If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0445053616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.846383,"lon":-114.613823,"icon":""}]} |
| Location: 00/16-36-044-05W5/0 | |
| Location Alias: 00/16-36-44-05 W5M | |
| Location Alias 2: 00/16-36-044-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 36 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: TAC HZ PEMBINA 16-36-44-5 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0438097 | |
| License Date: 2011-10-27 | |
| License Status: Issued | |
| Spud Date: 2011-12-06 | |
| Final Drill Date: 2011-12-13 | |
| Well Total Depth: 3358.00 m | |
| Surface Hole Latitude: 52.846383 | |
| Surface Hole Longitude: -114.613823 |
| Date | Event |
|---|---|
| 2011-10-27 | Obtained License |
| 2011-11-25 | Surface Casing Operation Performed |
| 2011-12-08 | Direction Drilling Operation Performed - Horizontal |
| 2011-12-08 | Well Log Performed |
| 2011-12-13 | Finished Drilling |
| 2011-12-13 | Production Casing Operation Performed |
| 2011-12-13 | Well Log Performed |
| 2011-12-13 | Well Mode changed to Drilled and Cased |
| 2011-12-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-12-14 | Rig Released |
| 2012-01-06 | Well Log Performed |
| 2012-09-01 | Well Fluid changed to Crude Oil |
| 2012-09-01 | Well Mode changed to Drilling and Completing |
| 2012-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-01 | Well Began Production |
| 2012-12-01 | Well Fluid changed to Crude Oil |
| 2012-12-01 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-12-08 | 919.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-12-14 | Open Hole/Barefoot Completion | 3349.00 | 3358.00 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2733.20 | 2733.30 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2656.70 | 2656.80 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2580.50 | 2580.60 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2503.70 | 2503.80 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2427.00 | 2427.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2350.50 | 2350.60 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2285.60 | 2285.70 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2220.30 | 2220.40 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2160.70 | 2160.80 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2096.90 | 2097.00 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3333.00 | 3333.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 2047.00 | 2047.10 | 0 |
| 2012-09-19 | Multi-Stage Fracture | 1998.20 | 1998.30 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3244.90 | 3245.00 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3168.50 | 3168.60 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3103.40 | 3103.50 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 3027.70 | 3027.80 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2962.70 | 2962.80 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2886.50 | 2886.60 | 0 |
| 2012-09-18 | Multi-Stage Fracture | 2809.90 | 2810.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 445 | 0.0 | 0.0 | 0.0 |
| 2013 | 8568 | 0.0 | 0.0 | 0.0 |
| 2014 | 8688 | 0.0 | 0.0 | 0.0 |
| 2015 | 8217 | 0.0 | 0.0 | 0.0 |
| 2016 | 8252 | 0.0 | 0.0 | 0.0 |
| 2017 | 8463 | 0.0 | 0.0 | 0.0 |
| 2018 | 8741 | 0.0 | 0.0 | 0.0 |
| 2019 | 8628 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]