If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445090111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.764812,"lon":-115.176473,"icon":""}]} |
Location: 00/11-01-044-09W5/0 | |
Location Alias: 00/11-01-44-09 W5M | |
Location Alias 2: 00/11-01-044-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Clearwater County | |
Well Name: UNION BAPTISTE RIVER NO. 11-1 | |
Operator Name: Chevron Canada Properties Limited | |
License Number: 0008848 | |
License Date: 1954-12-08 | |
License Status: RecExempt | |
Spud Date: 1954-12-20 | |
Final Drill Date: 1955-03-23 | |
Well Total Depth: 2648.70 m | |
Surface Hole Latitude: 52.764812 | |
Surface Hole Longitude: -115.176473 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-12-08 | Obtained License |
1955-01-15 | Drill Stem Test Performed |
1955-03-17 | Drill Stem Test Performed |
1955-03-23 | Drill Stem Test Performed |
1955-03-23 | Finished Drilling |
1955-03-23 | Well Mode changed to Drilled and Cased |
1955-03-31 | Production Casing Operation Performed |
1955-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-08-29 | Perforation Treatment Performed - Bullet Perforation |
1955-08-29 | Perforation Treatment Performed - Fractured |
1955-10-05 | Perforation Treatment Performed - Cement Squeeze |
1955-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-10-24 | Perforation Treatment Performed - Bullet Perforation |
1955-10-27 | Perforation Treatment Performed - Fractured |
1956-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-10-07 | Perforation Treatment Performed - Bullet Perforation |
1956-10-07 | Perforation Treatment Performed - Fractured |
1956-10-07 | Perforation Treatment Performed - Jet Perforation |
1956-12-07 | Well Began Production |
1956-12-07 | Well Fluid changed to Crude Oil |
1956-12-07 | Well Mode changed to Flowing |
1957-03-11 | Perforation Treatment Performed - Cement Plug |
1957-03-11 | Well Abandoned |
1957-03-11 | Well Fluid changed to Crude Oil |
1957-03-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-08-29 | Bullet Perforation | 1937.90 | 1940.40 | 13 |
1955-10-24 | Acid Treatment | 1925.40 | 1934.30 | 0 |
1955-10-27 | Fracture | 1925.40 | 1934.30 | 0 |
1956-10-01 | Acid Treatment | 1925.40 | 1934.30 | 0 |
1956-10-07 | Bullet Perforation | 1930.90 | 1932.10 | 13 |
1956-10-07 | Bullet Perforation | 1928.80 | 1929.70 | 13 |
1956-10-07 | Bullet Perforation | 1925.40 | 1927.90 | 13 |
1956-10-07 | Perforation | 1930.30 | 1932.10 | 13 |
1956-10-07 | Perforation | 1928.80 | 1929.70 | 13 |
1956-10-07 | Perforation | 1925.40 | 1927.90 | 13 |
1956-10-07 | Acid Treatment | 1925.40 | 1932.10 | 0 |
1955-08-29 | Bullet Perforation | 1942.50 | 1944.30 | 13 |
1956-10-07 | Fracture | 1925.40 | 1932.10 | 0 |
1957-03-11 | Cement Plug | 1889.80 | 1930.90 | 0 |
1955-08-29 | Acid Treatment | 1937.90 | 1944.30 | 0 |
1955-08-29 | Fracture | 1937.90 | 1944.30 | 0 |
1955-10-05 | Cement Squeeze | 1937.90 | 1944.30 | 0 |
1955-10-24 | Bullet Perforation | 1925.40 | 1927.90 | 20 |
1955-10-24 | Bullet Perforation | 1928.80 | 1929.70 | 20 |
1955-10-24 | Bullet Perforation | 1930.90 | 1932.10 | 20 |
1955-10-24 | Bullet Perforation | 1933.30 | 1934.30 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]