If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454192506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.905971,"lon":-112.633439,"icon":""}]} |
Location: 00/06-25-045-19W4/0 | |
Location Alias: 00/06-25-45-19 W4M | |
Location Alias 2: 00/06-25-045-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 19 | |
Section: 25 | |
County/Municipality: Camrose County | |
Well Name: SCEPTRE ET AL BRUCE 6-25-45-19 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0098820 | |
License Date: 1982-11-16 | |
License Status: Abandoned | |
Spud Date: 1982-11-28 | |
Final Drill Date: 1982-12-02 | |
Well Total Depth: 1175.00 m | |
Surface Hole Latitude: 52.905971 | |
Surface Hole Longitude: -112.633439 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-11-16 | Obtained License |
1982-12-02 | Drill Stem Test Performed |
1982-12-02 | Finished Drilling |
1982-12-03 | Drill Stem Test Performed |
1982-12-05 | Production Casing Operation Performed |
1983-06-17 | Well Mode changed to Drilled and Cased |
1983-12-06 | Well Log Performed |
1983-12-07 | Perforation Treatment Performed - Jet Perforation |
1983-12-30 | Well Began Production |
1983-12-30 | Well Fluid changed to Gas |
1983-12-30 | Well Mode changed to Flowing |
1991-09-03 | Perforation Treatment Performed - Cement Squeeze |
1991-09-06 | Perforation Treatment Performed - Jet Perforation |
1991-09-06 | Well Log Performed |
1991-09-10 | Perforation Treatment Performed - Jet Perforation |
1991-09-10 | Well Log Performed |
1993-11-01 | Well Fluid changed to Gas |
1993-11-01 | Well Mode changed to Suspended |
1997-02-01 | Well Log Performed |
1997-02-19 | Well Log Performed |
1997-04-06 | Perforation Treatment Performed - Jet Perforation |
1997-04-06 | Perforation Treatment Performed - Remedial Casing |
1997-04-06 | Well Log Performed |
1997-04-11 | Perforation Treatment Performed - Jet Perforation |
1997-04-11 | Well Log Performed |
1997-07-18 | Well Log Performed |
1998-02-20 | Perforation Treatment Performed - Jet Perforation |
1998-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-02-25 | Perforation Treatment Performed - Remedial Casing |
1998-02-27 | Perforation Treatment Performed - Jet Perforation |
1998-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-03-02 | Perforation Treatment Performed - Jet Perforation |
1998-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-03-04 | Perforation Treatment Performed - Jet Perforation |
1998-03-08 | Perforation Treatment Performed - Remedial Casing |
1998-03-28 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2010-07-08 | Perforation Treatment Performed - Jet Perforation |
2010-07-09 | Well Log Performed |
2010-07-11 | Perforation Treatment Performed - Jet Perforation |
2010-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-12 | Perforation Treatment Performed - Cement Plug |
2010-08-12 | Plug Back Performed |
2010-08-12 | Well Fluid changed to Gas |
2010-08-12 | Well Mode changed to Abandoned Zone |
2010-08-13 | Perforation Treatment Performed - Cement Plug |
2010-08-13 | Perforation Treatment Performed - Cement Squeeze |
2010-08-13 | Plug Back Performed |
2010-08-14 | Perforation Treatment Performed - Jet Perforation |
2010-08-14 | Well Log Performed |
2010-08-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-08-15 | Perforation Treatment Performed - Remedial Casing |
2012-09-13 | Well Log Performed |
2012-09-18 | Perforation Treatment Performed - Jet Perforation |
2012-09-18 | Well Log Performed |
2012-09-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-09-22 | Perforation Treatment Performed - Remedial Casing |
