If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0464283614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.015928,"lon":-113.936888,"icon":""}]} |
Location: 00/14-36-046-28W4/2 | |
Location Alias: 00/14-36-46-28 W4M | |
Location Alias 2: 00/14-36-046-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 4 | |
Range: 28 | |
Section: 36 | |
County/Municipality: Pigeon Lake 138A | |
Well Name: ESSO BGLEN 14-36-46-28 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0004738 | |
License Date: 1952-05-03 | |
License Status: Abandoned | |
Spud Date: 1952-06-10 | |
Final Drill Date: 1952-08-18 | |
Well Total Depth: 2206.80 m | |
Surface Hole Latitude: 53.015928 | |
Surface Hole Longitude: -113.936888 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-05-03 | Obtained License |
1952-06-24 | Drill Stem Test Performed |
1952-07-02 | Drill Stem Test Performed |
1952-07-19 | Drill Stem Test Performed |
1952-07-20 | Drill Stem Test Performed |
1952-07-26 | Drill Stem Test Performed |
1952-07-28 | Liner Casing Operation Performed |
1952-08-05 | Drill Stem Test Performed |
1952-08-06 | Drill Stem Test Performed |
1952-08-08 | Drill Stem Test Performed |
1952-08-09 | Drill Stem Test Performed |
1952-08-10 | Drill Stem Test Performed |
1952-08-16 | Drill Stem Test Performed |
1952-08-18 | Drill Stem Test Performed |
1952-08-18 | Finished Drilling |
1952-08-18 | Well Mode changed to Drilled and Cased |
1952-08-22 | Perforation Treatment Performed - Bullet Perforation |
1952-08-22 | Perforation Treatment Performed - Jet Perforation |
1952-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-11-13 | Perforation Treatment Performed - Jet Perforation |
1958-11-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-11-14 | Perforation Treatment Performed - Jet Perforation |
1958-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-11-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-12-14 | Well Began Production |
1958-12-14 | Well Fluid changed to Crude Oil |
1958-12-14 | Well Mode changed to Pumping |
1963-06-02 | Perforation Treatment Performed - Cement Squeeze |
1963-06-02 | Well Fluid changed to Crude Oil |
1963-06-02 | Well Mode changed to Abandoned Zone |
1963-12-10 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1963-12-10 | Perforation Treatment Performed - Acid Wash - No Pressure |
1963-12-10 | Perforation Treatment Performed - Selective Jet Perforations |
1965-12-10 | Perforation Treatment Performed - Nitrogen Treatment |
1965-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-12-20 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-12-20 | Perforation Treatment Performed - Nitrogen Treatment |
1966-06-30 | Perforation Treatment Performed - Cement Squeeze |
1980-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-09-24 | Perforation Treatment Performed - Cement Squeeze |
1982-10-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-10-06 | Perforation Treatment Performed - Jet Perforation |
1984-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-07 | Perforation Treatment Performed - Jet Perforation |
1988-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-01-06 | Perforation Treatment Performed - Jet Perforation |
1995-02-11 | Well Log Performed |
1997-06-07 | Perforation Treatment Performed - Jet Perforation |
1997-06-07 | Well Log Performed |
1998-04-30 | Perforation Treatment Performed - Jet Perforation |
1998-04-30 | Well Log Performed |
1999-07-21 | Perforation Treatment Performed - Jet Perforation |
1999-07-21 | Well Log Performed |
1999-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-03-02 | Perforation Treatment Performed - Jet Perforation |
2000-03-02 | Well Log Performed |
2000-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-07-17 | Well Log Performed |
2000-07-20 | Perforation Treatment Performed - Jet Perforation |
2000-07-20 | Well Log Performed |
2000-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-07-21 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2014-05-04 | Perforation Treatment Performed - Jet Perforation |
