If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0454262311002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.897039,"lon":-113.674157,"icon":""}]} |
| Location: 00/11-23-045-26W4/2 | |
| Location Alias: 00/11-23-45-26 W4M | |
| Location Alias 2: 00/11-23-045-26 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 23 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: EMERALD BAY FBANK 11-23-45-26 | |
| Operator Name: Emerald Bay Energy Inc. | |
| License Number: 0078343 | |
| License Date: 1979-09-28 | |
| License Status: RecCertified | |
| Spud Date: 1979-10-12 | |
| Final Drill Date: 1979-10-26 | |
| Well Total Depth: 1600.00 m | |
| Surface Hole Latitude: 52.897039 | |
| Surface Hole Longitude: -113.674157 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-09-28 | Obtained License |
| 1979-10-23 | Drill Stem Test Performed |
| 1979-10-26 | Finished Drilling |
| 1979-10-26 | Well Log Performed |
| 1979-10-26 | Well Mode changed to Drilled and Cased |
| 1979-10-29 | Drill Stem Test Performed |
| 1979-11-05 | Drill Stem Test Performed |
| 1979-11-07 | Drill Stem Test Performed |
| 1979-11-09 | Production Casing Operation Performed |
| 1979-12-06 | Perforation Treatment Performed - Jet Perforation |
| 1979-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-12-10 | Perforation Treatment Performed - Fractured |
| 1980-01-26 | Perforation Treatment Performed - Jet Perforation |
| 1980-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-02-03 | Perforation Treatment Performed - Jet Perforation |
| 1980-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-02-14 | Well Began Production |
| 1980-02-14 | Well Fluid changed to Gas |
| 1980-02-14 | Well Mode changed to Flowing |
| 1980-07-31 | Well Fluid changed to Gas |
| 1980-07-31 | Well Mode changed to Suspended |
| 2008-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-11-03 | Plug Back Performed |
| 2008-11-04 | Perforation Treatment Performed - Jet Perforation |
| 2008-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-11-05 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2008-11-05 | Plug Back Performed |
| 2008-11-13 | Perforation Treatment Performed - Jet Perforation |
| 2008-11-14 | Perforation Treatment Performed - Jet Perforation |
| 2008-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-11-16 | Plug Back Performed |
| 2008-11-16 | Well Fluid changed to Gas |
| 2008-11-16 | Well Mode changed to Abandoned Zone |
| 2008-11-17 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2008-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2015-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-08-26 | Plug Back Performed |
| 2015-08-26 | Well Log Performed |
| 2015-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-08-27 | Plug Back Performed |
| 2015-08-27 | Well Log Performed |
| 2015-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2015-08-28 | Plug Back Performed |
| 2015-08-28 | Well Log Performed |
| 2015-08-29 | Perforation Treatment Performed - Jet Perforation |
| 2015-08-29 | Well Log Performed |
| 2015-08-30 | Perforation Treatment Performed - Cement Squeeze |
| 2015-08-30 | Plug Back Performed |
| 2015-10-27 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-12-06 | Perforation | 1465.50 | 1467.00 | 3 |
| 1980-02-03 | Perforation | 1529.50 | 1531.50 | 7 |
| 1980-02-06 | Acid Treatment | 1527.50 | 1581.50 | 0 |
| 2008-11-03 | Packing Device Capped w/Cement | 1561.80 | 1570.30 | 0 |
| 2008-11-04 | Perforation | 1538.00 | 1539.90 | 17 |
| 2008-11-05 | Bridge Plug, No Cement | 1535.80 | 1536.30 | 0 |
| 2008-11-05 | Packing Device Capped w/Cement | 1511.80 | 1520.30 | 0 |
| 2008-11-13 | Perforation | 1529.50 | 1531.50 | 17 |
| 2008-11-13 | Perforation | 1527.50 | 1528.50 | 17 |
| 2008-11-13 | Perforation | 1523.30 | 1526.30 | 17 |
| 2008-11-14 | Perforation | 1523.30 | 1526.30 | 17 |
| 1979-12-06 | Perforation | 1473.00 | 1475.00 | 3 |
| 2008-11-16 | Packing Device Capped w/Cement | 1509.00 | 1517.00 | 0 |
| 2008-11-17 | Bridge Plug, No Cement | 1459.80 | 1560.30 | 0 |
| 2008-11-18 | Perforation | 1368.50 | 1370.50 | 17 |
| 2008-11-18 | Perforation | 1318.00 | 1323.00 | 17 |
| 2015-08-26 | Packing Device Capped w/Cement | 1452.00 | 1460.00 | 0 |
| 2015-08-27 | Packing Device Capped w/Cement | 1352.00 | 1360.00 | 0 |
| 2015-08-27 | Packing Device Capped w/Cement | 1302.00 | 1310.00 | 0 |
| 2015-08-28 | Perforation | 769.00 | 771.00 | 13 |
| 2015-08-28 | Packing Device Capped w/Cement | 755.00 | 763.00 | 0 |
| 2015-08-28 | Perforation | 550.00 | 552.00 | 13 |
| 1979-12-06 | Perforation | 1479.80 | 1480.80 | 3 |
| 2015-08-28 | Packing Device Capped w/Cement | 534.00 | 542.00 | 0 |
| 2015-08-28 | Perforation | 474.00 | 476.00 | 13 |
| 2015-08-29 | Perforation | 438.00 | 440.00 | 13 |
| 2015-08-30 | Cement Squeeze | 474.00 | 476.00 | 0 |
| 2015-08-30 | Cement Squeeze | 438.00 | 440.00 | 0 |
| 1979-12-06 | Perforation | 1486.00 | 1487.50 | 3 |
| 1979-12-07 | Acid Treatment | 1465.50 | 1487.50 | 0 |
| 1979-12-10 | Fracture | 1465.50 | 1487.50 | 0 |
| 1980-01-26 | Perforation | 1579.50 | 1581.50 | 7 |
| 1980-02-01 | Acid Treatment | 1579.50 | 1581.50 | 0 |
| 1980-02-03 | Perforation | 1527.50 | 1528.50 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 2862 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]