If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0454283509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.925712,"lon":-113.947697,"icon":""}]} |
Location: 00/09-35-045-28W4/0 | |
Location Alias: 00/09-35-45-28 W4M | |
Location Alias 2: 00/09-35-045-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 4 | |
Range: 28 | |
Section: 35 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: FORGE WROSE 9-35-45-28 | |
Operator Name: Forge Oil & Gas Limited | |
License Number: 0400365 | |
License Date: 2008-09-02 | |
License Status: Issued | |
Spud Date: 2008-09-10 | |
Final Drill Date: 2008-09-11 | |
Well Total Depth: 699.00 m | |
Surface Hole Latitude: 52.925712 | |
Surface Hole Longitude: -113.947697 |
Date | Event |
---|---|
2008-09-02 | Obtained License |
2008-09-10 | Surface Casing Operation Performed |
2008-09-11 | Finished Drilling |
2008-09-11 | Production Casing Operation Performed |
2008-09-11 | Rig Released |
2008-09-11 | Well Mode changed to Drilled and Cased |
2008-09-21 | Well Log Performed |
2008-09-27 | Perforation Treatment Performed - Jet Perforation |
2008-10-02 | Perforation Treatment Performed - Fractured |
2008-10-16 | Well Log Performed |
2008-12-07 | Well Began Production |
2008-12-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2008-12-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-09-27 | Perforation | 580.70 | 582.00 | 7 |
2008-09-27 | Perforation | 527.70 | 529.00 | 7 |
2008-09-27 | Perforation | 525.20 | 526.60 | 7 |
2008-09-27 | Perforation | 522.50 | 523.30 | 13 |
2008-09-27 | Perforation | 519.30 | 520.10 | 13 |
2008-09-27 | Perforation | 491.80 | 492.70 | 13 |
2008-09-27 | Perforation | 469.90 | 470.70 | 13 |
2008-09-27 | Perforation | 464.30 | 465.00 | 13 |
2008-09-27 | Perforation | 458.80 | 459.40 | 13 |
2008-09-27 | Perforation | 436.60 | 437.70 | 7 |
2008-09-27 | Perforation | 399.00 | 400.00 | 7 |
2008-09-27 | Perforation | 578.00 | 579.20 | 7 |
2008-09-27 | Perforation | 387.00 | 387.70 | 13 |
2008-09-27 | Perforation | 382.60 | 383.50 | 13 |
2008-09-27 | Perforation | 375.30 | 375.80 | 13 |
2008-09-27 | Perforation | 370.70 | 371.50 | 13 |
2008-09-27 | Perforation | 344.50 | 345.20 | 13 |
2008-09-27 | Perforation | 336.90 | 337.60 | 13 |
2008-09-27 | Perforation | 321.00 | 321.60 | 13 |
2008-10-02 | Fracture | 580.70 | 582.00 | 0 |
2008-10-02 | Fracture | 578.00 | 579.20 | 0 |
2008-10-02 | Fracture | 564.40 | 565.10 | 0 |
2008-09-27 | Perforation | 564.40 | 565.10 | 13 |
2008-10-02 | Fracture | 561.90 | 563.00 | 0 |
2008-10-02 | Fracture | 560.20 | 561.10 | 0 |
2008-10-02 | Fracture | 557.20 | 557.80 | 0 |
2008-10-02 | Fracture | 550.90 | 552.00 | 0 |
2008-10-02 | Fracture | 536.50 | 537.30 | 0 |
2008-10-02 | Fracture | 531.90 | 532.50 | 0 |
2008-10-02 | Fracture | 527.70 | 529.00 | 0 |
2008-10-02 | Fracture | 525.20 | 526.60 | 0 |
2008-10-02 | Fracture | 522.50 | 523.30 | 0 |
2008-10-02 | Fracture | 519.30 | 520.10 | 0 |
2008-09-27 | Perforation | 561.90 | 563.00 | 7 |
2008-10-02 | Fracture | 491.80 | 492.70 | 0 |
2008-10-02 | Fracture | 469.90 | 470.70 | 0 |
2008-10-02 | Fracture | 464.30 | 465.00 | 0 |
2008-10-02 | Fracture | 458.80 | 459.40 | 0 |
2008-10-02 | Fracture | 436.60 | 437.70 | 0 |
2008-10-02 | Fracture | 399.00 | 400.00 | 0 |
2008-10-02 | Fracture | 387.00 | 387.70 | 0 |
2008-10-02 | Fracture | 382.60 | 383.50 | 0 |
2008-10-02 | Fracture | 375.30 | 375.80 | 0 |
2008-10-02 | Fracture | 370.70 | 371.50 | 0 |
2008-09-27 | Perforation | 560.20 | 561.10 | 13 |
2008-10-02 | Fracture | 344.50 | 345.20 | 0 |
2008-10-02 | Fracture | 336.90 | 337.60 | 0 |
2008-10-02 | Fracture | 321.00 | 321.60 | 0 |
2008-09-27 | Perforation | 557.20 | 557.80 | 13 |
2008-09-27 | Perforation | 550.90 | 552.00 | 7 |
2008-09-27 | Perforation | 536.50 | 537.30 | 13 |
2008-09-27 | Perforation | 531.90 | 532.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 491 | 0.0 | 0.0 | 0.0 |
2009 | 8496 | 0.0 | 0.0 | 0.0 |
2010 | 8335 | 0.0 | 0.0 | 0.0 |
2011 | 8395 | 0.0 | 0.0 | 0.0 |
2012 | 7960 | 0.0 | 0.0 | 0.0 |
2013 | 7141 | 0.0 | 0.0 | 0.0 |
2014 | 5784 | 0.0 | 0.0 | 0.0 |
2015 | 6793 | 0.0 | 0.0 | 0.0 |
2016 | 7626 | 0.0 | 0.0 | 0.0 |
2017 | 7078 | 0.0 | 0.0 | 0.0 |
2018 | 3559 | 0.0 | 0.0 | 0.0 |
2019 | 2643 | 0.0 | 0.0 | 0.0 |
2020 | 1727 | 0.0 | 0.0 | 0.0 |
For data sources see[5]