If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0464173010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.998139,"lon":-112.456205,"icon":""}]} |
| Location: 00/10-30-046-17W4/0 | |
| Location Alias: 00/10-30-46-17 W4M | |
| Location Alias 2: 00/10-30-046-17 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 046 | |
| Meridian: 4 | |
| Range: 17 | |
| Section: 30 | |
| County/Municipality: Camrose County | |
| Well Name: PEOC BRUCE 10-30-46-17 | |
| Operator Name: Sequoia Resources Corp. | |
| License Number: 0005363 | |
| License Date: 1952-09-25 | |
| License Status: RecCertified | |
| Spud Date: 1952-11-03 | |
| Final Drill Date: 1952-12-13 | |
| Well Total Depth: 1441.70 m | |
| Surface Hole Latitude: 52.998139 | |
| Surface Hole Longitude: -112.456205 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-09-25 | Obtained License |
| 1952-11-12 | Drill Stem Test Performed |
| 1952-11-14 | Drill Stem Test Performed |
| 1952-11-17 | Drill Stem Test Performed |
| 1952-11-18 | Drill Stem Test Performed |
| 1952-11-19 | Drill Stem Test Performed |
| 1952-11-20 | Drill Stem Test Performed |
| 1952-11-21 | Drill Stem Test Performed |
| 1952-11-22 | Drill Stem Test Performed |
| 1952-11-23 | Drill Stem Test Performed |
| 1952-11-24 | Drill Stem Test Performed |
| 1952-11-25 | Drill Stem Test Performed |
| 1952-11-27 | Drill Stem Test Performed |
| 1952-11-28 | Drill Stem Test Performed |
| 1952-12-09 | Drill Stem Test Performed |
| 1952-12-13 | Finished Drilling |
| 1952-12-13 | Well Mode changed to Drilled and Cased |
| 1952-12-15 | Production Casing Operation Performed |
| 1952-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1953-01-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1953-02-02 | Well Began Production |
| 1953-02-02 | Well Fluid changed to Crude Oil |
| 1953-02-02 | Well Mode changed to Pumping |
| 1953-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-02-20 | Perforation Treatment Performed - Cement Squeeze |
| 1953-02-20 | Perforation Treatment Performed - Jet Perforation |
| 1953-09-06 | Perforation Treatment Performed - Jet Perforation |
| 1953-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-09-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1953-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1953-10-26 | Perforation Treatment Performed - Jet Perforation |
| 1953-10-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1953-12-15 | Well Fluid changed to Crude Oil |
| 1953-12-15 | Well Mode changed to Suspended |
| 1954-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1954-06-23 | Well Fluid changed to Crude Oil |
| 1954-06-23 | Well Mode changed to Abandoned Zone |
| 1972-03-15 | Perforation Treatment Performed - Jet Perforation |
| 1972-03-16 | Perforation Treatment Performed - Jet Perforation |
| 1972-03-18 | Perforation Treatment Performed - Jet Perforation |
| 2000-11-28 | Perforation Treatment Performed - Cement Plug |
| 2000-11-28 | Plug Back Performed |
| 2000-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-11-29 | Perforation Treatment Performed - Cement Plug |
| 2000-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2000-11-29 | Perforation Treatment Performed - Remedial Casing |
| 2000-11-29 | Plug Back Performed |
| 2000-11-29 | Well Log Performed |
| 2001-02-28 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-12-16 | Perforation | 1080.80 | 1083.90 | 13 |
| 1953-10-26 | Perforation | 1067.10 | 1069.80 | 10 |
| 1953-10-26 | Perforation | 1065.30 | 1067.10 | 10 |
| 1953-10-26 | Perforation | 1067.10 | 1069.80 | 3 |
| 1953-10-26 | Perforation | 1065.30 | 1067.10 | 7 |
| 1953-10-27 | Acid Wash | 1065.30 | 1084.50 | 0 |
| 1954-06-23 | Packing Device Capped w/Cement | 1040.90 | 1040.90 | 0 |
| 1972-03-15 | Perforation | 872.60 | 872.90 | 13 |
| 1972-03-16 | Perforation | 872.90 | 873.30 | 13 |
| 1972-03-18 | Perforation | 858.60 | 859.80 | 7 |
| 1972-03-18 | Perforation | 861.40 | 862.00 | 7 |
| 1953-01-04 | Acid Wash | 1080.80 | 1083.90 | 0 |
| 2000-11-28 | Cement Plug | 1030.00 | 1040.00 | 0 |
| 2000-11-29 | Packing Device Capped w/Cement | 840.00 | 850.00 | 0 |
| 2000-11-29 | Perforation | 219.00 | 220.00 | 14 |
| 2000-11-29 | Remedial Casing Cementing | 219.00 | 220.00 | 0 |
| 2000-11-29 | Cement Plug | 150.00 | 219.00 | 0 |
| 1953-02-20 | Cement Squeeze | 1080.80 | 1083.90 | 0 |
| 1953-02-20 | Perforation | 1079.60 | 1082.60 | 13 |
| 1953-02-20 | Acid Treatment | 1079.60 | 1082.60 | 0 |
| 1953-09-06 | Perforation | 1082.60 | 1084.50 | 13 |
| 1953-09-08 | Acid Treatment | 1082.60 | 1084.50 | 0 |
| 1953-09-09 | Acid Wash | 1082.60 | 1084.50 | 0 |
| 1953-09-10 | Acid Treatment | 1082.60 | 1084.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]