If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464200507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.932755,"lon":-112.865309,"icon":""}]} |
Location: 00/07-05-046-20W4/0 | |
Location Alias: 00/07-05-46-20 W4M | |
Location Alias 2: 00/07-05-046-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 20 | |
Section: 05 | |
County/Municipality: Camrose County | |
Well Name: DEVON BITT 7-5-46-20 | |
Operator Name: Devon Canada Corporation | |
License Number: 0061537 | |
License Date: 1976-12-07 | |
License Status: RecCertified | |
Spud Date: 1976-12-07 | |
Final Drill Date: 1976-12-19 | |
Well Total Depth: 1327.40 m | |
Surface Hole Latitude: 52.932755 | |
Surface Hole Longitude: -112.865309 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-12-07 | Obtained License |
1976-12-08 | Lost Circulation Occurred |
1976-12-19 | Finished Drilling |
1976-12-21 | Production Casing Operation Performed |
1976-12-21 | Well Mode changed to Drilled and Cased |
1977-01-16 | Perforation Treatment Performed - Jet Perforation |
1977-01-18 | Perforation Treatment Performed - Cement Squeeze |
1977-01-20 | Perforation Treatment Performed - Jet Perforation |
1981-12-31 | Well Began Production |
1981-12-31 | Well Fluid changed to Gas |
1981-12-31 | Well Mode changed to Flowing |
1985-06-18 | Well Fluid changed to Gas |
1985-06-18 | Well Mode changed to Suspended |
1986-02-12 | Perforation Treatment Performed - Jet Perforation |
1986-02-12 | Well Log Performed |
1987-11-29 | Well Log Performed |
1989-01-01 | Well Fluid changed to Gas |
1989-01-01 | Well Mode changed to Flowing |
1990-06-30 | Well Fluid changed to Gas |
1990-06-30 | Well Mode changed to Suspended |
2007-02-20 | Well Log Performed |
2007-02-21 | Well Log Performed |
2007-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-22 | Perforation Treatment Performed - Jet Perforation |
2007-02-22 | Plug Back Performed |
2007-02-22 | Well Fluid changed to Gas |
2007-02-22 | Well Mode changed to Abandoned Zone |
2007-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-23 | Perforation Treatment Performed - Remedial Casing |
2007-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-02-25 | Perforation Treatment Performed - Cement Plug |
2007-02-25 | Perforation Treatment Performed - Jet Perforation |
2007-02-25 | Perforation Treatment Performed - Remedial Casing |
2007-03-03 | Well Abandoned |
2007-03-03 | Well Fluid changed to Gas |
2007-03-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-01-16 | Perforation | 1204.00 | 1205.20 | 13 |
2007-02-25 | Remedial Casing Cementing | 345.00 | 346.00 | 0 |
2007-02-25 | Packing Device Capped w/Cement | 318.00 | 323.00 | 0 |
2007-02-25 | Cement Plug | 212.40 | 256.30 | 0 |
1977-01-18 | Cement Squeeze | 1204.00 | 1205.20 | 0 |
1977-01-20 | Perforation | 1195.40 | 1197.30 | 13 |
1986-02-12 | Perforation | 1200.20 | 1202.70 | 13 |
2007-02-22 | Packing Device Capped w/Cement | 1077.00 | 1085.00 | 0 |
2007-02-22 | Perforation | 482.00 | 483.00 | 17 |
2007-02-23 | Remedial Casing Cementing | 482.00 | 483.00 | 0 |
2007-02-23 | Packing Device Capped w/Cement | 459.00 | 474.00 | 0 |
2007-02-25 | Perforation | 345.00 | 346.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 24 | 0.0 | 0.0 | 0.0 |
1982 | 6354 | 0.0 | 0.0 | 0.0 |
1983 | 1521 | 0.0 | 0.0 | 0.0 |
1987 | 39 | 0.0 | 0.0 | 0.0 |
1988 | 291 | 0.0 | 0.0 | 0.0 |
1989 | 5184 | 0.0 | 0.0 | 0.0 |
1990 | 2901 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-12-08 | Lost Circulation | 21.30 | 59.70 |
For data sources see[6]