If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464283507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.00879,"lon":-113.954057,"icon":""}]} |
Location: 00/07-35-046-28W4/0 | |
Location Alias: 00/07-35-46-28 W4M | |
Location Alias 2: 00/07-35-046-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 28 | |
Section: 35 | |
County/Municipality: Pigeon Lake 138A | |
Well Name: ESSO PIGEON LAKE NO. 7-35 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0008722 | |
License Date: 1954-11-15 | |
License Status: Abandoned | |
Spud Date: 1954-11-15 | |
Final Drill Date: 1954-12-29 | |
Well Total Depth: 2179.10 m | |
Surface Hole Latitude: 53.008790 | |
Surface Hole Longitude: -113.954057 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-11-15 | Obtained License |
1954-12-22 | Production Casing Operation Performed |
1954-12-29 | Finished Drilling |
1954-12-29 | Perforation Treatment Performed - Open-Hole Completion |
1954-12-29 | Well Mode changed to Drilled and Cased |
1955-01-03 | Well Began Production |
1955-01-03 | Well Fluid changed to Crude Oil |
1955-01-03 | Well Mode changed to Flowing |
1985-03-11 | Well Log Performed |
1985-07-19 | Well Log Performed |
1985-07-20 | Perforation Treatment Performed - Open-Hole Completion |
1985-07-24 | Liner Casing Operation Performed |
1985-07-24 | Perforation Treatment Performed - Cement Squeeze |
1985-07-26 | Well Log Performed |
1985-07-27 | Perforation Treatment Performed - Jet Perforation |
1985-07-27 | Well Log Performed |
1985-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-07-29 | Well Fluid changed to Crude Oil |
1985-07-29 | Well Mode changed to Pumping |
1986-04-28 | Well Log Performed |
1986-05-01 | Well Log Performed |
1986-06-19 | Perforation Treatment Performed - Cement Squeeze |
1986-06-25 | Perforation Treatment Performed - Jet Perforation |
1986-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-09-09 | Well Log Performed |
1986-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-23 | Perforation Treatment Performed - Cement Squeeze |
1987-03-26 | Perforation Treatment Performed - Jet Perforation |
1987-03-26 | Well Log Performed |
1987-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-31 | Perforation Treatment Performed - Chemical Squeeze |
1988-03-16 | Well Log Performed |
1988-03-17 | Perforation Treatment Performed - Cement Squeeze |
1988-03-21 | Perforation Treatment Performed - Jet Perforation |
1988-03-21 | Well Log Performed |
1988-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-03 | Perforation Treatment Performed - Cement Squeeze |
1989-03-06 | Perforation Treatment Performed - Jet Perforation |
1989-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-04-11 | Perforation Treatment Performed - Jet Perforation |
1991-04-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-06 | Perforation Treatment Performed - Jet Perforation |
1992-10-06 | Well Log Performed |
1992-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-29 | Well Log Performed |
1993-08-30 | Perforation Treatment Performed - Cement Squeeze |
1993-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-31 | Perforation Treatment Performed - Jet Perforation |
1993-08-31 | Well Log Performed |
1995-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-11-21 | Perforation Treatment Performed - Jet Perforation |
1995-11-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-21 | Perforation Treatment Performed - Jet Perforation |
1997-08-20 | Perforation Treatment Performed - Jet Perforation |
1997-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-04-23 | Perforation Treatment Performed - Jet Perforation |
1998-04-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-09-01 | Well Fluid changed to Crude Oil |
1998-09-01 | Well Mode changed to Suspended |
2002-06-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-06-27 | Plug Back Performed |
