If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.849975,"lon":-114.749882,"icon":""}]} |
Location: 00/02-03-045-06W5/0 | |
Location Alias: 00/02-03-45-06 W5M | |
Location Alias 2: 00/02-03-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 03 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC HZ MINHIK 2-3-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0476114 | |
License Date: 2015-07-13 | |
License Status: Issued | |
Spud Date: 2015-07-21 | |
Final Drill Date: 2015-07-31 | |
Well Total Depth: 4387.00 m | |
Surface Hole Latitude: 52.849975 | |
Surface Hole Longitude: -114.749882 |
Date | Event |
---|---|
2015-07-13 | Obtained License |
2015-07-22 | Surface Casing Operation Performed |
2015-07-23 | Direction Drilling Operation Performed - Deviate |
2015-07-24 | Direction Drilling Operation Performed - Horizontal |
2015-07-29 | Well Log Performed |
2015-07-31 | Finished Drilling |
2015-07-31 | Production Casing Operation Performed |
2015-07-31 | Rig Released |
2015-07-31 | Well Mode changed to Drilled and Cased |
2015-09-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-15 | Well Began Production |
2015-09-15 | Well Fluid changed to Crude Oil |
2015-09-15 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-07-21 | Excalibur Drilling Ltd. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-07-23 | 1393.60 | Deviate (5 - 79 degrees) |
2015-07-24 | 1845.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-03 | Multi-Stage Fracture | 4371.40 | 4372.50 | 0 |
2015-09-03 | Multi-Stage Fracture | 3773.70 | 3775.60 | 0 |
2015-09-03 | Multi-Stage Fracture | 3703.70 | 3705.60 | 0 |
2015-09-03 | Multi-Stage Fracture | 3622.10 | 3623.90 | 0 |
2015-09-04 | Multi-Stage Fracture | 3552.50 | 3554.40 | 0 |
2015-09-04 | Multi-Stage Fracture | 3484.00 | 3485.90 | 0 |
2015-09-04 | Multi-Stage Fracture | 3415.50 | 3417.30 | 0 |
2015-09-04 | Multi-Stage Fracture | 3350.00 | 3351.90 | 0 |
2015-09-04 | Multi-Stage Fracture | 3270.20 | 3272.10 | 0 |
2015-09-04 | Multi-Stage Fracture | 3204.10 | 3206.00 | 0 |
2015-09-04 | Multi-Stage Fracture | 3136.10 | 3138.00 | 0 |
2015-09-03 | Multi-Stage Fracture | 4353.60 | 4355.50 | 0 |
2015-09-04 | Multi-Stage Fracture | 3057.60 | 3059.50 | 0 |
2015-09-04 | Multi-Stage Fracture | 2990.40 | 2992.20 | 0 |
2015-09-04 | Multi-Stage Fracture | 2924.10 | 2926.00 | 0 |
2015-09-04 | Multi-Stage Fracture | 2856.80 | 2858.60 | 0 |
2015-09-04 | Multi-Stage Fracture | 2776.40 | 2778.30 | 0 |
2015-09-04 | Multi-Stage Fracture | 2708.50 | 2710.30 | 0 |
2015-09-04 | Multi-Stage Fracture | 2629.00 | 2630.90 | 0 |
2015-09-04 | Multi-Stage Fracture | 2561.70 | 2563.50 | 0 |
2015-09-04 | Multi-Stage Fracture | 2481.50 | 2483.30 | 0 |
2015-09-04 | Multi-Stage Fracture | 2415.10 | 2416.90 | 0 |
2015-09-03 | Multi-Stage Fracture | 4284.00 | 4285.90 | 0 |
2015-09-04 | Multi-Stage Fracture | 2348.20 | 2350.10 | 0 |
2015-09-04 | Multi-Stage Fracture | 2269.50 | 2271.40 | 0 |
2015-09-04 | Multi-Stage Fracture | 2202.20 | 2204.50 | 0 |
2015-09-04 | Multi-Stage Fracture | 2121.70 | 2123.50 | 0 |
2015-09-03 | Multi-Stage Fracture | 4214.90 | 4216.80 | 0 |
2015-09-03 | Multi-Stage Fracture | 4133.60 | 4135.50 | 0 |
2015-09-03 | Multi-Stage Fracture | 4064.50 | 4066.30 | 0 |
2015-09-03 | Multi-Stage Fracture | 3995.20 | 3997.10 | 0 |
2015-09-03 | Multi-Stage Fracture | 3925.80 | 3927.70 | 0 |
2015-09-03 | Multi-Stage Fracture | 3843.50 | 3845.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-03 | 2015-09-04 | 1,701 | 3,192 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 81.8548 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 14.0107 | N/A | ||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 3.8159 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0102 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0102 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0102 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0102 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0102 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.18 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.18 | N/A | ||||
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0417 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0417 | N/A | ||||
FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0863 | N/A | |
anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0863 | N/A | ||||
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0863 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-08-10 | 2015-08-23 | Groundwater - Non-saline less than or equal to 150m deep | 1387 |
2015-08-14 | 2015-08-25 | Groundwater - Non-saline less than or equal to 150m deep | 2429 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2240 | 0.0 | 0.0 | 0.0 |
2016 | 8597 | 0.0 | 0.0 | 0.0 |
2017 | 8457 | 0.0 | 0.0 | 0.0 |
2018 | 8636 | 0.0 | 0.0 | 0.0 |
2019 | 8616 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-07-31 | No Incident Encountered | 0.00 | 0.00 |
2015-09-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]