If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0465101011000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.95272,"lon":-115.370447,"icon":""}]} |
Location: 00/11-10-046-10W5/0 | |
Location Alias: 00/11-10-46-10 W5M | |
Location Alias 2: 00/11-10-046-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 046 | |
Meridian: 5 | |
Range: 10 | |
Section: 10 | |
County/Municipality: Brazeau County | |
Well Name: BHP PEMBINA 11-10-46-10 | |
Operator Name: BHP Billiton Canada Inc. | |
License Number: 0178505 | |
License Date: 1995-06-12 | |
License Status: RecCertified | |
Spud Date: 1995-06-28 | |
Final Drill Date: 1995-07-03 | |
Well Total Depth: 543.00 m | |
Surface Hole Latitude: 52.952720 | |
Surface Hole Longitude: -115.370447 |
Date | Event |
---|---|
1995-06-12 | Obtained License |
1995-06-28 | Surface Casing Operation Performed |
1995-07-01 | Well Log Performed |
1995-07-02 | Production Casing Operation Performed |
1995-07-03 | Finished Drilling |
1995-07-03 | Perforation Treatment Performed - Open-Hole Completion |
1995-07-03 | Rig Released |
1995-08-01 | Well Mode changed to Drilled and Cased |
1995-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-09-07 | Plug Back Performed |
1995-09-09 | Well Abandoned |
1995-09-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-07-03 | Open Hole/Barefoot Completion | 519.00 | 543.00 | 0 |
1995-09-07 | Packing Device Capped w/Cement | 503.50 | 511.50 | 0 |
For data sources see[4]