012-07-04 | Multi-Stage Fracture | 2775.60 | 2775.70 | 0 |
2012-07-04 | Multi-Stage Fracture | 2711.00 | 2711.10 | 0 |
2012-07-04 | Multi-Stage Fracture | 2634.10 | 2634.20 | 0 |
2012-07-04 | Multi-Stage Fracture | 2569.40 | 2569.50 | 0 |
2012-07-04 | Multi-Stage Fracture | 2504.40 | 2504.50 | 0 |
2012-07-05 | Multi-Stage Fracture | 2439.90 | 2440.00 | 0 |
2012-07-05 | Multi-Stage Fracture | 2374.70 | 2374.80 | 0 |
2012-07-03 | Multi-Stage Fracture | 3514.50 | 3514.60 | 0 |
2012-07-05 | Multi-Stage Fracture | 2297.90 | 2298.00 | 0 |
2012-07-05 | Multi-Stage Fracture | 2233.20 | 2233.30 | 0 |
2012-07-03 | Multi-Stage Fracture | 3449.60 | 3449.70 | 0 |
2012-07-03 | Multi-Stage Fracture | 3384.50 | 3384.60 | 0 |
2012-07-03 | Multi-Stage Fracture | 3319.40 | 3319.50 | 0 |
2012-07-03 | Multi-Stage Fracture | 3242.70 | 3242.80 | 0 |
2012-07-03 | Multi-Stage Fracture | 3177.50 | 3177.60 | 0 |
2012-07-03 | Multi-Stage Fracture | 3100.80 | 3100.90 | 0 |
2012-07-03 | Multi-Stage Fracture | 3035.80 | 3035.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 8274 | 0.0 | 0.0 | 0.0 |
2014 | 2998 | 0.0 | 0.0 | 0.0 |
2015 | 8491 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 5063 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-16 | No Incident Encountered | 0.00 | 0.00 |
2012-07-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]