If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0464283510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.012454,"lon":-113.953985,"icon":""}]} |
| Location: 00/10-35-046-28W4/0 | |
| Location Alias: 00/10-35-46-28 W4M | |
| Location Alias 2: 00/10-35-046-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 046 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 35 | |
| County/Municipality: Pigeon Lake 138A | |
| Well Name: ESSO PIGEON LAKE NO. 10-35 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0008003 | |
| License Date: 1954-08-05 | |
| License Status: Abandoned | |
| Spud Date: 1954-09-23 | |
| Final Drill Date: 1954-11-06 | |
| Well Total Depth: 2169.90 m | |
| Surface Hole Latitude: 53.012454 | |
| Surface Hole Longitude: -113.953985 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1954-08-05 | Obtained License |
| 1954-10-29 | Liner Casing Operation Performed |
| 1954-11-06 | Finished Drilling |
| 1954-11-06 | Well Mode changed to Drilled and Cased |
| 1954-11-08 | Well Log Performed |
| 1954-11-10 | Perforation Treatment Performed - Bullet Perforation |
| 1954-11-10 | Perforation Treatment Performed - Jet Perforation |
| 1954-11-11 | Well Began Production |
| 1954-11-11 | Well Fluid changed to Crude Oil |
| 1954-11-11 | Well Mode changed to Flowing |
| 1974-02-01 | Perforation Treatment Performed - Jet Perforation |
| 1974-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-09-27 | Perforation Treatment Performed - Cement Squeeze |
| 1982-09-28 | Perforation Treatment Performed - Cement Squeeze |
| 1982-10-04 | Perforation Treatment Performed - Open-Hole Completion |
| 1982-10-06 | Perforation Treatment Performed - Jet Perforation |
| 1982-10-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-03-13 | Well Log Performed |
| 1985-08-30 | Well Fluid changed to Crude Oil |
| 1985-08-30 | Well Mode changed to Pumping |
| 1986-09-25 | Well Log Performed |
| 1986-09-28 | Well Log Performed |
| 1986-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1986-09-29 | Perforation Treatment Performed - Cement Squeeze |
| 1986-09-30 | Perforation Treatment Performed - Jet Perforation |
| 1986-09-30 | Well Log Performed |
| 1987-01-06 | Well Log Performed |
| 1987-05-26 | Perforation Treatment Performed - Cement Squeeze |
| 1987-05-26 | Well Log Performed |
| 1987-05-28 | Perforation Treatment Performed - Jet Perforation |
| 1987-05-28 | Well Log Performed |
| 1987-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-11-01 | Well Fluid changed to Crude Oil |
| 1991-11-01 | Well Mode changed to Suspended |
| 1992-11-18 | Perforation Treatment Performed - Jet Perforation |
| 1992-11-18 | Well Log Performed |
| 1992-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-12-01 | Well Fluid changed to Crude Oil |
| 1992-12-01 | Well Mode changed to Pumping |
| 1993-01-26 | Well Log Performed |
| 1993-01-27 | Perforation Treatment Performed - Cement Squeeze |
| 1993-01-29 | Perforation Treatment Performed - Jet Perforation |
| 1993-02-03 | Perforation Treatment Performed - Cement Squeeze |
