If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455061709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.884371,"lon":-114.846409,"icon":""}]} |
Location: 00/09-17-045-06W5/0 | |
Location Alias: 00/09-17-45-06 W5M | |
Location Alias 2: 00/09-17-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 17 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 9-17-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0440104 | |
License Date: 2011-12-01 | |
License Status: Issued | |
Spud Date: 2012-02-02 | |
Final Drill Date: 2012-02-15 | |
Well Total Depth: 3015.00 m | |
Surface Hole Latitude: 52.884371 | |
Surface Hole Longitude: -114.846409 |
Date | Event |
---|---|
2011-12-01 | Obtained License |
2012-02-04 | Surface Casing Operation Performed |
2012-02-05 | Well Log Performed |
2012-02-06 | Direction Drilling Operation Performed - Horizontal |
2012-02-11 | Well Log Performed |
2012-02-12 | Well Log Performed |
2012-02-15 | Finished Drilling |
2012-02-15 | Well Log Performed |
2012-02-15 | Well Mode changed to Drilled and Cased |
2012-02-17 | Production Casing Operation Performed |
2012-02-17 | Rig Released |
2012-08-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-01 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-05 | Well Log Performed |
2012-08-09 | Well Log Performed |
2012-10-02 | Well Began Production |
2012-10-02 | Well Fluid changed to Crude Oil |
2012-10-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-02 | Precision Drilling Corporation | 371 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-06 | 784.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-01 | Open Hole/Barefoot Completion | 3004.80 | 3015.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 2416.60 | 2416.70 | 0 |
2012-08-02 | Multi-Stage Fracture | 2366.90 | 2367.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 2289.00 | 2289.10 | 0 |
2012-08-02 | Multi-Stage Fracture | 2225.20 | 2225.30 | 0 |
2012-08-02 | Multi-Stage Fracture | 2149.60 | 2149.70 | 0 |
2012-08-02 | Multi-Stage Fracture | 2099.80 | 2099.90 | 0 |
2012-08-02 | Multi-Stage Fracture | 2036.10 | 2036.20 | 0 |
2012-08-02 | Multi-Stage Fracture | 1944.10 | 1944.20 | 0 |
2012-08-02 | Multi-Stage Fracture | 1880.60 | 1880.70 | 0 |
2012-08-01 | Multi-Stage Fracture | 2968.60 | 2968.70 | 0 |
2012-08-01 | Multi-Stage Fracture | 2890.90 | 2891.00 | 0 |
2012-08-01 | Multi-Stage Fracture | 2841.20 | 2841.30 | 0 |
2012-08-01 | Multi-Stage Fracture | 2763.20 | 2763.30 | 0 |
2012-08-01 | Multi-Stage Fracture | 2699.50 | 2699.60 | 0 |
2012-08-01 | Multi-Stage Fracture | 2635.80 | 2635.90 | 0 |
2012-08-01 | Multi-Stage Fracture | 2557.90 | 2558.00 | 0 |
2012-08-02 | Multi-Stage Fracture | 2494.20 | 2694.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2124 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8424 | 0.0 | 0.0 | 0.0 |
2015 | 8577 | 0.0 | 0.0 | 0.0 |
2016 | 8663 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8388 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]