If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445053005000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.799759,"lon":-114.718031,"icon":""}]} |
Location: 00/05-30-044-05W5/0 | |
Location Alias: 00/05-30-44-05 W5M | |
Location Alias 2: 00/05-30-044-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 05 | |
Section: 30 | |
County/Municipality: Clearwater County | |
Well Name: TAC HZ PEMBINA 5-30-44-5 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0481138 | |
License Date: 2016-11-02 | |
License Status: Issued | |
Spud Date: 2016-11-21 | |
Final Drill Date: 2016-11-29 | |
Well Total Depth: 4247.00 m | |
Surface Hole Latitude: 52.799759 | |
Surface Hole Longitude: -114.718031 |
Date | Event |
---|---|
2016-11-02 | Obtained License |
2016-11-23 | Surface Casing Operation Performed |
2016-11-24 | Direction Drilling Operation Performed - Deviate |
2016-11-25 | Direction Drilling Operation Performed - Horizontal |
2016-11-29 | Finished Drilling |
2016-11-29 | Well Log Performed |
2016-11-29 | Well Mode changed to Drilled and Cased |
2016-11-30 | Production Casing Operation Performed |
2016-12-01 | Rig Released |
2017-01-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-08 | Well Began Production |
2017-01-08 | Well Fluid changed to Crude Oil |
2017-01-08 | Well Mode changed to Flowing |
2017-01-13 | Well Fluid changed to Crude Oil |
2017-01-13 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-11-22 | Excalibur Drilling Ltd. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-11-24 | 1469.30 | Deviate (5 - 79 degrees) |
2016-11-25 | 1834.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-02 | Multi-Stage Fracture | 4204.70 | 4205.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 3716.50 | 3718.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 3661.60 | 3663.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 3606.10 | 3607.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 3551.20 | 3552.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 3496.10 | 3497.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 3441.60 | 3443.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 3386.80 | 3388.40 | 0 |
2017-01-02 | Multi-Stage Fracture | 3332.40 | 3333.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 3276.80 | 3278.40 | 0 |
2017-01-02 | Multi-Stage Fracture | 3221.70 | 3223.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 4151.90 | 4153.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 3166.10 | 3167.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 3111.00 | 3112.60 | 0 |
2017-01-02 | Multi-Stage Fracture | 3055.60 | 3057.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 3000.60 | 3002.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 2944.90 | 2946.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 2888.90 | 2890.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 2833.30 | 2834.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 2777.70 | 2779.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 2721.90 | 2723.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 2667.00 | 2668.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 4097.40 | 4099.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2611.80 | 2613.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 2556.60 | 2558.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 2501.60 | 2503.10 | 0 |
2017-01-02 | Multi-Stage Fracture | 2446.60 | 2448.20 | 0 |
2017-01-02 | Multi-Stage Fracture | 2391.10 | 2392.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 2335.80 | 2337.30 | 0 |
2017-01-02 | Multi-Stage Fracture | 2280.40 | 2282.00 | 0 |
2017-01-02 | Multi-Stage Fracture | 2225.10 | 2226.60 | 0 |
2017-01-02 | Multi-Stage Fracture | 2169.20 | 2170.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 2114.50 | 2116.10 | 0 |
2017-01-02 | Multi-Stage Fracture | 4044.50 | 4046.10 | 0 |
2017-01-02 | Multi-Stage Fracture | 2059.30 | 2060.90 | 0 |
2017-01-02 | Multi-Stage Fracture | 2016.10 | 2017.70 | 0 |
2017-01-02 | Multi-Stage Fracture | 1973.80 | 1975.40 | 0 |
2017-01-02 | Multi-Stage Fracture | 3988.90 | 3990.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 3935.00 | 3936.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 3880.90 | 3882.40 | 0 |
2017-01-02 | Multi-Stage Fracture | 3825.90 | 3827.50 | 0 |
2017-01-02 | Multi-Stage Fracture | 3770.00 | 3771.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-02 | 2017-01-02 | 1,714 | 4,208 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.2408 | N/A | |||
20/40 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 15.0523 | N/A | ||
30/50 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.423 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0086 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0086 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0086 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.155 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.155 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0756 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0756 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0756 | N/A | ||||
SML-7 (Metal to Metal Lubricant) | Step Energy Services | Friction Reducer | Non-Hazardous Ingredients | Not Available | 100 | 0.0655 | N/A | |
SSI-1 (Scale Inhibitor) | Step Energy Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.017 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.017 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0258 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0258 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0258 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0258 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0258 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0258 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0258 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-02 | 2017-01-04 | Surface Water - Lake | 4208 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 8310 | 0.0 | 0.0 | 0.0 |
2018 | 8637 | 0.0 | 0.0 | 0.0 |
2019 | 8459 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-01 | No Incident Encountered | 0.00 | 0.00 |
2017-01-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]