| 1993-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-01 | Well Fluid changed to Crude Oil |
| 2000-02-01 | Well Mode changed to Suspended |
| 2002-04-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-04-15 | Perforation Treatment Performed - Cement Plug |
| 2002-04-15 | Plug Back Performed |
| 2002-04-15 | Well Fluid changed to Crude Oil |
| 2002-04-15 | Well Mode changed to Abandoned Zone |
| 2002-04-16 | Perforation Treatment Performed - Cement Plug |
| 2002-04-16 | Plug Back Performed |
| 2002-12-12 | Well Abandoned |
| 2002-12-12 | Well Fluid changed to Crude Oil |
| 2002-12-12 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1954-11-10 | Bullet Perforation | 2126.90 | 2133.00 | 13 |
| 1986-09-29 | Cement Squeeze | 2154.00 | 2156.00 | 0 |
| 1986-09-29 | Packing Device Capped w/Cement | 2154.10 | 2158.00 | 0 |
| 1986-09-30 | Perforation | 2151.60 | 2152.10 | 13 |
| 1987-05-26 | Cement Squeeze | 2151.60 | 2152.00 | 0 |
| 1987-05-28 | Perforation | 2149.00 | 2149.50 | 13 |
| 1987-05-29 | Acid Treatment | 2149.00 | 2149.50 | 0 |
| 1988-08-30 | Acid Treatment | 2149.00 | 2149.50 | 0 |
| 1992-11-18 | Perforation | 2140.90 | 2141.50 | 20 |
| 1992-11-19 | Acid Treatment | 2140.90 | 2141.50 | 0 |
| 1993-01-27 | Cement Squeeze | 2140.90 | 2141.50 | 0 |
| 1954-11-10 | Perforation | 2126.90 | 2133.00 | 13 |
| 1993-01-29 | Perforation | 2137.60 | 2138.30 | 20 |
| 1993-02-03 | Cement Squeeze | 2137.60 | 2138.30 | 0 |
| 1993-02-04 | Perforation | 2133.30 | 2134.00 | 20 |
| 1993-02-04 | Acid Treatment | 2133.30 | 2134.00 | 0 |
| 2002-04-15 | Packing Device Capped w/Cement | 1964.80 | 2118.30 | 0 |
| 2002-04-15 | Cement Plug | 1530.00 | 1684.00 | 0 |
| 2002-04-16 | Cement Plug | 96.70 | 1530.00 | 0 |
| 1974-02-01 | Perforation | 2148.20 | 2151.30 | 7 |
| 1974-02-06 | Acid Treatment | 2148.20 | 2151.30 | 0 |
| 1982-09-27 | Cement Squeeze | 2126.90 | 2151.30 | 0 |
| 1982-09-28 | Cement Squeeze | 2126.90 | 2151.30 | 0 |
| 1982-10-04 | Open Hole/Barefoot Completion | 2159.80 | 2169.90 | 0 |
| 1982-10-06 | Perforation | 2154.00 | 2156.00 | 7 |
| 1982-10-07 | Acid Treatment | 2154.00 | 2156.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1973 | 1611 | 0.0 | 0.0 | 0.0 |
| 1974 | 7486 | 0.0 | 0.0 | 0.0 |
| 1975 | 6264 | 0.0 | 0.0 | 0.0 |
| 1976 | 5637 | 0.0 | 0.0 | 0.0 |
| 1977 | 5777 | 0.0 | 0.0 | 0.0 |
| 1978 | 5705 | 0.0 | 0.0 | 0.0 |
| 1979 | 8663 | 0.0 | 0.0 | 0.0 |
| 1980 | 7653 | 0.0 | 0.0 | 0.0 |
| 1981 | 5477 | 0.0 | 0.0 | 0.0 |
| 1982 | 2536 | 0.0 | 0.0 | 0.0 |
| 1983 | 3072 | 0.0 | 0.0 | 0.0 |
| 1984 | 5329 | 0.0 | 0.0 | 0.0 |
| 1985 | 6763 | 0.0 | 0.0 | 0.0 |
| 1986 | 6358 | 0.0 | 0.0 | 0.0 |
| 1987 | 4627 | 0.0 | 0.0 | 0.0 |
| 1988 | 7953 | 0.0 | 0.0 | 0.0 |
| 1989 | 7766 | 0.0 | 0.0 | 0.0 |
| 1990 | 3176 | 0.0 | 0.0 | 0.0 |
| 1992 | 519 | 0.0 | 0.0 | 0.0 |
| 1993 | 4055 | 0.0 | 0.0 | 0.0 |
| 1994 | 4162 | 0.0 | 0.0 | 0.0 |
| 1995 | 3572 | 0.0 | 0.0 | 0.0 |
| 1996 | 7779 | 0.0 | 0.0 | 0.0 |
| 1997 | 8719 | 0.0 | 0.0 | 0.0 |
| 1998 | 8371 | 0.0 | 0.0 | 0.0 |
| 1999 | 1032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]