If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0445103016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.813485,"lon":-115.435678,"icon":""}]} |
| Location: 00/16-30-044-10W5/0 | |
| Location Alias: 00/16-30-44-10 W5M | |
| Location Alias 2: 00/16-30-044-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 30 | |
| County/Municipality: Clearwater County | |
| Well Name: BELLATRIX HZ FERRIER 16-30-44-10 | |
| Operator Name: Bellatrix Exploration Ltd. | |
| License Number: 0461002 | |
| License Date: 2013-11-13 | |
| License Status: Amended | |
| Spud Date: 2014-02-15 | |
| Final Drill Date: 2014-02-28 | |
| Well Total Depth: 3600.00 m | |
| Surface Hole Latitude: 52.813485 | |
| Surface Hole Longitude: -115.435678 |
| Date | Event |
|---|---|
| 2013-11-13 | Obtained License |
| 2014-02-17 | Surface Casing Operation Performed |
| 2014-02-20 | Direction Drilling Operation Performed - Deviate |
| 2014-02-21 | Well Log Performed |
| 2014-02-23 | Intermediate Casing Operation Performed |
| 2014-02-23 | Lost Circulation Occurred |
| 2014-02-24 | Liner Casing Operation Performed |
| 2014-02-26 | Direction Drilling Operation Performed - Horizontal |
| 2014-02-28 | Finished Drilling |
| 2014-02-28 | Well Log Performed |
| 2014-02-28 | Well Mode changed to Drilled and Cased |
| 2014-03-01 | Well Log Performed |
| 2014-03-05 | Rig Released |
| 2014-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-04-09 | Well Began Production |
| 2014-04-09 | Well Fluid changed to Gas |
| 2014-04-09 | Well Mode changed to Flowing |
| 2016-02-17 | Well Fluid changed to Gas |
| 2016-02-17 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-02-15 | Beaver Drilling Ltd. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-02-20 | 1648.10 | Deviate (5 - 79 degrees) |
| 2014-02-26 | 2349.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-03-16 | Open Hole/Barefoot Completion | 3595.00 | 3600.00 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2956.40 | 2956.50 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2873.20 | 2873.30 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2790.00 | 2790.10 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2720.30 | 2720.40 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2637.10 | 2637.20 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2567.50 | 2567.60 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2484.30 | 2484.40 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2414.60 | 2414.70 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 2331.40 | 2331.50 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3572.30 | 3572.40 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3495.80 | 3495.90 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3412.50 | 3412.60 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3342.80 | 3342.90 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3261.10 | 3261.20 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3177.90 | 3178.00 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3109.30 | 3109.40 | 0 |
| 2014-03-16 | Multi-Stage Fracture | 3026.10 | 3026.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-03-16 | 2014-03-16 | 2,076 | 2,924 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 79.7505 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.424 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.2734 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.2373 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0127 | N/A | |
| Water | 7732-18-5 | 100 | 0.0135 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.18 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0833 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0854 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0834 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0971 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0833 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0852 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0854 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.4737 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0863 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-03-12 | 2014-03-14 | Surface Water - River | 3133 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 6372 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8627 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 7964 | 0.0 | 0.0 | 0.0 |
| 2019 | 2684 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-02-23 | Lost Circulation | 2277.00 | 2277.00 |
| 2014-03-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]