If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464062616020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.001219,"lon":-110.757377,"icon":""}]} |
Location: 02/16-26-046-06W4/0 | |
Location Alias: 02/16-26-46-06 W4M | |
Location Alias 2: 02/16-26-046-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 06 | |
Section: 26 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CENOENERGY 102 BAXT 16-26-46-6 | |
Operator Name: Vital Energy Inc. | |
License Number: 0415802 | |
License Date: 2009-12-18 | |
License Status: Suspension | |
Spud Date: 2009-12-28 | |
Final Drill Date: 2010-01-01 | |
Well Total Depth: 720.00 m | |
Surface Hole Latitude: 53.001219 | |
Surface Hole Longitude: -110.757377 |
Date | Event |
---|---|
2009-12-18 | Obtained License |
2009-12-29 | Surface Casing Operation Performed |
2010-01-01 | Finished Drilling |
2010-01-01 | Well Log Performed |
2010-01-01 | Well Mode changed to Drilled and Cased |
2010-01-02 | Production Casing Operation Performed |
2010-01-02 | Rig Released |
2010-01-13 | Perforation Treatment Performed - Jet Perforation |
2010-01-20 | Well Began Production |
2010-01-20 | Well Fluid changed to Crude Oil |
2010-01-20 | Well Mode changed to Pumping |
2011-10-12 | Perforation Treatment Performed - Jet Perforation |
2014-04-01 | Well Fluid changed to Crude Oil |
2014-04-01 | Well Mode changed to Suspended |
2019-09-07 | Well Fluid changed to Crude Oil |
2019-09-07 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-13 | Perforation | 664.00 | 667.00 | 13 |
2011-10-12 | Perforation | 662.50 | 665.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 8279 | 0.0 | 0.0 | 0.0 |
2011 | 3726 | 0.0 | 0.0 | 0.0 |
2012 | 2862 | 0.0 | 0.0 | 0.0 |
2019 | 2774 | 0.0 | 0.0 | 0.0 |
2020 | 1877 | 0.0 | 0.0 | 0.0 |
For data sources see[5]