If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464283606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.008857,"lon":-113.936898,"icon":""}]} |
Location: 00/06-36-046-28W4/0 | |
Location Alias: 00/06-36-46-28 W4M | |
Location Alias 2: 00/06-36-046-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 28 | |
Section: 36 | |
County/Municipality: Pigeon Lake 138A | |
Well Name: ESSO PIGEON LAKE NO. 6-36 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0007168 | |
License Date: 1953-10-09 | |
License Status: Abandoned | |
Spud Date: 1953-10-15 | |
Final Drill Date: 1953-11-25 | |
Well Total Depth: 2194.00 m | |
Surface Hole Latitude: 53.008857 | |
Surface Hole Longitude: -113.936898 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-10-09 | Obtained License |
1953-11-21 | Liner Casing Operation Performed |
1953-11-25 | Finished Drilling |
1953-11-25 | Well Mode changed to Drilled and Cased |
1953-11-28 | Perforation Treatment Performed - Bullet Perforation |
1953-11-28 | Perforation Treatment Performed - Jet Perforation |
1953-12-02 | Well Began Production |
1953-12-02 | Well Fluid changed to Crude Oil |
1953-12-02 | Well Mode changed to Flowing |
1967-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-03-27 | Perforation Treatment Performed - Open-Hole Completion |
1979-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-03-06 | Well Log Performed |
1985-03-07 | Perforation Treatment Performed - Cement Squeeze |
1985-03-13 | Perforation Treatment Performed - Open-Hole Completion |
1985-03-19 | Well Log Performed |
1985-03-21 | Well Fluid changed to Crude Oil |
1985-03-21 | Well Mode changed to Pumping |
1990-07-17 | Well Log Performed |
1990-07-24 | Perforation Treatment Performed - Cement Plug |
1990-07-24 | Perforation Treatment Performed - Open-Hole Completion |
1990-07-30 | Perforation Treatment Performed - Jet Perforation |
1990-07-30 | Well Log Performed |
1990-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-10-20 | Well Log Performed |
1991-10-23 | Perforation Treatment Performed - Jet Perforation |
1991-10-23 | Well Log Performed |
1991-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-12-20 | Well Fluid changed to Crude Oil |
1991-12-20 | Well Mode changed to Suspended |
1993-05-24 | Perforation Treatment Performed - Jet Perforation |
1993-05-25 | Perforation Treatment Performed - Cement Squeeze |
1993-05-27 | Perforation Treatment Performed - Jet Perforation |
1993-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-05-30 | Perforation Treatment Performed - Jet Perforation |
1993-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-03 | Perforation Treatment Performed - Jet Perforation |
1993-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-07 | Perforation Treatment Performed - Jet Perforation |
1993-07-03 | Well Fluid changed to Crude Oil |
1993-07-03 | Well Mode changed to Pumping |
1993-08-06 | Perforation Treatment Performed - Chemical Squeeze |
1993-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-16 | Perforation Treatment Performed - Jet Perforation |
1997-09-16 | Well Log Performed |
1997-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-04-18 | Perforation Treatment Performed - Jet Perforation |
1998-04-18 | Well Log Performed |
1998-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-17 | Perforation Treatment Performed - Jet Perforation |
1999-11-17 | Well Log Performed |
1999-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-10-01 | Well Fluid changed to Crude Oil |
