If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464190207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.934752,"lon":-112.652306,"icon":""}]} |
Location: 00/07-02-046-19W4/0 | |
Location Alias: 00/07-02-46-19 W4M | |
Location Alias 2: 00/07-02-046-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 19 | |
Section: 02 | |
County/Municipality: Camrose County | |
Well Name: SCEPTRE BRUCE 7-2-46-19 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0190128 | |
License Date: 1996-08-01 | |
License Status: RecCertified | |
Spud Date: 1996-09-26 | |
Final Drill Date: 1996-09-29 | |
Well Total Depth: 1150.00 m | |
Surface Hole Latitude: 52.934752 | |
Surface Hole Longitude: -112.652306 |
Date | Event |
---|---|
1996-08-01 | Obtained License |
1996-09-27 | Surface Casing Operation Performed |
1996-09-29 | Finished Drilling |
1996-09-29 | Well Log Performed |
1996-09-29 | Well Mode changed to Drilled and Cased |
1996-09-30 | Production Casing Operation Performed |
1996-09-30 | Rig Released |
1996-10-07 | Well Log Performed |
1996-10-08 | Perforation Treatment Performed - Jet Perforation |
1996-11-20 | Well Began Production |
1996-11-20 | Well Fluid changed to Gas |
1996-11-20 | Well Mode changed to Flowing |
1999-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-26 | Plug Back Performed |
1999-11-26 | Well Log Performed |
1999-11-27 | Well Abandoned |
1999-11-27 | Well Fluid changed to Gas |
1999-11-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-10-08 | Perforation | 1081.00 | 1082.50 | 13 |
1999-11-26 | Packing Device Capped w/Cement | 1067.00 | 1075.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 760 | 0.0 | 0.0 | 0.0 |
1997 | 1366 | 0.0 | 0.0 | 0.0 |
For data sources see[5]