X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455040208000

Well Details

Well ID: 0455040208000
Loading map...
Location: 00/08-02-045-04W5/0
Location Alias: 00/08-02-45-04 W5M
Location Alias 2: 00/08-02-045-04 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 04
Section: 02
County/Municipality: Ponoka County
Well Name: NAL WROSES 8-2-45-4
Operator Name: NAL Resources Limited
License Number: 0079183
License Date: 1979-11-12
License Status: Suspension
Spud Date: 1979-12-28
Final Drill Date: 1980-01-18
Well Total Depth: 2135.00 m
Surface Hole Latitude: 52.850540
Surface Hole Longitude: -114.466531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-12 Obtained License
1980-01-14 Drill Stem Test Performed
1980-01-18 Finished Drilling
1980-01-18 Well Log Performed
1980-01-20 Drill Stem Test Performed
1980-01-21 Drill Stem Test Performed
1980-01-22 Drill Stem Test Performed
1980-01-23 Drill Stem Test Performed
1980-01-24 Drill Stem Test Performed
1980-01-26 Production Casing Operation Performed
1980-01-27 Well Mode changed to Drilled and Cased
1980-02-03 Perforation Treatment Performed - Jet Perforation
1980-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-07 Perforation Treatment Performed - Jet Perforation
1980-02-08 Perforation Treatment Performed - Fractured
1980-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-10 Perforation Treatment Performed - Jet Perforation
1980-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-12 Perforation Treatment Performed - Jet Perforation
1980-02-13 Perforation Treatment Performed - Fractured
1980-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-21 Perforation Treatment Performed - Jet Perforation
1980-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-04 Well Began Production
2000-11-04 Well Fluid changed to Gas
2000-11-04 Well Mode changed to Flowing
2010-01-01 Well Fluid changed to Gas
2010-01-01 Well Mode changed to Pumping
2013-01-18 Well Fluid changed to Gas
2013-01-18 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-03 Perforation 2073.50 2077.00 13
1980-02-12 Packing Device Capped w/Cement 2035.50 2040.00 0
1980-02-12 Perforation 1985.00 1990.00 13
1980-02-13 Fracture 1985.00 1990.00 0
1980-02-21 Packing Device Capped w/Cement 1974.00 1979.00 0
1980-02-21 Perforation 555.00 558.00 13
1980-02-22 Acid Treatment 555.00 558.00 0
1980-02-04 Acid Treatment 2073.50 2077.00 0
1980-02-07 Perforation 2056.50 2058.00 13
1980-02-07 Perforation 2062.50 2066.00 13
1980-02-07 Perforation 2067.50 2070.00 13
1980-02-08 Fracture 2056.50 2070.00 0
1980-02-10 Packing Device Capped w/Cement 2049.00 2054.00 0
1980-02-10 Perforation 2044.50 2046.00 13
1980-02-11 Acid Treatment 2044.50 2046.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1177 0.0 0.0 0.0
2001 5381 0.0 0.0 0.0
2002 5991 0.0 0.0 0.0
2003 6294 0.0 0.0 0.0
2004 4014 0.0 0.0 0.0
2005 1072 0.0 0.0 0.0
2006 6359 0.0 0.0 0.0
2007 8042 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 7704 0.0 0.0 0.0
2010 7344 0.0 0.0 0.0
2011 5157 0.0 0.0 0.0

For data sources see[5]

References