If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454221514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.886572,"lon":-113.118098,"icon":""}]} |
Location: 00/14-15-045-22W4/0 | |
Location Alias: 00/14-15-45-22 W4M | |
Location Alias 2: 00/14-15-045-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 22 | |
Section: 15 | |
County/Municipality: Camrose County | |
Well Name: CPC RESOURCES NEWNOR 14-15-45-22 | |
Operator Name: Lynx Energy ULC | |
License Number: 0394405 | |
License Date: 2008-02-20 | |
License Status: Amended | |
Spud Date: 2008-03-01 | |
Final Drill Date: 2008-03-02 | |
Well Total Depth: 623.00 m | |
Surface Hole Latitude: 52.886572 | |
Surface Hole Longitude: -113.118098 |
Date | Event |
---|---|
2008-02-20 | Obtained License |
2008-03-01 | Surface Casing Operation Performed |
2008-03-02 | Finished Drilling |
2008-03-02 | Production Casing Operation Performed |
2008-03-02 | Rig Released |
2008-03-02 | Well Log Performed |
2008-03-02 | Well Mode changed to Drilled and Cased |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-13 | Perforation Treatment Performed - Fractured |
2009-02-14 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-02-14 | Well Mode changed to Testing |
2009-03-20 | Well Began Production |
2009-03-20 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-03-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-06 | Perforation | 266.60 | 267.60 | 7 |
2009-02-06 | Perforation | 272.70 | 273.70 | 7 |
2009-02-06 | Perforation | 275.60 | 277.10 | 7 |
2009-02-06 | Perforation | 280.50 | 282.00 | 7 |
2009-02-06 | Perforation | 283.00 | 284.00 | 7 |
2009-02-06 | Perforation | 288.30 | 289.30 | 7 |
2009-02-13 | Fracture | 266.60 | 289.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 6983 | 0.0 | 0.0 | 0.0 |
2010 | 8752 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8775 | 0.0 | 0.0 | 0.0 |
2013 | 8750 | 0.0 | 0.0 | 0.0 |
2014 | 8732 | 0.0 | 0.0 | 0.0 |
2015 | 8750 | 0.0 | 0.0 | 0.0 |
2016 | 8733 | 0.0 | 0.0 | 0.0 |
2017 | 8737 | 0.0 | 0.0 | 0.0 |
2018 | 8635 | 0.0 | 0.0 | 0.0 |
2019 | 8726 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]