If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.863579,"lon":-114.797611,"icon":""}]} |
Location: 00/05-09-045-06W5/0 | |
Location Alias: 00/05-09-45-06 W5M | |
Location Alias 2: 00/05-09-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 09 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 5-9-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0444404 | |
License Date: 2012-02-23 | |
License Status: Issued | |
Spud Date: 2012-07-18 | |
Final Drill Date: 2012-07-25 | |
Well Total Depth: 3216.00 m | |
Surface Hole Latitude: 52.863579 | |
Surface Hole Longitude: -114.797611 |
Date | Event |
---|---|
2012-02-23 | Obtained License |
2012-07-18 | Lost Circulation Occurred |
2012-07-19 | Surface Casing Operation Performed |
2012-07-21 | Direction Drilling Operation Performed - Deviate |
2012-07-22 | Direction Drilling Operation Performed - Horizontal |
2012-07-25 | Finished Drilling |
2012-07-25 | Well Log Performed |
2012-07-25 | Well Mode changed to Drilled and Cased |
2012-07-28 | Production Casing Operation Performed |
2012-07-28 | Rig Released |
2012-10-13 | Well Log Performed |
2012-10-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-19 | Well Log Performed |
2012-11-11 | Well Began Production |
2012-11-11 | Well Fluid changed to Crude Oil |
2012-11-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-18 | Precision Drilling Corporation | 196 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-21 | 1247.00 | Deviate (5 - 79 degrees) |
2012-07-22 | 1824.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-17 | Open Hole/Barefoot Completion | 3204.20 | 3216.00 | 0 |
2012-10-17 | Multi-Stage Fracture | 2532.30 | 2532.40 | 0 |
2012-10-17 | Multi-Stage Fracture | 2448.80 | 2448.90 | 0 |
2012-10-17 | Multi-Stage Fracture | 2365.30 | 2365.40 | 0 |
2012-10-17 | Multi-Stage Fracture | 2295.30 | 2295.40 | 0 |
2012-10-17 | Multi-Stage Fracture | 2225.40 | 2225.50 | 0 |
2012-10-17 | Multi-Stage Fracture | 2142.10 | 2142.20 | 0 |
2012-10-17 | Multi-Stage Fracture | 2072.10 | 2072.20 | 0 |
2012-10-17 | Multi-Stage Fracture | 2002.30 | 2002.40 | 0 |
2012-10-17 | Multi-Stage Fracture | 1905.40 | 1905.50 | 0 |
2012-10-17 | Multi-Stage Fracture | 3172.40 | 3172.50 | 0 |
2012-10-17 | Multi-Stage Fracture | 3102.60 | 3102.70 | 0 |
2012-10-17 | Multi-Stage Fracture | 2992.20 | 2992.30 | 0 |
2012-10-17 | Multi-Stage Fracture | 2922.40 | 2922.50 | 0 |
2012-10-17 | Multi-Stage Fracture | 2852.50 | 2852.60 | 0 |
2012-10-17 | Multi-Stage Fracture | 2769.10 | 2769.20 | 0 |
2012-10-17 | Multi-Stage Fracture | 2699.30 | 2699.40 | 0 |
2012-10-17 | Multi-Stage Fracture | 2615.80 | 2615.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1178 | 0.0 | 0.0 | 0.0 |
2013 | 8191 | 0.0 | 0.0 | 0.0 |
2014 | 8422 | 0.0 | 0.0 | 0.0 |
2015 | 8405 | 0.0 | 0.0 | 0.0 |
2016 | 8399 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8711 | 0.0 | 0.0 | 0.0 |
2019 | 8751 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-18 | Lost Circulation | 56.00 | 436.00 |
2012-10-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]