X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445142213032

Well Details

Well ID: 0445142213032
Loading map...
Location: 03/13-22-044-14W5/2
Location Alias: 03/13-22-44-14 W5M
Location Alias 2: 03/13-22-044-14 W5/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 14
Section: 22
County/Municipality: Clearwater County
Well Name: TOURMALINE 103 HZ BRAZR 13-22-44-14
Operator Name: Tourmaline Oil Corp.
License Number: 0496846
License Date: 2019-12-09
License Status: Issued
Spud Date: 2020-01-24
Final Drill Date: 2020-02-28
Well Total Depth: 4791.00 m
Surface Hole Latitude: 52.798014
Surface Hole Longitude: -115.958898

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2020-02-14 2672.50 Deviate (5 - 79 degrees)
2020-02-15 3000.60 Horizontal
2020-02-24 3267.00 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-12 Multi-Stage Fracture 4725.90 4726.00 0
2020-03-12 Multi-Stage Fracture 4263.90 4264.00 0
2020-03-12 Multi-Stage Fracture 4211.40 4211.50 0
2020-03-12 Multi-Stage Fracture 4159.10 4159.20 0
2020-03-12 Multi-Stage Fracture 4106.50 4106.60 0
2020-03-12 Multi-Stage Fracture 4053.90 4054.00 0
2020-03-12 Multi-Stage Fracture 4001.30 4001.40 0
2020-03-12 Multi-Stage Fracture 3948.50 3948.60 0
2020-03-12 Multi-Stage Fracture 3895.90 3896.00 0
2020-03-12 Multi-Stage Fracture 3843.20 3843.30 0
2020-03-12 Multi-Stage Fracture 3790.60 3790.70 0
2020-03-12 Multi-Stage Fracture 4684.60 4684.70 0
2020-03-12 Multi-Stage Fracture 3738.00 3738.10 0
2020-03-12 Multi-Stage Fracture 3738.10 3738.20 0
2020-03-12 Multi-Stage Fracture 3685.10 3685.20 0
2020-03-12 Multi-Stage Fracture 3632.60 3632.70 0
2020-03-12 Multi-Stage Fracture 3580.50 3580.60 0
2020-03-12 Multi-Stage Fracture 3528.10 3528.20 0
2020-03-12 Multi-Stage Fracture 3475.80 3475.90 0
2020-03-12 Multi-Stage Fracture 3424.00 3424.10 0
2020-03-12 Multi-Stage Fracture 3371.20 3371.30 0
2020-03-12 Multi-Stage Fracture 3319.90 3320.00 0
2020-03-12 Multi-Stage Fracture 4632.10 4632.20 0
2020-03-12 Multi-Stage Fracture 3292.60 3292.70 0
2020-03-12 Multi-Stage Fracture 4579.90 4580.00 0
2020-03-12 Multi-Stage Fracture 4527.90 4528.00 0
2020-03-12 Multi-Stage Fracture 4475.00 4475.10 0
2020-03-12 Multi-Stage Fracture 4422.10 4422.20 0
2020-03-12 Multi-Stage Fracture 4369.60 4369.70 0
2020-03-12 Multi-Stage Fracture 4316.70 4316.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 336 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-28 No Incident Encountered 0.00 0.00
2020-03-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References