If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454220108003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.848338,"lon":-113.055818,"icon":""}]} |
Location: 00/08-01-045-22W4/3 | |
Location Alias: 00/08-01-45-22 W4M | |
Location Alias 2: 00/08-01-045-22 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 22 | |
Section: 01 | |
County/Municipality: Camrose County | |
Well Name: CNRL NEW NORWAY 8-1MU-45-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0004237 | |
License Date: 1952-02-18 | |
License Status: Suspension | |
Spud Date: 1952-03-21 | |
Final Drill Date: 1952-04-13 | |
Well Total Depth: 1490.20 m | |
Surface Hole Latitude: 52.848338 | |
Surface Hole Longitude: -113.055818 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-02-18 | Obtained License |
1952-04-05 | Drill Stem Test Performed |
1952-04-13 | Finished Drilling |
1952-04-14 | Production Casing Operation Performed |
1952-04-17 | Perforation Treatment Performed - Open-Hole Completion |
1952-04-19 | Perforation Treatment Performed - Jet Perforation |
1976-03-15 | Perforation Treatment Performed - Cement Squeeze |
1976-09-04 | Perforation Treatment Performed - Cement Squeeze |
1976-09-07 | Perforation Treatment Performed - Jet Perforation |
1976-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-07-21 | Perforation Treatment Performed - Jet Perforation |
1988-02-06 | Perforation Treatment Performed - Cement Squeeze |
1988-02-10 | Perforation Treatment Performed - Jet Perforation |
1988-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-12 | Well Log Performed |
1992-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-13 | Perforation Treatment Performed - Cement Squeeze |
1992-06-15 | Well Log Performed |
1992-06-16 | Perforation Treatment Performed - Jet Perforation |
1992-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-05 | Well Log Performed |
1992-09-06 | Perforation Treatment Performed - Jet Perforation |
1992-09-06 | Well Log Performed |
1992-09-06 | Well Mode changed to Drilled and Cased |
1992-09-14 | Well Began Production |
1992-09-14 | Well Fluid changed to Crude Oil |
1992-09-14 | Well Mode changed to Flowing |
1995-01-11 | Well Fluid changed to Crude Oil |
1995-01-11 | Well Mode changed to Pumping |
1999-12-18 | Perforation Treatment Performed - Jet Perforation |
1999-12-23 | Well Fluid changed to Crude Oil |
1999-12-23 | Well Mode changed to Flowing |
2005-05-01 | Well Fluid changed to Crude Oil |
2005-05-01 | Well Mode changed to Suspended |
2008-01-01 | Well Fluid changed to Crude Oil |
2008-01-01 | Well Mode changed to Flowing |
2009-06-30 | Well Fluid changed to Crude Oil |
2009-06-30 | Well Mode changed to Suspended |
2016-08-18 | Well Fluid changed to Crude Oil |
2016-08-18 | Well Mode changed to Pumping |
2018-03-31 | Well Fluid changed to Crude Oil |
2018-03-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-04-17 | Open Hole/Barefoot Completion | 1487.40 | 1490.20 | 0 |
1988-02-10 | Perforation | 1396.50 | 1397.50 | 14 |
1988-06-08 | Acid Treatment | 1396.50 | 1397.50 | 0 |
1992-06-13 | Acid Treatment | 1396.50 | 1397.50 | 0 |
1992-06-13 | Cement Squeeze | 1396.50 | 1397.50 | 0 |
1992-06-16 | Perforation | 1394.40 | 1395.70 | 10 |
1992-06-17 | Acid Treatment | 1394.40 | 1395.70 | 0 |
1992-09-05 | Packing Device Capped w/Cement | 1384.00 | 1392.00 | 0 |
1992-09-06 | Perforation | 1335.00 | 1337.00 | 13 |
1999-12-18 | Perforation | 1329.00 | 1331.00 | 14 |
1952-04-19 | Perforation | 1408.20 | 1411.20 | 13 |
1976-03-15 | Cement Squeeze | 1487.40 | 1490.20 | 0 |
1976-09-04 | Cement Squeeze | 1408.20 | 1411.20 | 0 |
1976-09-07 | Perforation | 1402.70 | 1404.80 | 7 |
1976-09-08 | Acid Treatment | 1402.70 | 1404.80 | 0 |
1983-07-21 | Perforation | 1399.00 | 1400.20 | 13 |
1983-07-21 | Acid Treatment | 1399.00 | 1400.20 | 0 |
1988-02-06 | Cement Squeeze | 1399.00 | 1400.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 2639 | 0.0 | 0.0 | 0.0 |
1993 | 6260 | 0.0 | 0.0 | 0.0 |
1994 | 7069 | 0.0 | 0.0 | 0.0 |
1995 | 8401 | 0.0 | 0.0 | 0.0 |
1996 | 8618 | 0.0 | 0.0 | 0.0 |
1997 | 8526 | 0.0 | 0.0 | 0.0 |
1998 | 2279 | 0.0 | 0.0 | 0.0 |
1999 | 224 | 0.0 | 0.0 | 0.0 |
2000 | 8371 | 0.0 | 0.0 | 0.0 |
2001 | 8591 | 0.0 | 0.0 | 0.0 |
2002 | 8449 | 0.0 | 0.0 | 0.0 |
2003 | 5463 | 0.0 | 0.0 | 0.0 |
2008 | 4632 | 0.0 | 0.0 | 0.0 |
2016 | 1080 | 0.0 | 0.0 | 0.0 |
2017 | 3360 | 0.0 | 0.0 | 0.0 |
For data sources see[5]