If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455062606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.908892,"lon":-114.763514,"icon":""}]} |
Location: 00/06-26-045-06W5/0 | |
Location Alias: 00/06-26-45-06 W5M | |
Location Alias 2: 00/06-26-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 26 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC PEMBINA 6-26-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0095023 | |
License Date: 1982-02-10 | |
License Status: Issued | |
Spud Date: 1982-02-12 | |
Final Drill Date: 1982-02-19 | |
Well Total Depth: 1619.00 m | |
Surface Hole Latitude: 52.908892 | |
Surface Hole Longitude: -114.763514 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-02-10 | Obtained License |
1982-02-19 | Finished Drilling |
1982-02-19 | Well Mode changed to Drilled and Cased |
1982-02-20 | Production Casing Operation Performed |
1982-03-09 | Perforation Treatment Performed - Jet Perforation |
1982-03-10 | Perforation Treatment Performed - Fractured |
1982-03-17 | Well Began Production |
1982-03-17 | Well Fluid changed to Crude Oil |
1982-03-17 | Well Mode changed to Flowing |
1984-12-01 | Well Fluid changed to Crude Oil |
1984-12-01 | Well Mode changed to Suspended |
1987-12-21 | Well Fluid changed to Crude Oil |
1987-12-21 | Well Mode changed to Flowing |
1998-03-02 | Well Fluid changed to Crude Oil |
1998-03-02 | Well Mode changed to Suspended |
1998-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-03-04 | Perforation Treatment Performed - Jet Perforation |
1998-03-04 | Plug Back Performed |
1998-03-04 | Well Fluid changed to Crude Oil |
1998-03-04 | Well Log Performed |
1998-03-04 | Well Mode changed to Abandoned Zone |
1998-03-05 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-03-09 | Perforation | 1578.00 | 1581.50 | 13 |
1982-03-10 | Fracture | 1578.00 | 1581.50 | 0 |
1998-03-04 | Packing Device Capped w/Cement | 1563.00 | 1571.00 | 0 |
1998-03-04 | Perforation | 1226.00 | 1227.50 | 17 |
1998-03-04 | Perforation | 1229.50 | 1232.00 | 17 |
1998-03-05 | Fracture | 1226.00 | 1232.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 4069 | 0.0 | 0.0 | 0.0 |
1987 | 264 | 0.0 | 0.0 | 0.0 |
1988 | 8488 | 0.0 | 0.0 | 0.0 |
1989 | 8687 | 0.0 | 0.0 | 0.0 |
1990 | 8495 | 0.0 | 0.0 | 0.0 |
1991 | 8759 | 0.0 | 0.0 | 0.0 |
1992 | 8783 | 0.0 | 0.0 | 0.0 |
1993 | 8519 | 0.0 | 0.0 | 0.0 |
1994 | 8759 | 0.0 | 0.0 | 0.0 |
1995 | 3260 | 0.0 | 0.0 | 0.0 |
1996 | 8257 | 0.0 | 0.0 | 0.0 |
1997 | 8447 | 0.0 | 0.0 | 0.0 |
1998 | 1320 | 0.0 | 0.0 | 0.0 |
For data sources see[5]