If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0445143107022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.84159,"lon":-116.033347,"icon":""}]} |
| Location: 02/07-31-044-14W5/2 | |
| Location Alias: 02/07-31-44-14 W5M | |
| Location Alias 2: 02/07-31-044-14 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 5 | |
| Range: 14 | |
| Section: 31 | |
| County/Municipality: Clearwater County | |
| Well Name: FAIRBORNE BRAZR 7-31-44-14 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0402078 | |
| License Date: 2008-10-09 | |
| License Status: Amended | |
| Spud Date: 2009-01-16 | |
| Final Drill Date: 2009-03-20 | |
| Well Total Depth: 4394.00 m | |
| Surface Hole Latitude: 52.841590 | |
| Surface Hole Longitude: -116.033347 |
| Date | Event |
|---|---|
| 2008-10-09 | Obtained License |
| 2009-01-18 | Surface Casing Operation Performed |
| 2009-01-30 | Intermediate Casing Operation Performed |
| 2009-02-04 | Direction Drilling Operation Performed - Deviate |
| 2009-02-12 | Production Casing Operation Performed |
| 2009-02-16 | Direction Drilling Operation Performed - Horizontal |
| 2009-02-27 | Direction Drilling Operation Performed - Sidetrack Fish |
| 2009-03-20 | Finished Drilling |
| 2009-03-20 | Well Mode changed to Drilled and Cased |
| 2009-03-24 | Liner Casing Operation Performed |
| 2009-04-07 | Rig Released |
| 2009-04-09 | Perforation Treatment Performed - Fractured |
| 2009-04-09 | Perforation Treatment Performed - Jet Perforation |
| 2009-04-10 | Perforation Treatment Performed - Fractured |
| 2009-04-10 | Perforation Treatment Performed - Jet Perforation |
| 2009-05-04 | Well Began Production |
| 2009-05-04 | Well Fluid changed to Gas |
| 2009-05-04 | Well Mode changed to Flowing |
| 2009-06-12 | Well Log Performed |
| 2009-10-11 | Well Log Performed |
| 2009-10-12 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2009-10-13 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2009-10-13 | Well Log Performed |
| 2010-09-28 | Well Log Performed |
| 2011-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-11-02 | Plug Back Performed |
| 2011-11-02 | Well Fluid changed to Gas |
| 2011-11-02 | Well Mode changed to Abandoned Zone |
| 2011-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-11-04 | Plug Back Performed |
| 2011-11-16 | Perforation Treatment Performed - Jet Perforation |
| 2011-11-18 | Perforation Treatment Performed - Fractured |
| 2011-11-19 | Perforation Treatment Performed - Fractured |
| 2011-11-19 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-02-04 | 3013.40 | Deviate (5 - 79 degrees) |
| 2009-02-16 | 3413.20 | Horizontal |
| 2009-02-27 | 3735.60 | Sidetrack fish |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-04-09 | Perforation | 4337.50 | 4338.50 | 17 |
| 2009-04-10 | Fracture | 3887.70 | 3888.70 | 0 |
| 2009-04-10 | Perforation | 3800.70 | 3801.70 | 17 |
| 2009-04-10 | Fracture | 3800.70 | 3801.70 | 0 |
| 2009-04-10 | Perforation | 3675.00 | 3676.00 | 17 |
| 2009-04-10 | Fracture | 3675.00 | 3676.00 | 0 |
| 2009-04-10 | Perforation | 3586.90 | 3587.90 | 17 |
| 2009-04-10 | Fracture | 3586.90 | 3587.90 | 0 |
| 2009-10-12 | Casing Patch | 3800.70 | 3801.70 | 0 |
| 2009-10-13 | Casing Patch | 3675.00 | 3676.00 | 0 |
| 2011-11-02 | Packing Device Capped w/Cement | 3345.00 | 3353.00 | 0 |
| 2009-04-09 | Fracture | 4337.50 | 4338.50 | 0 |
| 2011-11-04 | Packing Device Capped w/Cement | 3292.00 | 3299.00 | 0 |
| 2011-11-16 | Perforation | 3285.00 | 3287.00 | 17 |
| 2011-11-18 | Fracture | 3285.00 | 3287.00 | 0 |
| 2011-11-19 | Perforation | 3254.00 | 3257.00 | 17 |
| 2011-11-19 | Fracture | 3254.00 | 3257.00 | 0 |
| 2009-04-09 | Perforation | 4199.70 | 4200.70 | 17 |
| 2009-04-09 | Fracture | 4199.70 | 4200.70 | 0 |
| 2009-04-09 | Perforation | 4062.00 | 4063.00 | 17 |
| 2009-04-09 | Fracture | 4062.00 | 4063.00 | 0 |
| 2009-04-10 | Perforation | 3962.10 | 3963.10 | 17 |
| 2009-04-10 | Fracture | 3962.10 | 3963.10 | 0 |
| 2009-04-10 | Perforation | 3887.70 | 3888.70 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 1291 | 0.0 | 0.0 | 0.0 |
| 2010 | 616 | 0.0 | 0.0 | 0.0 |
| 2011 | 340 | 0.0 | 0.0 | 0.0 |
For data sources see[6]