If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455051708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.876786,"lon":-114.704778,"icon":""}]} |
| Location: 00/08-17-045-05W5/0 | |
| Location Alias: 00/08-17-45-05 W5M | |
| Location Alias 2: 00/08-17-045-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 17 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: TEI MINHIK PEMBINA 8-17-45-5 | |
| Operator Name: Tallahassee Exploration Inc. | |
| License Number: 0431093 | |
| License Date: 2011-02-02 | |
| License Status: Amended | |
| Spud Date: 2011-03-02 | |
| Final Drill Date: 2011-03-15 | |
| Well Total Depth: 3146.00 m | |
| Surface Hole Latitude: 52.876786 | |
| Surface Hole Longitude: -114.704778 |
| Date | Event |
|---|---|
| 2011-02-02 | Obtained License |
| 2011-03-03 | Surface Casing Operation Performed |
| 2011-03-05 | Direction Drilling Operation Performed - Horizontal |
| 2011-03-05 | Well Log Performed |
| 2011-03-09 | Intermediate Casing Operation Performed |
| 2011-03-15 | Finished Drilling |
| 2011-03-15 | Well Mode changed to Drilled and Cased |
| 2011-03-18 | Liner Casing Operation Performed |
| 2011-03-19 | Rig Released |
| 2011-06-12 | Well Fluid changed to Crude Oil |
| 2011-06-12 | Well Mode changed to Potential |
| 2011-06-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-06-13 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-07-01 | Well Began Production |
| 2011-07-01 | Well Fluid changed to Crude Oil |
| 2011-07-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-03-05 | 1300.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-06-13 | Open Hole/Barefoot Completion | 2919.10 | 3136.00 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 1989.00 | 1989.10 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 1863.90 | 1864.00 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2893.50 | 2893.60 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2805.00 | 2805.10 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2643.10 | 2643.20 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2578.10 | 2578.20 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2416.00 | 2416.10 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2292.30 | 2292.40 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2191.20 | 2191.30 | 0 |
| 2011-06-13 | Multi-Stage Fracture | 2078.00 | 2078.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 3322 | 0.0 | 0.0 | 0.0 |
| 2012 | 8325 | 0.0 | 0.0 | 0.0 |
| 2013 | 8245 | 0.0 | 0.0 | 0.0 |
| 2014 | 7830 | 0.0 | 0.0 | 0.0 |
| 2015 | 7702 | 0.0 | 0.0 | 0.0 |
| 2016 | 2165 | 0.0 | 0.0 | 0.0 |
| 2017 | 3787 | 0.0 | 0.0 | 0.0 |
| 2018 | 5596 | 0.0 | 0.0 | 0.0 |
| 2019 | 6806 | 0.0 | 0.0 | 0.0 |
| 2020 | 2091 | 0.0 | 0.0 | 0.0 |
For data sources see[6]