If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0445052616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.814032,"lon":-114.61782,"icon":""}]} |
| Location: 00/16-26-044-05W5/0 | |
| Location Alias: 00/16-26-44-05 W5M | |
| Location Alias 2: 00/16-26-044-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 26 | |
| County/Municipality: Clearwater County | |
| Well Name: TAC HZ MINHIK 16-26-44-5 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0443146 | |
| License Date: 2012-01-20 | |
| License Status: Issued | |
| Spud Date: 2012-02-17 | |
| Final Drill Date: 2012-02-25 | |
| Well Total Depth: 3435.00 m | |
| Surface Hole Latitude: 52.814032 | |
| Surface Hole Longitude: -114.617820 |
| Date | Event |
|---|---|
| 2012-01-20 | Obtained License |
| 2012-02-19 | Surface Casing Operation Performed |
| 2012-02-21 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-21 | Well Log Performed |
| 2012-02-25 | Finished Drilling |
| 2012-02-25 | Well Log Performed |
| 2012-02-25 | Well Mode changed to Drilled and Cased |
| 2012-02-26 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-02-26 | Production Casing Operation Performed |
| 2012-02-27 | Rig Released |
| 2012-03-20 | Well Log Performed |
| 2012-10-01 | Well Fluid changed to Crude Oil |
| 2012-10-01 | Well Mode changed to Drilling and Completing |
| 2012-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-01-01 | Well Began Production |
| 2013-01-01 | Well Fluid changed to Crude Oil |
| 2013-01-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-17 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-21 | 928.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-02-26 | Open Hole/Barefoot Completion | 3430.40 | 3435.00 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2816.30 | 2816.40 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2754.20 | 2754.30 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2681.20 | 2681.30 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2619.10 | 2619.20 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2556.70 | 2556.80 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2493.30 | 2493.40 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2430.10 | 2430.20 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2367.00 | 2367.10 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2305.40 | 2305.50 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2244.10 | 2244.20 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3411.90 | 3412.00 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2167.70 | 2167.80 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3338.40 | 3338.50 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3276.80 | 3276.90 | 0 |
| 2012-10-04 | Multi-Stage Fracture | 3214.20 | 3214.30 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 3088.70 | 3088.80 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 3027.70 | 3027.80 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2954.30 | 2954.40 | 0 |
| 2012-10-05 | Multi-Stage Fracture | 2893.00 | 2893.10 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 8337 | 0.0 | 0.0 | 0.0 |
| 2014 | 8670 | 0.0 | 0.0 | 0.0 |
| 2015 | 8108 | 0.0 | 0.0 | 0.0 |
| 2016 | 8351 | 0.0 | 0.0 | 0.0 |
| 2017 | 8660 | 0.0 | 0.0 | 0.0 |
| 2018 | 8739 | 0.0 | 0.0 | 0.0 |
| 2019 | 8750 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]