2013-07-10 | Well Log Performed |
2013-07-11 | Well Log Performed |
2013-08-29 | Perforation Treatment Performed - Jet Perforation |
2013-08-29 | Well Log Performed |
2013-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-08-30 | Perforation Treatment Performed - Remedial Casing |
2013-09-01 | Well Log Performed |
2013-09-04 | Perforation Treatment Performed - Jet Perforation |
2013-09-04 | Well Log Performed |
2013-09-05 | Perforation Treatment Performed - Cement Plug |
2013-09-05 | Perforation Treatment Performed - Remedial Casing |
2013-09-09 | Perforation Treatment Performed - Jet Perforation |
2013-09-09 | Well Log Performed |
2013-09-15 | Perforation Treatment Performed - Cement Plug |
2013-09-15 | Perforation Treatment Performed - Remedial Casing |
2014-09-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-12-07 | Perforation | 1059.00 | 1064.00 | 7 |
1998-02-21 | Acid Treatment | 600.00 | 601.00 | 0 |
1998-02-25 | Acid Treatment | 600.00 | 601.00 | 0 |
1998-02-25 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
1998-02-27 | Perforation | 510.00 | 511.00 | 13 |
1998-02-27 | Perforation | 497.00 | 498.00 | 13 |
1998-02-28 | Acid Treatment | 497.00 | 511.00 | 0 |
1998-03-02 | Perforation | 311.00 | 312.00 | 13 |
1998-03-03 | Acid Treatment | 311.00 | 312.00 | 0 |
1998-03-04 | Perforation | 311.50 | 312.50 | 13 |
1998-03-04 | Acid Treatment | 311.00 | 312.50 | 0 |
1991-09-03 | Cement Squeeze | 1059.00 | 1064.00 | 0 |
1998-03-08 | Remedial Casing Cementing | 311.00 | 312.50 | 0 |
1998-03-28 | Casing Patch | 510.00 | 511.00 | 0 |
2010-07-08 | Perforation | 600.00 | 601.00 | 13 |
2010-07-11 | Perforation | 510.00 | 511.00 | 13 |
2010-08-12 | Packing Device Capped w/Cement | 1038.00 | 1046.00 | 0 |
2010-08-12 | Cement Plug | 1030.00 | 1038.00 | 0 |
2010-08-13 | Cement Squeeze | 899.50 | 905.00 | 0 |
2010-08-13 | Cement Plug | 468.20 | 624.00 | 0 |
2010-08-14 | Perforation | 398.00 | 401.00 | 13 |
2010-08-15 | Remedial Casing Cementing | 398.00 | 401.00 | 0 |
1991-09-06 | Perforation | 1062.00 | 1065.00 | 13 |
2010-08-15 | Packing Device Capped w/Cement | 380.00 | 395.00 | 0 |
2012-09-18 | Perforation | 248.00 | 250.00 | 13 |
2012-09-20 | Acid Treatment | 248.00 | 250.00 | 0 |
2012-09-22 | Remedial Casing Cementing | 248.00 | 250.00 | 0 |
2013-08-29 | Perforation | 780.00 | 783.00 | 20 |
2013-08-30 | Remedial Casing Cementing | 780.00 | 783.00 | 0 |
2013-08-30 | Packing Device Capped w/Cement | 740.00 | 776.00 | 0 |
2013-09-04 | Perforation | 108.00 | 110.00 | 20 |
2013-09-05 | Remedial Casing Cementing | 108.00 | 110.00 | 0 |
2013-09-05 | Cement Plug | 74.50 | 740.00 | 0 |
1991-09-10 | Perforation | 1058.50 | 1059.50 | 13 |
2013-09-09 | Perforation | 43.00 | 45.00 | 20 |
2013-09-15 | Remedial Casing Cementing | 43.00 | 45.00 | 0 |
2013-09-15 | Cement Plug | 26.20 | 75.00 | 0 |
1997-04-06 | Perforation | 311.00 | 312.00 | 13 |
1997-04-06 | Remedial Casing Cementing | 311.00 | 312.00 | 0 |
1997-04-11 | Perforation | 903.00 | 905.00 | 13 |
1997-04-11 | Perforation | 899.50 | 901.50 | 13 |
1998-02-20 | Perforation | 600.00 | 601.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 41 | 0.0 | 0.0 | 0.0 |
1984 | 4478 | 0.0 | 0.0 | 0.0 |
1985 | 5933 | 0.0 | 0.0 | 0.0 |
1986 | 4476 | 0.0 | 0.0 | 0.0 |
1987 | 2864 | 0.0 | 0.0 | 0.0 |
1988 | 6685 | 0.0 | 0.0 | 0.0 |
1989 | 6025 | 0.0 | 0.0 | 0.0 |
1990 | 3539 | 0.0 | 0.0 | 0.0 |
1991 | 6453 | 0.0 | 0.0 | 0.0 |
1992 | 43 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-22 | No Incident Encountered | 0.00 | 0.00 |
2014-09-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]