If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454170215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.854933,"lon":-112.358308,"icon":""}]} |
Location: 00/15-02-045-17W4/0 | |
Location Alias: 00/15-02-45-17 W4M | |
Location Alias 2: 00/15-02-045-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 17 | |
Section: 02 | |
County/Municipality: Camrose County | |
Well Name: SIGNALTA ET AL HOLMBERG 15-2-45-17 | |
Operator Name: Signalta Resources Limited | |
License Number: 0092062 | |
License Date: 1981-09-02 | |
License Status: RecCertified | |
Spud Date: 1981-09-04 | |
Final Drill Date: 1981-09-12 | |
Well Total Depth: 1125.00 m | |
Surface Hole Latitude: 52.854933 | |
Surface Hole Longitude: -112.358308 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-09-02 | Obtained License |
1981-09-10 | Drill Stem Test Performed |
1981-09-12 | Finished Drilling |
1981-09-13 | Drill Stem Test Performed |
1981-09-14 | Production Casing Operation Performed |
1981-09-14 | Well Mode changed to Drilled and Cased |
1998-05-23 | Perforation Treatment Performed - Jet Perforation |
1998-05-23 | Well Log Performed |
2001-04-01 | Well Began Production |
2001-04-01 | Well Fluid changed to Gas |
2001-04-01 | Well Mode changed to Flowing |
2001-12-31 | Well Fluid changed to Gas |
2001-12-31 | Well Mode changed to Suspended |
2010-11-04 | Perforation Treatment Performed - Cement Plug |
2010-11-04 | Plug Back Performed |
2010-11-04 | Well Fluid changed to Gas |
2010-11-04 | Well Mode changed to Abandoned Zone |
2010-11-05 | Perforation Treatment Performed - Jet Perforation |
2010-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-06 | Perforation Treatment Performed - Remedial Casing |
2010-11-10 | Well Abandoned |
2010-11-10 | Well Fluid changed to Gas |
2010-11-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-05-23 | Perforation | 1022.00 | 1024.00 | 13 |
1998-05-23 | Perforation | 1004.50 | 1006.50 | 13 |
2010-11-04 | Cement Plug | 895.00 | 1040.30 | 0 |
2010-11-05 | Perforation | 288.00 | 289.00 | 13 |
2010-11-06 | Remedial Casing Cementing | 288.00 | 289.00 | 0 |
2010-11-06 | Packing Device Capped w/Cement | 270.00 | 278.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 2774 | 0.0 | 0.0 | 0.0 |
For data sources see[5]