If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454192410002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.896403,"lon":-112.624011,"icon":""}]} |
Location: 00/10-24-045-19W4/2 | |
Location Alias: 00/10-24-45-19 W4M | |
Location Alias 2: 00/10-24-045-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 19 | |
Section: 24 | |
County/Municipality: Camrose County | |
Well Name: PALOMA BRUCE 10-24-45-19 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0104985 | |
License Date: 1984-01-04 | |
License Status: RecCertified | |
Spud Date: 1984-01-17 | |
Final Drill Date: 1984-01-21 | |
Well Total Depth: 1175.00 m | |
Surface Hole Latitude: 52.896403 | |
Surface Hole Longitude: -112.624011 |
Date | Event |
---|---|
1984-01-04 | Obtained License |
1984-01-21 | Finished Drilling |
1984-01-21 | Well Log Performed |
1984-01-21 | Well Mode changed to Drilled and Cased |
1984-01-22 | Drill Stem Test Performed |
1984-01-23 | Production Casing Operation Performed |
1984-02-14 | Well Log Performed |
1984-02-15 | Well Log Performed |
1984-02-16 | Perforation Treatment Performed - Jet Perforation |
1993-01-20 | Perforation Treatment Performed - Cement Squeeze |
1993-01-21 | Well Log Performed |
1993-01-22 | Perforation Treatment Performed - Jet Perforation |
1993-07-09 | Well Log Performed |
1993-07-10 | Perforation Treatment Performed - Jet Perforation |
1993-08-18 | Well Began Production |
1993-08-18 | Well Fluid changed to Gas |
1993-08-18 | Well Mode changed to Flowing |
2000-03-01 | Well Fluid changed to Gas |
2000-03-01 | Well Mode changed to Suspended |
2004-05-11 | Well Log Performed |
2004-05-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-12 | Plug Back Performed |
2004-05-12 | Well Log Performed |
2004-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-05-13 | Perforation Treatment Performed - Cement Squeeze |
2004-05-13 | Plug Back Performed |
2004-05-13 | Well Fluid changed to Gas |
2004-05-13 | Well Log Performed |
2004-05-13 | Well Mode changed to Abandoned Zone |
2005-10-17 | Perforation Treatment Performed - Cement Plug |
2005-10-17 | Perforation Treatment Performed - Jet Perforation |
2005-10-17 | Perforation Treatment Performed - Remedial Casing |
2006-09-12 | Well Log Performed |
2006-09-13 | Perforation Treatment Performed - Jet Perforation |
2006-09-13 | Well Log Performed |
2006-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-14 | Perforation Treatment Performed - Jet Perforation |
2006-09-14 | Well Log Performed |
2006-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-24 | Perforation Treatment Performed - Remedial Casing |
2007-07-02 | Well Log Performed |
2007-09-02 | Perforation Treatment Performed - Jet Perforation |
2007-09-02 | Well Log Performed |
2007-09-03 | Perforation Treatment Performed - Remedial Casing |
2007-09-03 | Well Log Performed |
2007-09-04 | Perforation Treatment Performed - Jet Perforation |
2007-09-04 | Perforation Treatment Performed - Remedial Casing |
2008-07-08 | Perforation Treatment Performed - Jet Perforation |
2008-07-14 | Perforation Treatment Performed - Remedial Casing |
2008-07-15 | Well Log Performed |
2008-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-07-17 | Perforation Treatment Performed - Jet Perforation |