2014-05-04 | Well Log Performed |
2014-05-06 | Perforation Treatment Performed - Remedial Casing |
2014-05-13 | Perforation Treatment Performed - Cement Plug |
2014-05-13 | Plug Back Performed |
2014-05-14 | Perforation Treatment Performed - Jet Perforation |
2014-05-14 | Perforation Treatment Performed - Remedial Casing |
2014-05-14 | Well Log Performed |
2014-05-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-05-15 | Perforation Treatment Performed - Cement Plug |
2015-01-06 | Well Abandoned |
2015-01-06 | Well Fluid changed to Crude Oil |
2015-01-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-08-22 | Perforation | 2179.60 | 2188.80 | 13 |
1963-12-10 | Hydra Jet Perforation | 1940.40 | 1941.00 | 0 |
1963-12-10 | Hydra Jet Perforation | 1943.10 | 1943.10 | 0 |
1963-12-10 | Selective Jet Perforations | 1943.40 | 1944.00 | 0 |
1963-12-10 | Selective Jet Perforations | 1944.90 | 1945.50 | 0 |
1963-12-10 | Selective Jet Perforations | 1948.60 | 1949.50 | 0 |
1963-12-10 | Selective Jet Perforations | 1951.60 | 1951.60 | 0 |
1963-12-10 | Acid Wash | 1940.40 | 1951.60 | 0 |
1965-12-10 | Nitrogen Treatment | 1940.40 | 1951.60 | 0 |
1965-12-20 | Acid Wash | 1940.40 | 1951.60 | 0 |
1965-12-20 | Acid Treatment | 1940.40 | 1951.60 | 0 |
1952-08-22 | Bullet Perforation | 2179.60 | 2188.80 | 13 |
1965-12-20 | Nitrogen Treatment | 1940.40 | 1951.60 | 0 |
1966-06-30 | Cement Squeeze | 1940.40 | 1951.60 | 0 |
1980-09-16 | Acid Treatment | 2179.60 | 2188.80 | 0 |
1982-09-24 | Cement Squeeze | 2179.60 | 2188.80 | 0 |
1982-10-06 | Perforation | 2187.00 | 2189.00 | 13 |
1982-10-06 | Acid Treatment | 2187.00 | 2189.00 | 0 |
1984-04-18 | Acid Treatment | 2187.00 | 2189.00 | 0 |
1988-06-07 | Perforation | 2185.50 | 2186.00 | 13 |
1988-06-08 | Acid Treatment | 2185.50 | 2189.00 | 0 |
1993-01-06 | Perforation | 2174.30 | 2174.80 | 16 |
1952-08-23 | Acid Treatment | 2179.60 | 2188.80 | 0 |
1997-06-07 | Perforation | 2165.00 | 2167.00 | 16 |
1998-04-30 | Perforation | 2160.00 | 2161.00 | 16 |
1999-07-21 | Perforation | 2137.30 | 2138.30 | 20 |
1999-07-22 | Acid Treatment | 2137.30 | 2138.30 | 0 |
2000-03-02 | Perforation | 2043.80 | 2048.00 | 13 |
2000-03-16 | Acid Treatment | 2043.80 | 2048.00 | 0 |
2000-05-11 | Acid Treatment | 2043.30 | 2048.00 | 0 |
2000-07-20 | Perforation | 2044.00 | 2048.00 | 13 |
2000-07-20 | Perforation | 2035.00 | 2039.50 | 13 |
2000-07-21 | Acid Treatment | 2035.00 | 2048.00 | 0 |
1958-11-13 | Perforation | 1951.30 | 1952.90 | 13 |
2000-07-21 | Casing Patch | 1940.40 | 1952.70 | 0 |
2014-05-04 | Perforation | 1439.30 | 1440.30 | 17 |
2014-05-04 | Perforation | 894.00 | 895.00 | 17 |
2014-05-04 | Perforation | 623.60 | 624.60 | 17 |
2014-05-06 | Remedial Casing Cementing | 623.60 | 1440.30 | 0 |
2014-05-13 | Cement Plug | 615.20 | 2026.80 | 0 |
2014-05-14 | Perforation | 561.00 | 562.00 | 17 |
2014-05-14 | Perforation | 479.00 | 480.00 | 17 |
2014-05-14 | Perforation | 446.00 | 447.00 | 17 |
2014-05-14 | Perforation | 414.00 | 415.00 | 17 |
1958-11-14 | Acid Treatment | 1951.30 | 1952.90 | 0 |
2014-05-14 | Perforation | 378.00 | 379.00 | 17 |
2014-05-14 | Perforation | 356.00 | 357.00 | 17 |
2014-05-14 | Perforation | 320.00 | 321.00 | 17 |
2014-05-14 | Perforation | 293.00 | 294.00 | 17 |
2014-05-14 | Perforation | 259.00 | 260.00 | 17 |
2014-05-14 | Perforation | 241.00 | 242.00 | 17 |
2014-05-14 | Perforation | 208.00 | 209.00 | 17 |
2014-05-14 | Perforation | 197.00 | 198.00 | 17 |
2014-05-14 | Perforation | 178.00 | 179.00 | 17 |
2014-05-14 | Remedial Casing Cementing | 178.00 | 562.00 | 0 |
1958-11-14 | Perforation | 1947.40 | 1949.80 | 13 |
2014-05-15 | Cement Plug | 169.40 | 614.80 | 0 |
2014-05-15 | Packing Device Capped w/Cement | 141.00 | 169.00 | 0 |
1958-11-15 | Acid Treatment | 1947.40 | 1949.80 | 0 |
1958-11-17 | Acid Treatment | 1947.40 | 1952.90 | 0 |
1963-06-02 | Cement Squeeze | 1947.40 | 1952.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-05-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]