If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454220102020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.845272,"lon":-113.060887,"icon":""}]} |
Location: 02/02-01-045-22W4/0 | |
Location Alias: 02/02-01-45-22 W4M | |
Location Alias 2: 02/02-01-045-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 22 | |
Section: 01 | |
County/Municipality: Camrose County | |
Well Name: CNRL ET AL MALMO 2A-1-45-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0004051 | |
License Date: 1952-01-07 | |
License Status: Abandoned | |
Spud Date: 1952-01-19 | |
Final Drill Date: 1952-02-21 | |
Well Total Depth: 1489.60 m | |
Surface Hole Latitude: 52.845272 | |
Surface Hole Longitude: -113.060887 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-01-07 | Obtained License |
1952-02-11 | Drill Stem Test Performed |
1952-02-21 | Drill Stem Test Performed |
1952-02-21 | Finished Drilling |
1952-02-21 | Production Casing Operation Performed |
1952-02-21 | Well Mode changed to Drilled and Cased |
1952-02-25 | Perforation Treatment Performed - Bullet Perforation |
1952-02-26 | Perforation Treatment Performed - Cement Squeeze |
1952-02-29 | Perforation Treatment Performed - Bullet Perforation |
1952-03-01 | Perforation Treatment Performed - Cement Squeeze |
1952-03-03 | Drill Stem Test Performed |
1952-03-04 | Perforation Treatment Performed - Bullet Perforation |
1952-03-05 | Perforation Treatment Performed - Cement Squeeze |
1952-03-08 | Perforation Treatment Performed - Bullet Perforation |
1952-03-09 | Well Began Production |
1952-03-09 | Well Fluid changed to Crude Oil |
1952-03-09 | Well Mode changed to Flowing |
1966-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-01-21 | Perforation Treatment Performed - Cement Squeeze |
1966-01-21 | Well Fluid changed to Crude Oil |
1966-01-21 | Well Mode changed to Abandoned and Re-entered |
1986-05-05 | Well Log Performed |
2012-08-17 | Well Log Performed |
2013-12-12 | Perforation Treatment Performed - Cement Plug |
2013-12-12 | Perforation Treatment Performed - Jet Perforation |
2013-12-12 | Perforation Treatment Performed - Remedial Casing |
2013-12-12 | Well Log Performed |
2013-12-13 | Perforation Treatment Performed - Jet Perforation |
2013-12-13 | Well Log Performed |
2013-12-15 | Perforation Treatment Performed - Cement Plug |
2013-12-15 | Perforation Treatment Performed - Remedial Casing |
2013-12-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-25 | Bullet Perforation | 1285.60 | 1286.30 | 13 |
2013-12-12 | Perforation | 941.00 | 942.00 | 17 |
2013-12-12 | Remedial Casing Cementing | 941.00 | 942.00 | 0 |
2013-12-12 | Cement Plug | 840.00 | 960.00 | 0 |
2013-12-13 | Perforation | 359.00 | 360.00 | 17 |
2013-12-13 | Perforation | 325.00 | 326.00 | 17 |
2013-12-15 | Remedial Casing Cementing | 325.00 | 360.00 | 0 |
2013-12-15 | Cement Plug | 270.00 | 390.00 | 0 |
1952-02-26 | Cement Squeeze | 1285.60 | 1286.30 | 0 |
1952-02-29 | Bullet Perforation | 1284.40 | 1285.00 | 13 |
1952-03-01 | Cement Squeeze | 1284.40 | 1285.00 | 0 |
1952-03-04 | Bullet Perforation | 1285.00 | 1286.00 | 0 |
1952-03-05 | Cement Squeeze | 1285.00 | 1286.00 | 0 |
1952-03-08 | Bullet Perforation | 1406.70 | 1409.70 | 13 |
1966-01-21 | Acid Treatment | 1406.70 | 1409.70 | 0 |
1966-01-21 | Cement Squeeze | 1407.00 | 1409.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-12-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]