If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464091007023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.951027,"lon":-111.221621,"icon":""}]} |
Location: 02/07-10-046-09W4/3 | |
Location Alias: 02/07-10-46-09 W4M | |
Location Alias 2: 02/07-10-046-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 09 | |
Section: 10 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CLEO ENERGY VIK-KINS 7-10-46-9 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0276849 | |
License Date: 2002-11-27 | |
License Status: Suspension | |
Spud Date: 2002-12-02 | |
Final Drill Date: 2002-12-05 | |
Well Total Depth: 760.00 m | |
Surface Hole Latitude: 52.951027 | |
Surface Hole Longitude: -111.221621 |
Date | Event |
---|---|
2002-11-27 | Obtained License |
2002-12-03 | Surface Casing Operation Performed |
2002-12-05 | Finished Drilling |
2002-12-05 | Well Log Performed |
2002-12-05 | Well Mode changed to Drilled and Cased |
2002-12-06 | Drill Stem Test Performed |
2002-12-06 | Production Casing Operation Performed |
2002-12-06 | Rig Released |
2002-12-07 | Drill Stem Test Performed |
2002-12-17 | Perforation Treatment Performed - Jet Perforation |
2002-12-17 | Well Log Performed |
2002-12-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-12-22 | Perforation Treatment Performed - Jet Perforation |
2002-12-22 | Plug Back Performed |
2002-12-22 | Well Log Performed |
2003-01-17 | Well Began Production |
2003-01-17 | Well Fluid changed to Gas |
2003-01-17 | Well Mode changed to Flowing |
2006-07-01 | Well Fluid changed to Gas |
2006-07-01 | Well Mode changed to Suspended |
2009-07-15 | Well Fluid changed to Gas |
2009-07-15 | Well Mode changed to Flowing |
2013-02-08 | Well Fluid changed to Gas |
2013-02-08 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-17 | Perforation | 739.00 | 740.00 | 13 |
2002-12-22 | Packing Device Capped w/Cement | 726.00 | 734.00 | 0 |
2002-12-22 | Perforation | 713.00 | 714.30 | 13 |
2002-12-22 | Perforation | 668.00 | 670.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 8759 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 3623 | 0.0 | 0.0 | 0.0 |
2009 | 4077 | 0.0 | 0.0 | 0.0 |
2010 | 6623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]