If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454202210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.896204,"lon":-112.820746,"icon":""}]} |
Location: 00/10-22-045-20W4/0 | |
Location Alias: 00/10-22-45-20 W4M | |
Location Alias 2: 00/10-22-045-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 20 | |
Section: 22 | |
County/Municipality: Camrose County | |
Well Name: SCEPTRE DRIED 10-22-45-20 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0182072 | |
License Date: 1995-11-14 | |
License Status: RecCertified | |
Spud Date: 1995-11-15 | |
Final Drill Date: 1995-11-19 | |
Well Total Depth: 1295.00 m | |
Surface Hole Latitude: 52.896204 | |
Surface Hole Longitude: -112.820746 |
Date | Event |
---|---|
1995-11-14 | Obtained License |
1995-11-16 | Surface Casing Operation Performed |
1995-11-19 | Finished Drilling |
1995-11-19 | Well Log Performed |
1995-11-20 | Drill Stem Test Performed |
1995-11-21 | Production Casing Operation Performed |
1995-11-21 | Rig Released |
1995-11-21 | Well Mode changed to Drilled and Cased |
1995-11-29 | Well Log Performed |
1995-12-01 | Perforation Treatment Performed - Jet Perforation |
1996-01-11 | Well Log Performed |
1996-01-13 | Well Log Performed |
1996-02-12 | Well Log Performed |
1999-01-12 | Well Began Production |
1999-01-12 | Well Fluid changed to Gas |
1999-01-12 | Well Mode changed to Flowing |
1999-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-06 | Perforation Treatment Performed - Jet Perforation |
1999-12-06 | Plug Back Performed |
1999-12-06 | Well Fluid changed to Gas |
1999-12-06 | Well Log Performed |
1999-12-06 | Well Mode changed to Abandoned Zone |
1999-12-20 | Perforation Treatment Performed - Fractured |
2000-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-23 | Perforation Treatment Performed - Jet Perforation |
2000-09-23 | Plug Back Performed |
2000-09-23 | Well Log Performed |
2002-02-20 | Well Log Performed |
2002-02-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-21 | Plug Back Performed |
2002-02-21 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-12-01 | Perforation | 1153.00 | 1155.00 | 13 |
1995-12-01 | Perforation | 1156.00 | 1157.00 | 13 |
1999-12-06 | Packing Device Capped w/Cement | 1137.00 | 1145.00 | 0 |
1999-12-06 | Perforation | 497.00 | 499.00 | 14 |
1999-12-20 | Fracture | 497.00 | 499.00 | 0 |
2000-09-23 | Packing Device Capped w/Cement | 482.00 | 490.00 | 0 |
2000-09-23 | Perforation | 300.00 | 303.00 | 17 |
2000-09-23 | Perforation | 318.00 | 321.00 | 17 |
2002-02-21 | Packing Device Capped w/Cement | 284.00 | 292.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 912 | 0.0 | 0.0 | 0.0 |
For data sources see[5]