If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455092516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.911573,"lon":-115.18887,"icon":""}]} |
| Location: 00/16-25-045-09W5/0 | |
| Location Alias: 00/16-25-45-09 W5M | |
| Location Alias 2: 00/16-25-045-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 25 | |
| County/Municipality: Clearwater County | |
| Well Name: BELLATRIX HZ PEMBINA 16-25-45-9 | |
| Operator Name: Bellatrix Exploration Ltd. | |
| License Number: 0424525 | |
| License Date: 2010-10-13 | |
| License Status: Suspension | |
| Spud Date: 2010-11-07 | |
| Final Drill Date: 2010-11-23 | |
| Well Total Depth: 3284.00 m | |
| Surface Hole Latitude: 52.911573 | |
| Surface Hole Longitude: -115.188870 |
| Date | Event |
|---|---|
| 2010-10-13 | Obtained License |
| 2010-11-09 | Surface Casing Operation Performed |
| 2010-11-12 | Direction Drilling Operation Performed - Horizontal |
| 2010-11-14 | Well Log Performed |
| 2010-11-15 | Intermediate Casing Operation Performed |
| 2010-11-16 | Well Log Performed |
| 2010-11-23 | Finished Drilling |
| 2010-11-23 | Well Mode changed to Drilled and Cased |
| 2010-11-25 | Liner Casing Operation Performed |
| 2010-11-27 | Rig Released |
| 2010-11-30 | Well Log Performed |
| 2010-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-04 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-12-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-01-01 | Well Began Production |
| 2011-01-01 | Well Fluid changed to Crude Oil |
| 2011-01-01 | Well Mode changed to Pumping |
| 2018-06-02 | Well Fluid changed to Crude Oil |
| 2018-06-02 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-12 | 1429.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-04 | Open Hole/Barefoot Completion | 3283.60 | 3284.00 | 0 |
| 2010-12-06 | Multi-Stage Fracture | 2696.40 | 2696.50 | 0 |
| 2010-12-07 | Multi-Stage Fracture | 2622.50 | 2622.60 | 0 |
| 2010-12-07 | Multi-Stage Fracture | 2548.70 | 2548.80 | 0 |
| 2010-12-07 | Multi-Stage Fracture | 2475.20 | 2475.30 | 0 |
| 2010-12-07 | Multi-Stage Fracture | 2401.50 | 2401.60 | 0 |
| 2010-12-07 | Multi-Stage Fracture | 2327.90 | 2328.00 | 0 |
| 2010-12-08 | Multi-Stage Fracture | 2254.30 | 2254.40 | 0 |
| 2010-12-08 | Multi-Stage Fracture | 2181.30 | 2181.40 | 0 |
| 2010-12-08 | Multi-Stage Fracture | 2094.10 | 2094.20 | 0 |
| 2010-12-08 | Multi-Stage Fracture | 2033.90 | 2034.00 | 0 |
| 2010-12-04 | Multi-Stage Fracture | 3275.30 | 3275.40 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 3219.90 | 3220.00 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 3146.70 | 3146.80 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 3074.10 | 3074.20 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 3001.40 | 3001.50 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 2928.20 | 2928.30 | 0 |
| 2010-12-05 | Multi-Stage Fracture | 2856.10 | 2856.20 | 0 |
| 2010-12-06 | Multi-Stage Fracture | 2771.00 | 2771.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5404 | 0.0 | 0.0 | 0.0 |
| 2012 | 7985 | 0.0 | 0.0 | 0.0 |
| 2013 | 7382 | 0.0 | 0.0 | 0.0 |
| 2014 | 8533 | 0.0 | 0.0 | 0.0 |
| 2015 | 8466 | 0.0 | 0.0 | 0.0 |
| 2016 | 8553 | 0.0 | 0.0 | 0.0 |
| 2017 | 6816 | 0.0 | 0.0 | 0.0 |
| 2018 | 3119 | 0.0 | 0.0 | 0.0 |
For data sources see[6]