X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0455090413000

Well Details

Well ID: 0455090413000
Loading map...
Location: 00/13-04-045-09W5/0
Location Alias: 00/13-04-45-09 W5M
Location Alias 2: 00/13-04-045-09 W5/00
Country: Canada
Province: Alberta
Township: 045
Meridian: 5
Range: 09
Section: 04
County/Municipality: Clearwater County
Well Name: BELLATRIX HZ WILLGR 13-4-45-9
Operator Name: Bellatrix Exploration Ltd.
License Number: 0443213
License Date: 2012-01-23
License Status: Issued
Spud Date: 2012-08-28
Final Drill Date: 2012-09-12
Well Total Depth: 3734.00 m
Surface Hole Latitude: 52.842755
Surface Hole Longitude: -115.254519

For data sources see[1][2]

Well History

Date Event
2012-01-23 Obtained License
2012-08-30 Surface Casing Operation Performed
2012-09-03 Direction Drilling Operation Performed - Deviate
2012-09-05 Direction Drilling Operation Performed - Horizontal
2012-09-08 Intermediate Casing Operation Performed
2012-09-12 Finished Drilling
2012-09-12 Well Log Performed
2012-09-12 Well Mode changed to Drilled and Cased
2012-09-15 Liner Casing Operation Performed
2012-09-15 Rig Released
2012-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-01 Well Began Production
2012-10-01 Well Fluid changed to Gas
2012-10-01 Well Mode changed to Flowing
2018-01-17 Well Fluid changed to Gas
2018-01-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-28 Chinook Drilling Inc. 10 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-03 2064.20 Deviate (5 - 79 degrees)
2012-09-05 2392.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-27 Multi-Stage Fracture 3652.80 3652.90 0
2012-09-28 Multi-Stage Fracture 2965.20 2965.30 0
2012-09-28 Multi-Stage Fracture 2888.80 2888.90 0
2012-09-28 Multi-Stage Fracture 2824.00 2824.10 0
2012-09-28 Multi-Stage Fracture 2745.70 2745.80 0
2012-09-28 Multi-Stage Fracture 2666.80 2666.90 0
2012-09-28 Multi-Stage Fracture 2589.50 2589.60 0
2012-09-28 Multi-Stage Fracture 2521.30 2521.40 0
2012-09-27 Multi-Stage Fracture 3562.60 3562.70 0
2012-09-27 Multi-Stage Fracture 3489.70 3489.80 0
2012-09-27 Multi-Stage Fracture 3407.40 3407.50 0
2012-09-27 Multi-Stage Fracture 3338.60 3338.70 0
2012-09-27 Multi-Stage Fracture 3261.50 3261.60 0
2012-09-27 Multi-Stage Fracture 3195.20 3195.30 0
2012-09-27 Multi-Stage Fracture 3115.10 3115.20 0
2012-09-28 Multi-Stage Fracture 3046.20 3046.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2208 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 8611 0.0 0.0 0.0
2017 7751 0.0 0.0 0.0
2018 8724 0.0 0.0 0.0
2019 8551 0.0 0.0 0.0
2020 2062 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-15 No Incident Encountered 0.00 0.00
2012-09-28 No Incident Encountered 0.00 0.00

For data sources see[8]

References