If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455062916003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.913865,"lon":-114.827181,"icon":""}]} |
| Location: 00/16-29-045-06W5/3 | |
| Location Alias: 00/16-29-45-06 W5M | |
| Location Alias 2: 00/16-29-045-06 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 29 | |
| County/Municipality: County of Wetaskiwin No. 10 | |
| Well Name: PENN WEST ET AL PEMBINA 16-29-45-6 | |
| Operator Name: Tamarack Acquisition Corp. | |
| License Number: 0103573 | |
| License Date: 1983-10-17 | |
| License Status: Issued | |
| Spud Date: 1983-10-17 | |
| Final Drill Date: 1983-10-29 | |
| Well Total Depth: 1934.00 m | |
| Surface Hole Latitude: 52.913865 | |
| Surface Hole Longitude: -114.827181 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-10-17 | Obtained License |
| 1983-10-18 | Lost Circulation Occurred |
| 1983-10-25 | Well Log Performed |
| 1983-10-26 | Drill Stem Test Performed |
| 1983-10-29 | Finished Drilling |
| 1983-10-29 | Well Mode changed to Drilled and Cased |
| 1983-10-30 | Drill Stem Test Performed |
| 1983-10-31 | Production Casing Operation Performed |
| 1983-11-13 | Perforation Treatment Performed - Jet Perforation |
| 1983-11-15 | Perforation Treatment Performed - Fractured |
| 1984-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-02-02 | Perforation Treatment Performed - Jet Perforation |
| 1984-02-03 | Perforation Treatment Performed - Fractured |
| 1984-02-12 | Perforation Treatment Performed - Jet Perforation |
| 1984-02-13 | Perforation Treatment Performed - Fractured |
| 1984-04-13 | Well Began Production |
| 1984-04-13 | Well Fluid changed to Crude Oil |
| 1984-04-13 | Well Mode changed to Pumping |
| 1984-05-30 | Well Fluid changed to Crude Oil |
| 1984-05-30 | Well Mode changed to Suspended |
| 1984-08-01 | Well Fluid changed to Crude Oil |
| 1984-08-01 | Well Mode changed to Pumping |
| 1984-11-10 | Well Fluid changed to Crude Oil |
| 1984-11-10 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-11-13 | Perforation | 1903.20 | 1905.80 | 13 |
| 1983-11-15 | Fracture | 1903.20 | 1905.80 | 0 |
| 1984-01-31 | Packing Device Capped w/Cement | 1883.00 | 1886.00 | 0 |
| 1984-02-02 | Perforation | 1609.50 | 1611.50 | 13 |
| 1984-02-02 | Acid Treatment | 1609.50 | 1611.50 | 0 |
| 1984-02-03 | Fracture | 1609.50 | 1611.50 | 0 |
| 1984-02-12 | Perforation | 1159.80 | 1163.00 | 13 |
| 1984-02-13 | Fracture | 1159.80 | 1163.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 1948 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1983-10-18 | Lost Circulation | 196.00 | 199.50 |
For data sources see[6]