2008-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-07-18 | Perforation Treatment Performed - Remedial Casing |
2008-07-21 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2008-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-07-22 | Perforation Treatment Performed - Remedial Casing |
2008-07-23 | Perforation Treatment Performed - Jet Perforation |
2008-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-07-24 | Perforation Treatment Performed - Remedial Casing |
2008-07-24 | Well Log Performed |
2009-06-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2009-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-06-25 | Perforation Treatment Performed - Remedial Casing |
2012-07-09 | Well Abandoned |
2012-07-09 | Well Fluid changed to Gas |
2012-07-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-02-16 | Perforation | 1060.00 | 1060.50 | 7 |
2005-10-17 | Perforation | 321.00 | 324.00 | 13 |
2005-10-17 | Remedial Casing Cementing | 321.00 | 324.00 | 0 |
2005-10-17 | Cement Plug | 229.00 | 324.00 | 0 |
2006-09-13 | Perforation | 892.00 | 895.00 | 13 |
2006-09-13 | Perforation | 652.00 | 655.00 | 13 |
2006-09-14 | Packing Device Capped w/Cement | 879.00 | 887.00 | 0 |
2006-09-14 | Perforation | 399.00 | 402.00 | 13 |
2006-09-24 | Remedial Casing Cementing | 652.00 | 655.00 | 0 |
2006-09-24 | Packing Device Capped w/Cement | 630.00 | 645.00 | 0 |
2006-09-24 | Remedial Casing Cementing | 399.00 | 402.00 | 0 |
1984-02-16 | Perforation | 1061.00 | 1061.50 | 7 |
2006-09-24 | Packing Device Capped w/Cement | 363.00 | 393.40 | 0 |
2007-09-02 | Perforation | 522.00 | 523.00 | 13 |
2007-09-02 | Perforation | 454.00 | 455.00 | 13 |
2007-09-03 | Remedial Casing Cementing | 522.00 | 523.00 | 0 |
2007-09-03 | Remedial Casing Cementing | 454.00 | 455.00 | 0 |
2007-09-04 | Perforation | 332.00 | 335.00 | 13 |
2007-09-04 | Remedial Casing Cementing | 332.00 | 335.00 | 0 |
2008-07-08 | Perforation | 892.00 | 895.00 | 13 |
2008-07-14 | Remedial Casing Cementing | 892.00 | 895.00 | 0 |
2008-07-16 | Packing Device Capped w/Cement | 879.00 | 887.00 | 0 |
1984-02-16 | Perforation | 1062.50 | 1063.50 | 7 |
2008-07-17 | Perforation | 426.00 | 429.00 | 13 |
2008-07-18 | Remedial Casing Cementing | 426.00 | 429.00 | 0 |
2008-07-18 | Packing Device Capped w/Cement | 413.00 | 421.00 | 0 |
2008-07-21 | Hydra Jet Perforation | 383.00 | 387.00 | 1 |
2008-07-22 | Remedial Casing Cementing | 383.00 | 387.00 | 0 |
2008-07-22 | Packing Device Capped w/Cement | 371.00 | 379.00 | 0 |
2008-07-23 | Perforation | 275.00 | 278.00 | 17 |
2008-07-24 | Remedial Casing Cementing | 275.00 | 278.00 | 0 |
2008-07-24 | Packing Device Capped w/Cement | 262.00 | 270.00 | 0 |
2009-06-22 | Hydra Jet Perforation | 109.00 | 111.00 | 1 |
1993-01-20 | Cement Squeeze | 1060.00 | 1063.50 | 0 |
2009-06-25 | Remedial Casing Cementing | 109.00 | 111.00 | 0 |
2009-06-25 | Packing Device Capped w/Cement | 96.20 | 104.30 | 0 |
1993-01-22 | Perforation | 1061.50 | 1063.50 | 13 |
1993-07-10 | Perforation | 385.00 | 386.50 | 13 |
2004-05-12 | Packing Device Capped w/Cement | 1050.00 | 1058.00 | 0 |
2004-05-13 | Cement Squeeze | 385.00 | 386.50 | 0 |
2004-05-13 | Packing Device Capped w/Cement | 268.00 | 280.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 2858 | 0.0 | 0.0 | 0.0 |
1994 | 4144 | 0.0 | 0.0 | 0.0 |
For data sources see[5]