If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454211816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.883846,"lon":-113.032214,"icon":""}]} |
Location: 02/16-18-045-21W4/0 | |
Location Alias: 02/16-18-45-21 W4M | |
Location Alias 2: 02/16-18-045-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 21 | |
Section: 18 | |
County/Municipality: Camrose County | |
Well Name: CPC RESOURCES DUHAMEL 16-18-45-21 | |
Operator Name: Lynx Energy ULC | |
License Number: 0396002 | |
License Date: 2008-04-18 | |
License Status: Suspension | |
Spud Date: 2008-07-04 | |
Final Drill Date: 2008-07-06 | |
Well Total Depth: 589.00 m | |
Surface Hole Latitude: 52.883846 | |
Surface Hole Longitude: -113.032214 |
Date | Event |
---|---|
2008-04-18 | Obtained License |
2008-07-04 | Surface Casing Operation Performed |
2008-07-05 | Production Casing Operation Performed |
2008-07-06 | Finished Drilling |
2008-07-06 | Well Mode changed to Drilled and Cased |
2008-07-20 | Rig Released |
2008-09-08 | Perforation Treatment Performed - Jet Perforation |
2008-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-09-16 | Perforation Treatment Performed - Jet Perforation |
2008-09-16 | Plug Back Performed |
2008-09-16 | Well Mode changed to Abandoned Zone |
2008-09-19 | Well Began Production |
2008-09-19 | Well Fluid changed to Gas |
2008-09-19 | Well Mode changed to Flowing |
2009-12-01 | Well Fluid changed to Gas |
2009-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-09-08 | Perforation | 458.50 | 460.00 | 13 |
2008-09-08 | Perforation | 407.50 | 411.00 | 13 |
2008-09-16 | Packing Device Capped w/Cement | 446.00 | 454.00 | 0 |
2008-09-16 | Perforation | 345.30 | 348.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 2488 | 0.0 | 0.0 | 0.0 |
2009 | 2864 | 0.0 | 0.0 | 0.0 |
For data sources see[5]