If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0455111016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.857458,"lon":-115.510219,"icon":""}]} |
| Location: 00/16-10-045-11W5/0 | |
| Location Alias: 00/16-10-45-11 W5M | |
| Location Alias 2: 00/16-10-045-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 045 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 10 | |
| County/Municipality: Brazeau County | |
| Well Name: BELLATRIX PEMBINA 16-10-45-11 | |
| Operator Name: Bellatrix Exploration Ltd. | |
| License Number: 0462331 | |
| License Date: 2013-12-12 | |
| License Status: Issued | |
| Spud Date: 2014-01-30 | |
| Final Drill Date: 2014-02-14 | |
| Well Total Depth: 3668.00 m | |
| Surface Hole Latitude: 52.857458 | |
| Surface Hole Longitude: -115.510219 |
| Date | Event |
|---|---|
| 2013-12-12 | Obtained License |
| 2014-01-30 | Lost Circulation Occurred |
| 2014-02-01 | Surface Casing Operation Performed |
| 2014-02-05 | Direction Drilling Operation Performed - Deviate |
| 2014-02-07 | Direction Drilling Operation Performed - Horizontal |
| 2014-02-08 | Intermediate Casing Operation Performed |
| 2014-02-08 | Well Log Performed |
| 2014-02-14 | Finished Drilling |
| 2014-02-14 | Well Log Performed |
| 2014-02-14 | Well Mode changed to Drilled and Cased |
| 2014-02-17 | Liner Casing Operation Performed |
| 2014-02-17 | Rig Released |
| 2014-02-20 | Well Log Performed |
| 2014-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-03-12 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-03-15 | Well Began Production |
| 2014-03-15 | Well Fluid changed to Crude Oil |
| 2014-03-15 | Well Mode changed to Flowing |
| 2015-06-01 | Well Fluid changed to Crude Oil |
| 2015-06-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-01-30 | Excalibur Drilling Ltd. | 2 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-02-05 | 1700.10 | Deviate (5 - 79 degrees) |
| 2014-02-07 | 2297.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-03-12 | Open Hole/Barefoot Completion | 3662.00 | 3667.00 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3024.50 | 3024.60 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2941.80 | 2941.90 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2858.90 | 2859.00 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2789.10 | 2789.20 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2706.10 | 2706.20 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2636.40 | 2636.50 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2553.20 | 2553.30 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2483.50 | 2483.60 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 2400.20 | 2400.30 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3640.30 | 3640.40 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3564.70 | 3564.80 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3482.50 | 3482.60 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3412.80 | 3412.90 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3330.20 | 3330.30 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3246.90 | 3247.00 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3177.60 | 3177.70 | 0 |
| 2014-03-12 | Multi-Stage Fracture | 3094.30 | 3094.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-03-12 | 2014-03-12 | 2,068 | 2,890 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 81.0277 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.7197 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.7644 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.4888 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0248 | N/A | |
| Water | 7732-18-5 | 100 | 0.0253 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1852 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0851 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0864 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0852 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0759 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0851 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.086 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0864 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.4472 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.091 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-03-02 | 2014-03-02 | Recycled Fracturing Water (treated at well site) | 1859 |
| 2014-03-02 | 2014-03-02 | Central Water Distribution Facility | 419 |
| 2014-03-02 | 2014-03-02 | Central Water Distribution Facility | 1372 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 6990 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8388 | 0.0 | 0.0 | 0.0 |
| 2017 | 8688 | 0.0 | 0.0 | 0.0 |
| 2018 | 8555 | 0.0 | 0.0 | 0.0 |
| 2019 | 8525 | 0.0 | 0.0 | 0.0 |
| 2020 | 2147 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-01-30 | Lost Circulation | 51.00 | 613.50 |
| 2014-03-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]