If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0445103501020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.843099,"lon":-115.352515,"icon":""}]} |
Location: 02/01-35-044-10W5/0 | |
Location Alias: 02/01-35-44-10 W5M | |
Location Alias 2: 02/01-35-044-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 5 | |
Range: 10 | |
Section: 35 | |
County/Municipality: O'Chiese 203 | |
Well Name: BELLATRIX UMNV FERRIER 1-35-44-10 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0487448 | |
License Date: 2017-12-20 | |
License Status: Issued | |
Spud Date: 2018-01-24 | |
Final Drill Date: 2018-01-31 | |
Well Total Depth: 4300.00 m | |
Surface Hole Latitude: 52.843099 | |
Surface Hole Longitude: -115.352515 |
Date | Event |
---|---|
2017-12-20 | Obtained License |
2018-01-25 | Surface Casing Operation Performed |
2018-01-27 | Direction Drilling Operation Performed - Deviate |
2018-01-28 | Direction Drilling Operation Performed - Horizontal |
2018-01-28 | Well Log Performed |
2018-01-29 | Lost Circulation Occurred |
2018-01-31 | Finished Drilling |
2018-01-31 | Lost Circulation Occurred |
2018-01-31 | Well Log Performed |
2018-01-31 | Well Mode changed to Drilled and Cased |
2018-02-01 | Well Log Performed |
2018-02-02 | Production Casing Operation Performed |
2018-02-02 | Rig Released |
2018-02-09 | Well Log Performed |
2018-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-23 | Perforation Treatment Performed - Open-Hole Completion |
2018-02-23 | Well Fluid changed to Gas |
2018-02-23 | Well Mode changed to Testing |
2018-02-24 | Well Began Production |
2018-02-24 | Well Fluid changed to Gas |
2018-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-24 | Savanna Drilling Corp. | 679 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-27 | 778.50 | Deviate (5 - 79 degrees) |
2018-01-28 | 2472.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-23 | Open Hole/Barefoot Completion | 4297.00 | 4300.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 3627.30 | 3627.40 | 0 |
2018-02-23 | Multi-Stage Fracture | 3554.40 | 3554.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 3467.30 | 3467.40 | 0 |
2018-02-23 | Multi-Stage Fracture | 3379.70 | 3379.80 | 0 |
2018-02-23 | Multi-Stage Fracture | 3306.80 | 3306.90 | 0 |
2018-02-23 | Multi-Stage Fracture | 3219.90 | 3220.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 3133.10 | 3133.20 | 0 |
2018-02-23 | Multi-Stage Fracture | 3060.40 | 3060.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 2973.40 | 2973.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 2886.00 | 2886.10 | 0 |
2018-02-23 | Multi-Stage Fracture | 4271.30 | 4271.40 | 0 |
2018-02-23 | Multi-Stage Fracture | 2812.80 | 2812.90 | 0 |
2018-02-23 | Multi-Stage Fracture | 2725.40 | 2725.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 2637.70 | 2637.80 | 0 |
2018-02-23 | Multi-Stage Fracture | 2578.80 | 2578.90 | 0 |
2018-02-23 | Multi-Stage Fracture | 4206.70 | 4206.80 | 0 |
2018-02-23 | Multi-Stage Fracture | 4119.00 | 4119.10 | 0 |
2018-02-23 | Multi-Stage Fracture | 4046.10 | 4046.20 | 0 |
2018-02-23 | Multi-Stage Fracture | 3959.00 | 3959.10 | 0 |
2018-02-23 | Multi-Stage Fracture | 3873.40 | 3873.50 | 0 |
2018-02-23 | Multi-Stage Fracture | 3800.90 | 3801.00 | 0 |
2018-02-23 | Multi-Stage Fracture | 3714.10 | 3714.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-23 | 2018-02-23 | 2,332 | 3,674 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.2138 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.8324 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 14.6147 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0103 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0103 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0103 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0103 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0103 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1724 | N/A | |
DWP-959 | Calfrac | Demulsifier | Methanol | 67-56-1 | 100 | 0.0738 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0738 | N/A | ||||
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0822 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-23 | 2018-02-23 | Central Water Distribution Facility | 4741 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6342 | 0.0 | 0.0 | 0.0 |
2019 | 8576 | 0.0 | 0.0 | 0.0 |
2020 | 2153 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-29 | Lost Circulation | 2948.00 | 2948.00 |
2018-01-31 | Lost Circulation | 4300.00 | 4300.00 |
2018-02-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]