2000-10-01 | Well Mode changed to Suspended |
2002-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-08-18 | Plug Back Performed |
2002-08-18 | Well Fluid changed to Crude Oil |
2002-08-18 | Well Mode changed to Abandoned Zone |
2002-08-19 | Perforation Treatment Performed - Cement Plug |
2002-08-19 | Plug Back Performed |
2002-08-20 | Perforation Treatment Performed - Cement Plug |
2002-08-20 | Plug Back Performed |
2003-07-29 | Well Abandoned |
2003-07-29 | Well Fluid changed to Crude Oil |
2003-07-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-11-28 | Bullet Perforation | 2159.50 | 2165.60 | 13 |
1990-07-30 | Perforation | 2180.70 | 2181.20 | 20 |
1990-08-01 | Acid Treatment | 2180.70 | 2181.20 | 0 |
1991-10-23 | Perforation | 2177.20 | 2178.20 | 20 |
1991-10-24 | Acid Treatment | 2177.20 | 2178.20 | 0 |
1993-05-24 | Perforation | 2175.00 | 2175.30 | 75 |
1993-05-25 | Cement Squeeze | 2175.00 | 2178.20 | 0 |
1993-05-27 | Perforation | 2172.00 | 2173.00 | 20 |
1993-05-28 | Acid Treatment | 2172.00 | 2173.00 | 0 |
1993-05-30 | Perforation | 2168.00 | 2168.50 | 13 |
1993-05-31 | Acid Treatment | 2168.00 | 2168.50 | 0 |
1953-11-28 | Perforation | 2159.50 | 2165.60 | 13 |
1993-06-03 | Perforation | 2164.30 | 2164.80 | 13 |
1993-06-04 | Acid Treatment | 2164.30 | 2164.80 | 0 |
1993-06-07 | Perforation | 2166.00 | 2166.50 | 13 |
1993-08-06 | Chemical Squeeze | 2168.00 | 2168.50 | 0 |
1993-08-08 | Acid Treatment | 2166.00 | 2166.50 | 0 |
1997-09-16 | Perforation | 2153.70 | 2154.70 | 16 |
1997-09-17 | Acid Treatment | 2153.70 | 2154.70 | 0 |
1997-09-22 | Acid Treatment | 2153.70 | 2154.70 | 0 |
1998-04-18 | Perforation | 2147.80 | 2148.80 | 16 |
1998-04-19 | Acid Treatment | 2147.80 | 2148.80 | 0 |
1967-07-26 | Acid Treatment | 2159.50 | 2165.60 | 0 |
1999-11-17 | Perforation | 2128.50 | 2129.50 | 17 |
1999-11-18 | Acid Treatment | 2128.50 | 2129.50 | 0 |
2002-08-18 | Packing Device Capped w/Cement | 2061.00 | 2120.00 | 0 |
2002-08-19 | Cement Plug | 1587.20 | 1722.10 | 0 |
2002-08-20 | Cement Plug | 480.60 | 1587.20 | 0 |
1979-03-27 | Open Hole/Barefoot Completion | 2182.00 | 2194.00 | 0 |
1979-04-06 | Acid Treatment | 2159.50 | 2165.60 | 0 |
1985-03-07 | Cement Squeeze | 2159.50 | 2194.00 | 0 |
1985-03-13 | Open Hole/Barefoot Completion | 2182.00 | 2186.50 | 0 |
1990-07-24 | Cement Plug | 2182.00 | 2186.50 | 0 |
1990-07-24 | Open Hole/Barefoot Completion | 2182.00 | 2186.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 3519 | 0.0 | 0.0 | 0.0 |
1968 | 5443 | 0.0 | 0.0 | 0.0 |
1969 | 7270 | 0.0 | 0.0 | 0.0 |
1970 | 7615 | 0.0 | 0.0 | 0.0 |
1971 | 6155 | 0.0 | 0.0 | 0.0 |
1972 | 7808 | 0.0 | 0.0 | 0.0 |
1973 | 7261 | 0.0 | 0.0 | 0.0 |
1974 | 7278 | 0.0 | 0.0 | 0.0 |
1975 | 5917 | 0.0 | 0.0 | 0.0 |
1976 | 3309 | 0.0 | 0.0 | 0.0 |
1977 | 4942 | 0.0 | 0.0 | 0.0 |
1978 | 1106 | 0.0 | 0.0 | 0.0 |
1979 | 7189 | 0.0 | 0.0 | 0.0 |
1980 | 7596 | 0.0 | 0.0 | 0.0 |
1981 | 7231 | 0.0 | 0.0 | 0.0 |
1982 | 7038 | 0.0 | 0.0 | 0.0 |
1983 | 6159 | 0.0 | 0.0 | 0.0 |
1984 | 2484 | 0.0 | 0.0 | 0.0 |
1985 | 5627 | 0.0 | 0.0 | 0.0 |
1986 | 7389 | 0.0 | 0.0 | 0.0 |
1987 | 7656 | 0.0 | 0.0 | 0.0 |
1988 | 8213 | 0.0 | 0.0 | 0.0 |
1989 | 8181 | 0.0 | 0.0 | 0.0 |
1990 | 5417 | 0.0 | 0.0 | 0.0 |
1991 | 387 | 0.0 | 0.0 | 0.0 |
1993 | 1990 | 0.0 | 0.0 | 0.0 |
1994 | 265 | 0.0 | 0.0 | 0.0 |
1995 | 1976 | 0.0 | 0.0 | 0.0 |
1996 | 5205 | 0.0 | 0.0 | 0.0 |
1997 | 1445 | 0.0 | 0.0 | 0.0 |
1998 | 4514 | 0.0 | 0.0 | 0.0 |
1999 | 8063 | 0.0 | 0.0 | 0.0 |
2000 | 5119 | 0.0 | 0.0 | 0.0 |
For data sources see[5]