If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455092502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.916619,"lon":-115.171158,"icon":""}]} |
Location: 00/02-25-045-09W5/0 | |
Location Alias: 00/02-25-45-09 W5M | |
Location Alias 2: 00/02-25-045-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 09 | |
Section: 25 | |
County/Municipality: Clearwater County | |
Well Name: BELLATRIX HZ PEMBINA 2-25-45-9 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0420655 | |
License Date: 2010-05-26 | |
License Status: Issued | |
Spud Date: 2010-06-19 | |
Final Drill Date: 2010-07-09 | |
Well Total Depth: 3472.00 m | |
Surface Hole Latitude: 52.916619 | |
Surface Hole Longitude: -115.171158 |
Date | Event |
---|---|
2010-05-26 | Obtained License |
2010-06-23 | Surface Casing Operation Performed |
2010-06-28 | Direction Drilling Operation Performed - Horizontal |
2010-07-04 | Intermediate Casing Operation Performed |
2010-07-04 | Well Log Performed |
2010-07-09 | Finished Drilling |
2010-07-09 | Well Mode changed to Drilled and Cased |
2010-07-12 | Rig Released |
2010-07-19 | Perforation Treatment Performed - Fractured |
2010-07-19 | Perforation Treatment Performed - Open-Hole Completion |
2010-08-13 | Well Began Production |
2010-08-13 | Well Fluid changed to Gas |
2010-08-13 | Well Mode changed to Flowing |
2016-09-25 | Well Fluid changed to Gas |
2016-09-25 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-28 | 1810.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-07-19 | Open Hole/Barefoot Completion | 2295.50 | 3472.00 | 0 |
2010-07-19 | Fracture | 2861.10 | 2918.40 | 0 |
2010-07-19 | Fracture | 2788.50 | 2861.10 | 0 |
2010-07-19 | Fracture | 2717.80 | 2788.50 | 0 |
2010-07-19 | Fracture | 2648.00 | 2717.80 | 0 |
2010-07-19 | Fracture | 2588.60 | 2648.00 | 0 |
2010-07-19 | Fracture | 2516.00 | 2588.60 | 0 |
2010-07-19 | Fracture | 2442.60 | 2516.00 | 0 |
2010-07-19 | Fracture | 2384.20 | 2442.60 | 0 |
2010-07-19 | Fracture | 2313.50 | 2384.20 | 0 |
2010-07-19 | Fracture | 3426.00 | 3472.00 | 0 |
2010-07-19 | Fracture | 3330.60 | 3407.80 | 0 |
2010-07-19 | Fracture | 3271.90 | 3330.60 | 0 |
2010-07-19 | Fracture | 3200.30 | 3271.90 | 0 |
2010-07-19 | Fracture | 3129.10 | 3200.30 | 0 |
2010-07-19 | Fracture | 3060.20 | 3129.10 | 0 |
2010-07-19 | Fracture | 2989.50 | 3060.20 | 0 |
2010-07-19 | Fracture | 2918.40 | 2989.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3648 | 0.0 | 0.0 | 0.0 |
2011 | 8492 | 0.0 | 0.0 | 0.0 |
2012 | 8778 | 0.0 | 0.0 | 0.0 |
2013 | 8159 | 0.0 | 0.0 | 0.0 |
2014 | 8736 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8531 | 0.0 | 0.0 | 0.0 |
2017 | 8638 | 0.0 | 0.0 | 0.0 |
2018 | 7989 | 0.0 | 0.0 | 0.0 |
2019 | 7444 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]