If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454213203030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.919178,"lon":-113.01674,"icon":""}]} |
Location: 03/03-32-045-21W4/0 | |
Location Alias: 03/03-32-45-21 W4M | |
Location Alias 2: 03/03-32-045-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 21 | |
Section: 32 | |
County/Municipality: Camrose County | |
Well Name: CNRL DUHAMEL 3-32L-45-21 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0145201 | |
License Date: 1990-08-27 | |
License Status: Issued | |
Spud Date: 1990-09-15 | |
Final Drill Date: 1990-09-22 | |
Well Total Depth: 1480.00 m | |
Surface Hole Latitude: 52.919178 | |
Surface Hole Longitude: -113.016740 |
Date | Event |
---|---|
1990-08-27 | Obtained License |
1990-09-16 | Surface Casing Operation Performed |
1990-09-22 | Finished Drilling |
1990-09-22 | Well Log Performed |
1990-09-22 | Well Mode changed to Drilled and Cased |
1990-09-23 | Production Casing Operation Performed |
1990-09-24 | Rig Released |
1990-10-03 | Well Log Performed |
1990-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-10-04 | Perforation Treatment Performed - Jet Perforation |
1990-10-04 | Well Log Performed |
1990-10-09 | Perforation Treatment Performed - Jet Perforation |
1990-10-09 | Well Log Performed |
1990-10-11 | Well Log Performed |
1990-10-12 | Perforation Treatment Performed - Cement Squeeze |
1990-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-10-18 | Well Began Production |
1990-10-18 | Well Fluid changed to Crude Oil |
1990-10-18 | Well Mode changed to Pumping |
1991-09-20 | Well Log Performed |
1992-12-16 | Perforation Treatment Performed - Cement Squeeze |
1992-12-16 | Well Log Performed |
1992-12-18 | Perforation Treatment Performed - Jet Perforation |
1992-12-18 | Well Log Performed |
1992-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-24 | Perforation Treatment Performed - Jet Perforation |
1993-08-24 | Well Log Performed |
1993-08-25 | Perforation Treatment Performed - Jet Perforation |
1993-08-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-18 | Well Fluid changed to Crude Oil |
1994-08-18 | Well Log Performed |
1994-08-18 | Well Mode changed to Suspended |
1994-08-19 | Perforation Treatment Performed - Fractured |
1994-08-19 | Perforation Treatment Performed - Jet Perforation |
1994-08-19 | Well Log Performed |
1995-08-19 | Well Log Performed |
1996-01-08 | Well Log Performed |
1996-01-09 | Well Log Performed |
1996-01-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-01-10 | Perforation Treatment Performed - Jet Perforation |
1996-01-10 | Plug Back Performed |
1996-01-10 | Well Fluid changed to Crude Oil |
1996-01-10 | Well Mode changed to Abandoned Zone |
1996-10-02 | Well Log Performed |
1996-10-03 | Well Log Performed |
1999-02-27 | Perforation Treatment Performed - Jet Perforation |
1999-02-27 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-10-04 | Perforation | 1439.00 | 1441.50 | 16 |
1993-08-25 | Perforation | 1422.50 | 1429.50 | 13 |
1993-08-26 | Acid Treatment | 1422.50 | 1429.50 | 0 |
1994-08-18 | Packing Device Capped w/Cement | 1402.00 | 1410.00 | 0 |
1994-08-19 | Perforation | 1335.00 | 1338.00 | 13 |
1994-08-19 | Perforation | 1340.00 | 1341.50 | 13 |
1994-08-19 | Perforation | 1343.50 | 1348.00 | 13 |
1994-08-19 | Fracture | 1335.00 | 1348.00 | 0 |
1996-01-10 | Packing Device Capped w/Cement | 1320.00 | 1328.00 | 0 |
1996-01-10 | Perforation | 1302.00 | 1304.00 | 17 |
1999-02-27 | Perforation | 1297.00 | 1298.00 | 14 |
1990-10-04 | Acid Treatment | 1439.00 | 1441.50 | 0 |
1999-02-27 | Perforation | 1299.50 | 1301.00 | 14 |
1990-10-09 | Perforation | 1444.50 | 1447.50 | 16 |
1990-10-12 | Cement Squeeze | 1439.00 | 1441.50 | 0 |
1990-10-16 | Acid Treatment | 1444.50 | 1447.50 | 0 |
1992-12-16 | Cement Squeeze | 1444.50 | 1447.50 | 0 |
1992-12-18 | Perforation | 1439.00 | 1441.50 | 13 |
1992-12-21 | Acid Treatment | 1439.00 | 1441.50 | 0 |
1993-08-24 | Perforation | 1432.00 | 1435.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 840 | 0.0 | 0.0 | 0.0 |
1991 | 3936 | 0.0 | 0.0 | 0.0 |
1992 | 7367 | 0.0 | 0.0 | 0.0 |
1993 | 4630 | 0.0 | 0.0 | 0.0 |
1994 | 4991 | 0.0 | 0.0 | 0.0 |
For data sources see[5]