If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0454220102002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.844929,"lon":-113.060208,"icon":""}]} |
| Location: 00/02-01-045-22W4/2 | |
| Location Alias: 00/02-01-45-22 W4M | |
| Location Alias 2: 00/02-01-045-22 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 01 | |
| County/Municipality: Camrose County | |
| Well Name: CNRL NEW NORWAY 2-1-45-22 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0003580 | |
| License Date: 1951-10-06 | |
| License Status: Abandoned | |
| Spud Date: 1951-10-15 | |
| Final Drill Date: 1951-11-28 | |
| Well Total Depth: 1491.70 m | |
| Surface Hole Latitude: 52.844929 | |
| Surface Hole Longitude: -113.060208 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1951-10-06 | Obtained License |
| 1951-11-08 | Drill Stem Test Performed |
| 1951-11-11 | Drill Stem Test Performed |
| 1951-11-17 | Liner Casing Operation Performed |
| 1951-11-22 | Drill Stem Test Performed |
| 1951-11-23 | Drill Stem Test Performed |
| 1951-11-24 | Drill Stem Test Performed |
| 1951-11-27 | Drill Stem Test Performed |
| 1951-11-28 | Drill Stem Test Performed |
| 1951-11-28 | Finished Drilling |
| 1951-11-28 | Well Mode changed to Drilled and Cased |
| 1951-11-30 | Perforation Treatment Performed - Jet Perforation |
| 1960-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-06-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1960-06-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-06-12 | Perforation Treatment Performed - Cement Squeeze |
| 1960-06-15 | Perforation Treatment Performed - Jet Perforation |
| 1961-05-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1961-05-09 | Perforation Treatment Performed - Cement Squeeze |
| 1961-05-13 | Perforation Treatment Performed - Cement Squeeze |
| 1961-05-16 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1961-05-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1962-05-08 | Perforation Treatment Performed - Cement Squeeze |
| 1962-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-05-11 | Perforation Treatment Performed - Cement Squeeze |
| 1962-05-16 | Perforation Treatment Performed - Open-Hole Completion |
| 1962-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-08-13 | Perforation Treatment Performed - Cement Squeeze |
| 1962-08-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1962-08-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1962-08-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1970-09-25 | Perforation Treatment Performed - Cement Plug |
| 1976-06-01 | Well Fluid changed to Crude Oil |
| 1976-06-01 | Well Mode changed to Potential |
| 1976-06-04 | Perforation Treatment Performed - Jet Perforation |
| 1976-08-01 | Well Began Production |
| 1976-08-01 | Well Fluid changed to Crude Oil |
| 1976-08-01 | Well Mode changed to Flowing |
| 1986-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-01-18 | Well Fluid changed to Crude Oil |
| 1988-01-18 | Well Mode changed to Pumping |
| 1988-01-20 | Perforation Treatment Performed - Jet Perforation |
| 1988-10-10 | Perforation Treatment Performed - Jet Perforation |
| 1992-03-29 | Well Log Performed |
| 1994-11-02 | Well Log Performed |
