If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455050703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.874379,"lon":-114.722312,"icon":""}]} |
| Location: 00/03-07-045-05W5/0 | |
| Location Alias: 00/03-07-45-05 W5M | |
| Location Alias 2: 00/03-07-045-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 07 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: TAC PEMBINA 3-7-45-5 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0425280 | |
| License Date: 2010-10-28 | |
| License Status: Issued | |
| Spud Date: 2011-01-18 | |
| Final Drill Date: 2011-02-01 | |
| Well Total Depth: 3106.00 m | |
| Surface Hole Latitude: 52.874379 | |
| Surface Hole Longitude: -114.722312 |
| Date | Event |
|---|---|
| 2010-10-28 | Obtained License |
| 2011-01-21 | Surface Casing Operation Performed |
| 2011-01-24 | Direction Drilling Operation Performed - Horizontal |
| 2011-01-24 | Well Log Performed |
| 2011-02-01 | Finished Drilling |
| 2011-02-01 | Well Log Performed |
| 2011-02-01 | Well Mode changed to Drilled and Cased |
| 2011-02-04 | Production Casing Operation Performed |
| 2011-02-04 | Rig Released |
| 2011-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-04-05 | Well Began Production |
| 2011-04-05 | Well Fluid changed to Crude Oil |
| 2011-04-05 | Well Mode changed to Flowing |
| 2015-01-05 | Well Fluid changed to Crude Oil |
| 2015-01-05 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-24 | 1326.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-16 | Open Hole/Barefoot Completion | 3104.60 | 3106.00 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2525.50 | 2525.60 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2477.50 | 2477.60 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2432.10 | 2432.20 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2360.70 | 2360.80 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2302.50 | 2302.60 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2244.00 | 2244.10 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2184.80 | 2184.90 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2125.00 | 2125.10 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2077.30 | 2077.40 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2017.20 | 2017.30 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 3031.00 | 3031.10 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 1955.90 | 1956.00 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 1868.10 | 1868.20 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 3007.60 | 3007.70 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2959.80 | 2959.90 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2912.70 | 2912.80 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2864.70 | 2864.80 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2705.40 | 2705.50 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2646.50 | 2646.60 | 0 |
| 2011-02-16 | Multi-Stage Fracture | 2586.60 | 2586.70 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5709 | 0.0 | 0.0 | 0.0 |
| 2012 | 8455 | 0.0 | 0.0 | 0.0 |
| 2013 | 7499 | 0.0 | 0.0 | 0.0 |
| 2014 | 8384 | 0.0 | 0.0 | 0.0 |
| 2015 | 8387 | 0.0 | 0.0 | 0.0 |
| 2016 | 8156 | 0.0 | 0.0 | 0.0 |
| 2017 | 8337 | 0.0 | 0.0 | 0.0 |
| 2018 | 8526 | 0.0 | 0.0 | 0.0 |
| 2019 | 8704 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]