If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455082914002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.913651,"lon":-115.131359,"icon":""}]} |
Location: 00/14-29-045-08W5/2 | |
Location Alias: 00/14-29-45-08 W5M | |
Location Alias 2: 00/14-29-045-08 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 08 | |
Section: 29 | |
County/Municipality: Clearwater County | |
Well Name: BURLINGTON ET AL 100 PEM 14-29-45-8 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0228761 | |
License Date: 1999-11-17 | |
License Status: Issued | |
Spud Date: 1999-11-21 | |
Final Drill Date: 1999-12-03 | |
Well Total Depth: 2300.00 m | |
Surface Hole Latitude: 52.913651 | |
Surface Hole Longitude: -115.131359 |
Date | Event |
---|---|
1999-11-17 | Obtained License |
1999-11-24 | Surface Casing Operation Performed |
1999-12-03 | Finished Drilling |
1999-12-03 | Well Log Performed |
1999-12-03 | Well Mode changed to Drilled and Cased |
1999-12-05 | Production Casing Operation Performed |
1999-12-05 | Rig Released |
2000-01-03 | Perforation Treatment Performed - Jet Perforation |
2000-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-07 | Plug Back Performed |
2000-01-08 | Perforation Treatment Performed - Jet Perforation |
2000-01-08 | Well Mode changed to Drilled and Cased |
2000-01-11 | Perforation Treatment Performed - Fractured |
2000-01-11 | Well Log Performed |
2000-06-30 | Well Began Production |
2000-06-30 | Well Fluid changed to Gas |
2000-06-30 | Well Mode changed to Flowing |
2003-01-01 | Well Fluid changed to Gas |
2003-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-01-03 | Perforation | 2064.00 | 2065.50 | 20 |
2000-01-07 | Packing Device Capped w/Cement | 2043.00 | 2045.00 | 0 |
2000-01-08 | Perforation | 1750.50 | 1753.50 | 20 |
2000-01-11 | Fracture | 1750.50 | 1753.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 4249 | 0.0 | 0.0 | 0.0 |
2001 | 8528 | 0.0 | 0.0 | 0.0 |
2002 | 8247 | 0.0 | 0.0 | 0.0 |
2003 | 4811 | 0.0 | 0.0 | 0.0 |
2004 | 8474 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8735 | 0.0 | 0.0 | 0.0 |
2008 | 8759 | 0.0 | 0.0 | 0.0 |
2009 | 8255 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 8546 | 0.0 | 0.0 | 0.0 |
2012 | 8735 | 0.0 | 0.0 | 0.0 |
2013 | 8729 | 0.0 | 0.0 | 0.0 |
2014 | 8730 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 7127 | 0.0 | 0.0 | 0.0 |
2018 | 2339 | 0.0 | 0.0 | 0.0 |
2019 | 4501 | 0.0 | 0.0 | 0.0 |
2020 | 1503 | 0.0 | 0.0 | 0.0 |
For data sources see[5]