X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445113504000

Well Details

Well ID: 0445113504000
Loading map...
Location: 00/04-35-044-11W5/0
Location Alias: 00/04-35-44-11 W5M
Location Alias 2: 00/04-35-044-11 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 11
Section: 35
County/Municipality: O'Chiese 203
Well Name: BELLATRIX HZ BRAZR 4-35-44-11
Operator Name: Bellatrix Exploration Ltd.
License Number: 0445968
License Date: 2012-05-18
License Status: Issued
Spud Date: 2012-11-16
Final Drill Date: 2012-12-02
Well Total Depth: 3552.00 m
Surface Hole Latitude: 52.842792
Surface Hole Longitude: -115.493558

For data sources see[1][2]

Well History

Date Event
2012-05-18 Obtained License
2012-11-19 Surface Casing Operation Performed
2012-11-22 Direction Drilling Operation Performed - Deviate
2012-11-23 Direction Drilling Operation Performed - Horizontal
2012-11-24 Well Log Performed
2012-11-25 Well Log Performed
2012-11-26 Intermediate Casing Operation Performed
2012-11-26 Lost Circulation Occurred
2012-12-02 Finished Drilling
2012-12-02 Well Log Performed
2012-12-02 Well Mode changed to Drilled and Cased
2012-12-04 Liner Casing Operation Performed
2012-12-05 Rig Released
2012-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-13 Perforation Treatment Performed - Open-Hole Completion
2012-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-14 Well Began Production
2012-12-14 Well Fluid changed to Crude Oil
2012-12-14 Well Mode changed to Flowing
2013-03-01 Well Fluid changed to Crude Oil
2013-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-16 Chinook Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-22 1761.30 Deviate (5 - 79 degrees)
2012-11-23 2060.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-13 Open Hole/Barefoot Completion 3547.00 3552.00 0
2012-12-13 Multi-Stage Fracture 2898.40 2898.50 0
2012-12-14 Multi-Stage Fracture 2808.40 2808.50 0
2012-12-14 Multi-Stage Fracture 2738.50 2738.60 0
2012-12-14 Multi-Stage Fracture 2655.60 2655.70 0
2012-12-14 Multi-Stage Fracture 2575.40 2575.50 0
2012-12-14 Multi-Stage Fracture 2492.70 2492.80 0
2012-12-14 Multi-Stage Fracture 2423.90 2424.00 0
2012-12-13 Multi-Stage Fracture 3525.10 3525.20 0
2012-12-13 Multi-Stage Fracture 3446.70 3446.80 0
2012-12-13 Multi-Stage Fracture 3366.00 3366.10 0
2012-12-13 Multi-Stage Fracture 3287.10 3287.20 0
2012-12-13 Multi-Stage Fracture 3209.00 3210.00 0
2012-12-13 Multi-Stage Fracture 3131.80 3131.90 0
2012-12-13 Multi-Stage Fracture 3055.40 3055.50 0
2012-12-13 Multi-Stage Fracture 2977.60 2977.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 391 0.0 0.0 0.0
2013 8611 0.0 0.0 0.0
2014 8473 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7769 0.0 0.0 0.0
2018 8167 0.0 0.0 0.0
2019 8493 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-26 Lost Circulation 2364.60 2364.60
2012-12-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References