| 1994-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-11-04 | Plug Back Performed |
| 1994-11-04 | Well Fluid changed to Crude Oil |
| 1994-11-04 | Well Log Performed |
| 1994-11-04 | Well Mode changed to Abandoned Zone |
| 1994-11-05 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-16 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-16 | Well Log Performed |
| 2002-06-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-06-21 | Plug Back Performed |
| 2002-06-21 | Well Log Performed |
| 2003-09-29 | Perforation Treatment Performed - Jet Perforation |
| 2003-09-30 | Perforation Treatment Performed - Cement Plug |
| 2003-09-30 | Perforation Treatment Performed - Remedial Casing |
| 2003-10-01 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1951-11-30 | Perforation | 1487.10 | 1489.60 | 13 |
| 1961-05-16 | Hydra Jet Perforation | 1487.40 | 1487.70 | 0 |
| 1961-05-19 | Acid Wash | 1487.40 | 1487.70 | 0 |
| 1962-05-08 | Cement Squeeze | 1487.40 | 1487.70 | 0 |
| 1962-05-11 | Acid Treatment | 1487.40 | 1487.70 | 0 |
| 1962-05-11 | Cement Squeeze | 1487.40 | 1487.70 | 0 |
| 1962-05-16 | Open Hole/Barefoot Completion | 1489.90 | 1491.70 | 0 |
| 1962-08-13 | Acid Treatment | 1489.90 | 1491.70 | 0 |
| 1962-08-13 | Cement Squeeze | 1489.90 | 1491.70 | 0 |
| 1962-08-15 | Hydra Jet Perforation | 1488.00 | 1488.90 | 0 |
| 1962-08-18 | Hydra Jet Perforation | 1488.30 | 1488.30 | 0 |
| 1960-06-10 | Acid Treatment | 1487.10 | 1489.60 | 0 |
| 1962-08-21 | Acid Wash | 1488.00 | 1488.90 | 0 |
| 1970-09-25 | Cement Plug | 1402.10 | 1488.90 | 0 |
| 1976-06-04 | Perforation | 1403.00 | 1405.10 | 7 |
| 1986-05-12 | Acid Treatment | 1403.00 | 1405.00 | 0 |
| 1988-01-20 | Perforation | 1398.00 | 1399.50 | 13 |
| 1988-10-10 | Perforation | 1391.10 | 1392.30 | 13 |
| 1994-11-04 | Packing Device Capped w/Cement | 1376.00 | 1384.00 | 0 |
| 1994-11-05 | Perforation | 1343.00 | 1345.00 | 17 |
| 1996-02-16 | Perforation | 1343.00 | 1347.00 | 17 |
| 2002-06-21 | Packing Device Capped w/Cement | 1327.00 | 1335.00 | 0 |
| 1960-06-11 | Acid Wash | 1487.10 | 1489.60 | 0 |
| 2003-09-29 | Perforation | 230.00 | 231.00 | 20 |
| 2003-09-30 | Remedial Casing Cementing | 230.00 | 231.00 | 0 |
| 2003-09-30 | Cement Plug | 48.00 | 231.00 | 0 |
| 1960-06-12 | Acid Treatment | 1487.10 | 1489.60 | 0 |
| 1960-06-12 | Cement Squeeze | 1487.10 | 1489.60 | 0 |
| 1960-06-15 | Perforation | 1485.90 | 1486.80 | 13 |
| 1961-05-09 | Acid Wash | 1485.90 | 1486.80 | 0 |
| 1961-05-09 | Cement Squeeze | 1485.90 | 1486.80 | 0 |
| 1961-05-13 | Cement Squeeze | 1485.90 | 1486.80 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1976 | 1666 | 0.0 | 0.0 | 0.0 |
| 1977 | 2642 | 0.0 | 0.0 | 0.0 |
| 1978 | 2900 | 0.0 | 0.0 | 0.0 |
| 1979 | 3378 | 0.0 | 0.0 | 0.0 |
| 1980 | 3771 | 0.0 | 0.0 | 0.0 |
| 1981 | 4535 | 0.0 | 0.0 | 0.0 |
| 1982 | 7538 | 0.0 | 0.0 | 0.0 |
| 1983 | 8186 | 0.0 | 0.0 | 0.0 |
| 1984 | 8329 | 0.0 | 0.0 | 0.0 |
| 1985 | 8128 | 0.0 | 0.0 | 0.0 |
| 1986 | 8272 | 0.0 | 0.0 | 0.0 |
| 1987 | 8601 | 0.0 | 0.0 | 0.0 |
| 1988 | 8362 | 0.0 | 0.0 | 0.0 |
| 1989 | 8468 | 0.0 | 0.0 | 0.0 |
| 1990 | 8243 | 0.0 | 0.0 | 0.0 |
| 1991 | 8380 | 0.0 | 0.0 | 0.0 |
| 1992 | 8396 | 0.0 | 0.0 | 0.0 |
| 1993 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]