If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454220101022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.84568,"lon":-113.055591,"icon":""}]} |
Location: 02/01-01-045-22W4/2 | |
Location Alias: 02/01-01-45-22 W4M | |
Location Alias 2: 02/01-01-045-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 22 | |
Section: 01 | |
County/Municipality: Camrose County | |
Well Name: CNRL NEW NORWAY 1A-1-45-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0004353 | |
License Date: 1952-03-13 | |
License Status: Abandoned | |
Spud Date: 1952-03-16 | |
Final Drill Date: 1952-04-09 | |
Well Total Depth: 1420.40 m | |
Surface Hole Latitude: 52.845680 | |
Surface Hole Longitude: -113.055591 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-03-13 | Obtained License |
1952-03-30 | Drill Stem Test Performed |
1952-03-31 | Drill Stem Test Performed |
1952-04-01 | Drill Stem Test Performed |
1952-04-09 | Finished Drilling |
1952-04-09 | Well Mode changed to Drilled and Cased |
1952-04-11 | Perforation Treatment Performed - Bullet Perforation |
1952-04-11 | Production Casing Operation Performed |
1979-04-05 | Perforation Treatment Performed - Cement Squeeze |
1979-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-04-09 | Perforation Treatment Performed - Jet Perforation |
1987-12-02 | Perforation Treatment Performed - Jet Perforation |
1988-02-24 | Perforation Treatment Performed - Cement Squeeze |
1988-02-26 | Perforation Treatment Performed - Cement Squeeze |
1988-02-28 | Perforation Treatment Performed - Jet Perforation |
1988-02-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-09-05 | Plug Back Performed |
1989-09-05 | Well Log Performed |
1992-09-24 | Well Log Performed |
1992-09-28 | Perforation Treatment Performed - Jet Perforation |
1992-09-30 | Perforation Treatment Performed - Fractured |
1994-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-18 | Plug Back Performed |
1994-10-18 | Well Log Performed |
1994-10-19 | Perforation Treatment Performed - Jet Perforation |
1994-10-21 | Well Began Production |
1994-10-21 | Well Fluid changed to Crude Oil |
1994-10-21 | Well Mode changed to Flowing |
1994-11-29 | Well Fluid changed to Crude Oil |
1994-11-29 | Well Mode changed to Pumping |
1999-11-30 | Perforation Treatment Performed - Jet Perforation |
1999-11-30 | Well Log Performed |
2002-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-07-17 | Plug Back Performed |
2002-07-17 | Well Fluid changed to Crude Oil |
2002-07-17 | Well Mode changed to Abandoned Zone |
2003-09-29 | Perforation Treatment Performed - Jet Perforation |
2003-09-29 | Well Log Performed |
2003-09-30 | Perforation Treatment Performed - Cement Plug |
2003-09-30 | Perforation Treatment Performed - Remedial Casing |
2003-10-01 | Well Abandoned |
2003-10-01 | Well Fluid changed to Crude Oil |
2003-10-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-04-11 | Bullet Perforation | 1407.00 | 1408.80 | 13 |
1989-09-05 | Packing Device Capped w/Cement | 1388.00 | 1396.00 | 0 |
1992-09-28 | Perforation | 1376.00 | 1378.50 | 14 |
1992-09-30 | Fracture | 1376.00 | 1378.50 | 0 |
1994-10-18 | Packing Device Capped w/Cement | 1362.00 | 1370.00 | 0 |
1994-10-19 | Perforation | 1340.00 | 1342.50 | 17 |
1999-11-30 | Perforation | 1335.50 | 1336.50 | 14 |
2002-07-17 | Packing Device Capped w/Cement | 1319.00 | 1327.00 | 0 |
2003-09-29 | Perforation | 228.00 | 229.00 | 20 |
2003-09-30 | Remedial Casing Cementing | 228.00 | 229.00 | 0 |
2003-09-30 | Cement Plug | 85.00 | 229.00 | 0 |
1979-04-05 | Cement Squeeze | 1407.00 | 1408.80 | 0 |
1979-04-09 | Perforation | 1402.90 | 1404.40 | 13 |
1979-04-09 | Acid Treatment | 1402.90 | 1404.40 | 0 |
1987-12-02 | Perforation | 1399.50 | 1400.50 | 13 |
1988-02-24 | Cement Squeeze | 1402.90 | 1404.40 | 0 |
1988-02-26 | Cement Squeeze | 1399.50 | 1400.50 | 0 |
1988-02-28 | Perforation | 1397.80 | 1399.00 | 13 |
1988-02-29 | Acid Treatment | 1397.80 | 1399.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 1587 | 0.0 | 0.0 | 0.0 |
1995 | 8552 | 0.0 | 0.0 | 0.0 |
1996 | 8634 | 0.0 | 0.0 | 0.0 |
1997 | 8493 | 0.0 | 0.0 | 0.0 |
1998 | 8218 | 0.0 | 0.0 | 0.0 |
1999 | 672 | 0.0 | 0.0 | 0.0 |
2000 | 1656 | 0.0 | 0.0 | 0.0 |
2002 | 36 | 0.0 | 0.0 | 0.0 |
For data sources see[5]