X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0465070707003

Well Details

Well ID: 0465070707003
Loading map...
Location: 00/07-07-046-07W5/3
Location Alias: 00/07-07-46-07 W5M
Location Alias 2: 00/07-07-046-07 W5/03
Country: Canada
Province: Alberta
Township: 046
Meridian: 5
Range: 07
Section: 07
County/Municipality: County of Wetaskiwin No. 10
Well Name: PETROCON ET AL PEMBINA 7-7-46-7
Operator Name: Bumper Development Corporation Ltd.
License Number: 0088336
License Date: 1981-01-19
License Status: RecCertified
Spud Date: 1981-01-20
Final Drill Date: 1981-02-09
Well Total Depth: 2221.00 m
Surface Hole Latitude: 52.950677
Surface Hole Longitude: -114.999707

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-20 Lost Circulation Occurred
1981-01-19 Obtained License
1981-02-09 Finished Drilling
1981-02-13 Drill Stem Test Performed
1981-02-14 Drill Stem Test Performed
1981-02-16 Drill Stem Test Performed
1981-02-17 Drill Stem Test Performed
1981-02-19 Production Casing Operation Performed
1981-02-25 Perforation Treatment Performed - Jet Perforation
1981-03-02 Perforation Treatment Performed - Cement Squeeze
1981-03-03 Perforation Treatment Performed - Jet Perforation
1981-03-08 Perforation Treatment Performed - Cement Squeeze
1981-03-12 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-03 Perforation Treatment Performed - Cement Squeeze
1981-09-08 Perforation Treatment Performed - Cement Squeeze
1981-09-12 Perforation Treatment Performed - Jet Perforation
1981-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-17 Perforation Treatment Performed - Fractured
1982-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-17 Perforation Treatment Performed - Jet Perforation
1982-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-22 Perforation Treatment Performed - Fractured
1982-07-01 Perforation Treatment Performed - Jet Perforation
1982-07-02 Perforation Treatment Performed - Fractured
1983-10-19 Perforation Treatment Performed - Jet Perforation
1983-10-22 Perforation Treatment Performed - Fractured
1983-12-01 Well Mode changed to Drilled and Cased
1997-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-08 Plug Back Performed
1997-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-09 Perforation Treatment Performed - Jet Perforation
1997-07-09 Plug Back Performed
1997-07-14 Perforation Treatment Performed - Remedial Casing
1997-07-17 Well Abandoned
1997-07-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-25 Perforation 2175.00 2178.50 7
1981-03-13 Acid Treatment 800.00 807.00 0
1981-09-03 Cement Squeeze 800.00 807.00 0
1981-09-08 Cement Squeeze 800.00 807.00 0
1981-09-12 Perforation 2111.50 2114.00 13
1981-09-13 Acid Treatment 2111.50 2114.00 0
1981-09-17 Fracture 2111.50 2114.00 0
1982-06-15 Packing Device Capped w/Cement 2081.00 2092.00 0
1982-06-17 Perforation 1622.00 1625.00 13
1982-06-18 Acid Treatment 1622.00 1625.00 0
1982-06-22 Fracture 1622.00 1625.00 0
1981-03-02 Cement Squeeze 2175.00 2178.50 0
1982-07-01 Perforation 1616.00 1619.00 13
1982-07-02 Fracture 1616.00 1619.00 0
1983-10-19 Perforation 1925.00 1926.00 13
1983-10-22 Fracture 1925.00 1926.00 0
1997-07-08 Packing Device Capped w/Cement 1912.00 1920.00 0
1997-07-09 Packing Device Capped w/Cement 1597.00 1605.00 0
1997-07-09 Packing Device Capped w/Cement 782.00 790.00 0
1997-07-09 Perforation 414.00 415.00 13
1997-07-14 Remedial Casing Cementing 414.00 415.00 0
1981-03-03 Perforation 800.00 802.00 7
1981-03-03 Perforation 803.00 804.00 7
1981-03-03 Perforation 805.00 807.00 7
1981-03-08 Cement Squeeze 800.00 807.00 0
1981-03-12 Perforation 800.00 802.00 7
1981-03-12 Perforation 803.00 804.00 7
1981-03-12 Perforation 805.00 807.00 7

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-01-20 Lost Circulation 75.00 130.00

For data sources see[5]

References