2002-06-27 | Well Fluid changed to Crude Oil |
2002-06-27 | Well Mode changed to Abandoned Zone |
2002-06-28 | Perforation Treatment Performed - Cement Plug |
2002-07-02 | Perforation Treatment Performed - Jet Perforation |
2002-07-03 | Perforation Treatment Performed - Remedial Casing |
2002-07-04 | Perforation Treatment Performed - Jet Perforation |
2002-07-04 | Perforation Treatment Performed - Remedial Casing |
2002-07-04 | Well Log Performed |
2002-12-10 | Well Abandoned |
2002-12-10 | Well Fluid changed to Crude Oil |
2002-12-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-12-29 | Open Hole/Barefoot Completion | 2068.70 | 2158.30 | 0 |
1986-10-04 | Acid Treatment | 2150.00 | 2150.50 | 0 |
1986-11-12 | Acid Treatment | 2150.00 | 2150.50 | 0 |
1987-03-23 | Cement Squeeze | 2150.00 | 2150.50 | 0 |
1987-03-26 | Perforation | 2148.50 | 2149.00 | 13 |
1987-03-30 | Acid Treatment | 2148.00 | 2149.00 | 0 |
1987-03-31 | Chemical Squeeze | 2148.00 | 2149.00 | 0 |
1988-03-17 | Cement Squeeze | 2148.00 | 2149.00 | 0 |
1988-03-21 | Perforation | 2146.50 | 2147.50 | 13 |
1988-03-22 | Acid Treatment | 2146.50 | 2147.50 | 0 |
1989-03-03 | Cement Squeeze | 2146.50 | 2147.50 | 0 |
1985-07-20 | Open Hole/Barefoot Completion | 2068.70 | 2179.10 | 0 |
1989-03-06 | Perforation | 2144.40 | 2144.90 | 13 |
1989-03-07 | Acid Treatment | 2144.40 | 2144.90 | 0 |
1991-04-11 | Perforation | 2143.90 | 2144.90 | 20 |
1991-04-12 | Acid Treatment | 2143.90 | 2144.90 | 0 |
1992-10-06 | Perforation | 2137.00 | 2137.60 | 13 |
1992-10-07 | Acid Treatment | 2137.00 | 2137.60 | 0 |
1993-08-30 | Cement Squeeze | 2137.00 | 2137.60 | 0 |
1993-08-31 | Perforation | 2130.00 | 2130.50 | 13 |
1993-08-31 | Acid Treatment | 2130.00 | 2130.50 | 0 |
1995-11-18 | Packing Device Capped w/Cement | 2128.20 | 2135.00 | 0 |
1985-07-24 | Cement Squeeze | 2068.70 | 2179.10 | 0 |
1995-11-21 | Perforation | 2127.50 | 2128.00 | 13 |
1995-11-22 | Acid Treatment | 2127.50 | 2128.00 | 0 |
1997-01-21 | Perforation | 2122.60 | 2123.20 | 20 |
1997-08-20 | Perforation | 2114.70 | 2115.70 | 20 |
1997-08-21 | Acid Treatment | 2114.70 | 2115.70 | 0 |
1998-04-23 | Perforation | 2109.50 | 2110.50 | 20 |
1998-04-24 | Acid Treatment | 2109.50 | 2110.50 | 0 |
2002-06-27 | Packing Device Capped w/Cement | 1981.00 | 2101.50 | 0 |
2002-06-28 | Cement Plug | 1522.00 | 1684.50 | 0 |
2002-07-02 | Perforation | 554.00 | 554.50 | 26 |
1985-07-27 | Perforation | 2145.50 | 2146.00 | 13 |
2002-07-03 | Remedial Casing Cementing | 554.00 | 554.50 | 0 |
2002-07-04 | Perforation | 282.00 | 282.50 | 26 |
2002-07-04 | Remedial Casing Cementing | 282.00 | 282.50 | 0 |
1985-07-28 | Acid Treatment | 2145.50 | 2146.00 | 0 |
1986-06-19 | Cement Squeeze | 2145.50 | 2146.00 | 0 |
1986-06-25 | Perforation | 2150.00 | 2150.50 | 13 |
1986-06-26 | Acid Treatment | 2150.00 | 2150.50 | 0 |
1986-09-10 | Acid Treatment | 2150.00 | 2150.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 1672 | 0.0 | 0.0 | 0.0 |
1974 | 6651 | 0.0 | 0.0 | 0.0 |
1975 | 4208 | 0.0 | 0.0 | 0.0 |
1976 | 2961 | 0.0 | 0.0 | 0.0 |
1977 | 4317 | 0.0 | 0.0 | 0.0 |
1978 | 5926 | 0.0 | 0.0 | 0.0 |
1979 | 8228 | 0.0 | 0.0 | 0.0 |
1980 | 7718 | 0.0 | 0.0 | 0.0 |
1981 | 7690 | 0.0 | 0.0 | 0.0 |
1982 | 6476 | 0.0 | 0.0 | 0.0 |
1983 | 6080 | 0.0 | 0.0 | 0.0 |
1984 | 1598 | 0.0 | 0.0 | 0.0 |
1985 | 3069 | 0.0 | 0.0 | 0.0 |
1986 | 3941 | 0.0 | 0.0 | 0.0 |
1987 | 312 | 0.0 | 0.0 | 0.0 |
1988 | 306 | 0.0 | 0.0 | 0.0 |
1989 | 6464 | 0.0 | 0.0 | 0.0 |
1990 | 7185 | 0.0 | 0.0 | 0.0 |
1991 | 7581 | 0.0 | 0.0 | 0.0 |
1992 | 8438 | 0.0 | 0.0 | 0.0 |
1993 | 7392 | 0.0 | 0.0 | 0.0 |
1994 | 8257 | 0.0 | 0.0 | 0.0 |
1995 | 7569 | 0.0 | 0.0 | 0.0 |
1996 | 8550 | 0.0 | 0.0 | 0.0 |
1997 | 6996 | 0.0 | 0.0 | 0.0 |
1998 | 4259 | 0.0 | 0.0 | 0.0 |
For data sources see[5]