If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454172108003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.890832,"lon":-112.403894,"icon":""}]} |
Location: 00/08-21-045-17W4/3 | |
Location Alias: 00/08-21-45-17 W4M | |
Location Alias 2: 00/08-21-045-17 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 17 | |
Section: 21 | |
County/Municipality: Camrose County | |
Well Name: VOYAGER ET AL HOLMBERG 8-21-45-17 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0123936 | |
License Date: 1986-09-17 | |
License Status: Abandoned | |
Spud Date: 1986-09-21 | |
Final Drill Date: 1986-09-26 | |
Well Total Depth: 1122.50 m | |
Surface Hole Latitude: 52.890832 | |
Surface Hole Longitude: -112.403894 |
Date | Event |
---|---|
1986-09-17 | Obtained License |
1986-09-21 | Surface Casing Operation Performed |
1986-09-24 | Drill Stem Test Performed |
1986-09-26 | Finished Drilling |
1986-09-26 | Well Log Performed |
1986-09-26 | Well Mode changed to Drilled and Cased |
1986-09-28 | Production Casing Operation Performed |
1986-09-28 | Rig Released |
1986-10-16 | Well Log Performed |
1986-10-17 | Perforation Treatment Performed - Jet Perforation |
1989-06-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-06-22 | Plug Back Performed |
1989-06-23 | Perforation Treatment Performed - Jet Perforation |
1989-06-23 | Well Log Performed |
1989-07-31 | Well Began Production |
1989-07-31 | Well Fluid changed to Gas |
1989-07-31 | Well Mode changed to Flowing |
1990-03-01 | Well Fluid changed to Gas |
1990-03-01 | Well Mode changed to Suspended |
2003-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-09 | Plug Back Performed |
2003-08-09 | Well Fluid changed to Gas |
2003-08-09 | Well Mode changed to Abandoned Zone |
2003-08-14 | Well Abandoned |
2003-08-14 | Well Fluid changed to Gas |
2003-08-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-10-17 | Perforation | 1052.50 | 1053.50 | 13 |
1986-10-17 | Perforation | 1049.00 | 1050.00 | 13 |
1986-10-17 | Perforation | 1024.00 | 1025.00 | 13 |
1989-06-22 | Packing Device Capped w/Cement | 1037.00 | 1045.00 | 0 |
1989-06-22 | Packing Device Capped w/Cement | 1012.00 | 1020.00 | 0 |
1989-06-23 | Perforation | 883.50 | 885.00 | 13 |
2003-08-09 | Packing Device Capped w/Cement | 868.00 | 876.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 14 | 0.0 | 0.0 | 0.0 |
For data sources see[5]